NSSC Safety Conference 2007. Victoria Bridge Incident Grand Mira North Cape Breton County, NS February 12, 2004. Victoria Bridge Incident. - PowerPoint PPT Presentation

TRANSCRIPT

NSSC Safety ConferenceNSSC Safety Conference20072007

Victoria Bridge Incident

Grand Mira NorthCape Breton County, NS

February 12, 2004

Victoria Bridge IncidentVictoria Bridge Incident

On Thursday, February 12, 2004, Transportation and Public Works, Steel Bridge Crew, had a suspended scaffolding incident resulting in serious injuries to one of our employees.

Victoria Bridge IncidentVictoria Bridge Incident

Victoria Bridge is located in Grand Mira North just outside of Sydney, NS

Past the Two Rivers Wildlife Park

DEL Investigators

Suspended Scaffolding

Modified Clamp

Victoria Bridge IncidentVictoria Bridge Incident

Work Site Setup

Victoria Bridge IncidentVictoria Bridge Incident

Height of Fall

Ice Covered Mira River

Materials on Ice

Victoria Bridge IncidentVictoria Bridge Incident

Weather Conditions

Additional Tirfor and Clamp

Ejected Clamp

Victoria Bridge IncidentVictoria Bridge Incident

Tirfor Winch with Cable

Man Riding Bloc Stop

Swaged Wire Rope

Damaged Safety Latch on Eye Hook

Victoria Bridge IncidentVictoria Bridge Incident

Debris on Ice

Top Chord Anchor

Strap Anchor

Victoria Bridge IncidentVictoria Bridge Incident

Bays of Through Truss Bridge

Cross members Ladder was Supported on

Victoria Bridge IncidentVictoria Bridge Incident

Engineered Anchor

January 27, 1997

Victoria Bridge IncidentVictoria Bridge Incident

Top Chord Anchor Samples

Destroyed after Incident

Victoria Bridge IncidentVictoria Bridge Incident

Clamp Type used on Seal Island Bridge in past

Victoria Bridge IncidentVictoria Bridge Incident

Clamp hooked on flange of bridge Top Chord

Victoria Bridge IncidentVictoria Bridge Incident

Victoria Bridge IncidentVictoria Bridge Incident

Clamp modified to provide step off from bridge

Sent out an Alert across province Out-of-Service across province: All

types of equipment involved in incident until root causes determined

Orders to secure equipment directly involved

Orders for various records

Victoria Bridge IncidentVictoria Bridge Incident

Orders given on:

Anchor points Fall Arrest Equipment Assessment of Suspended Scaffolding

Systems Inspection of Suspended Scaffolding

Systems across the Province

Victoria Bridge IncidentVictoria Bridge Incident

All Suspended Scaffolding work done by TPW forces stopped across the province

All Suspended Scaffolding components were reviewed across the province

Various equipment was removed from duty and destroyed

Other equipment was sent to approved technicians for inspection and re-certification

Victoria Bridge IncidentVictoria Bridge Incident

Started to investigate in conjunction with DEL

Constructed Mock-up of bridge section

Experts were brought in for mock-up investigation

TPW instructed to do mock-up without DEL

Victoria Bridge IncidentVictoria Bridge Incident

DEL Officer

Equipment Lock-up

Investigation on-going

Victoria Bridge IncidentVictoria Bridge Incident

Charges Laid against both TPW and Supervisor

TPW - 7 charges, April 04, 2005

Supervisor - 2 charges, April 04, 2005

Victoria Bridge IncidentVictoria Bridge Incident

Various court proceedings starting April 22, 2005

Guilty plea entered by Supervisor on April 06, 2006 to one charge, no evidence given on other charge

Guilty plea entered by TPW on October 10, 2006 to one charge, no evidence given on other 6 charges

Victoria Bridge IncidentVictoria Bridge Incident

Supervisor - Plead guilty to allowing the use of the modified clamp without certification by a professional engineer

TPW - Plead guilty of not ensuring the modified clamp was certified by a professional engineer

Victoria Bridge IncidentVictoria Bridge Incident

Supervisor sentence - April 06, 2006

- $1,000.00 Fine- $100.00 Costs- $150.00 Victims Surcharge- Training Program attendance

Victoria Bridge IncidentVictoria Bridge Incident

TPW’s sentence - October 10, 2006

- $5,000.00 Fine

- $15,000.00 Public Education Trust Fund

- Presentation at 2007 NSSC Conference

Victoria Bridge IncidentVictoria Bridge Incident

Setup first Suspended Scaffolding Committee - March 23, 2004

Worked with engineering firm to design new equipment

Top Chord Anchor Clamp just one piece designed

Victoria Bridge IncidentVictoria Bridge Incident

Prototype of new Top Chord Anchor

Victoria Bridge IncidentVictoria Bridge Incident

Exploded View of Top Chord Anchor prototype

Victoria Bridge IncidentVictoria Bridge Incident

Load Testing the prototype Top Chord Anchor

Victoria Bridge IncidentVictoria Bridge Incident

Set up Scaffolding Training Committee - March 03, 2005

Did up Request for Proposal [RFP]

Reviewed proposals

Awarded to New Heights Enterprises

Victoria Bridge IncidentVictoria Bridge Incident

Training started in Sydney on July 05, 2005

40 hours of training - classroom & hands-on

Sessions: Eastern - 4 Northern -1 Central - 1 Western - 3

Training completed September 30, 2005

Victoria Bridge IncidentVictoria Bridge Incident

New Clamp Prototype

On-Site Practical Training

Victoria Bridge IncidentVictoria Bridge Incident

Supervisors took the same training as crew

Hands-on experience

Victoria Bridge IncidentVictoria Bridge Incident

Simulated on-site conditions

Victoria Bridge IncidentVictoria Bridge Incident

Installation of Top Chord Anchors as part of training

Use of ladders as part of training

Victoria Bridge IncidentVictoria Bridge Incident

All trainees were hoisted in their harnesses

Allowed for practical experience in controlled conditions

Victoria Bridge IncidentVictoria Bridge Incident

Practical training in Rescue Operations

Victoria Bridge IncidentVictoria Bridge Incident

All trainees went through being rescued

Victoria Bridge IncidentVictoria Bridge Incident

Training done in 2005 identified additional issues

Third committee formed - January 06, 2006

Meetings held and report forwarded on October 10, 2006

Victoria Bridge IncidentVictoria Bridge Incident

Additional changes since the Incident: Created new Bridge Maintenance Engineer to

provide technical coordination of the District Bridge Engineers

Changed reporting structure for District Bridge Engineers who now report to the District Director

Clarified District and Head Office roles, responsibilities and accountabilities for bridge maintenance training, supervision, equipment and techniques

Victoria Bridge IncidentVictoria Bridge Incident

Next Steps:

Bridge Engineers and Supervisors to develop SWP’s and JP’s as needed

Review, do trials, approve new equipment and procedures

Victoria Bridge IncidentVictoria Bridge Incident

Victoria Bridge IncidentVictoria Bridge Incident

Questions ?

Thank You !&

Be Safe !

Victoria Bridge IncidentVictoria Bridge Incident

top related