niali panchayat samiti, cuttack welcomes you all bdo,conference 12/11/2010

Post on 18-Dec-2015

229 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

NIALI PANCHAYAT NIALI PANCHAYAT SAMITI, CUTTACKSAMITI, CUTTACK

WELCOMES YOU ALL WELCOMES YOU ALL BDO,CONFERENCEBDO,CONFERENCE

12/11/201012/11/2010

NIALI (2001 CENSUS)NIALI (2001 CENSUS)

TOTAL NO OF G.P.s :- 23TOTAL NO OF G.P.s :- 23 TOTAL NO OF VILLAGES :- 124TOTAL NO OF VILLAGES :- 124 TOTAL POPULATION :- 132280TOTAL POPULATION :- 132280 S.C. POPULATION :- 26867S.C. POPULATION :- 26867 S.T. POPULATION:-S.T. POPULATION:- 389 389

M A PM A P

INCLUDED IN 3INCLUDED IN 3RDRD PHASE DISTRICT PHASE DISTRICT

WITH EFFECT FROM 01/04/2008WITH EFFECT FROM 01/04/2008

TOTAL NO. OF HOUSEHOLDS – 34289TOTAL NO. OF HOUSEHOLDS – 34289

TOTAL NO. OF JOB CARDS ISSUED- 19244TOTAL NO. OF JOB CARDS ISSUED- 19244

ACHIVEMENTS (M.G.N.R.E.G.S.)ACHIVEMENTS (M.G.N.R.E.G.S.)FINANCIALFINANCIAL

294.771

498.72423

0

50

100

150

200

250

300

350

400

450

500

2009-10 2010-11

2009-10

2010-11

PERSONDAYS GENERATEDPERSONDAYS GENERATED

2009-10 & 2010-112009-10 & 2010-11 2009-102009-10

Total Expenditure – 294.77 lakhsTotal Expenditure – 294.77 lakhs

Total Mandays created – 164884Total Mandays created – 164884

Women labourer engaged – Women labourer engaged – 4982449824

Physically Handicapped engaged Physically Handicapped engaged -01-01

100 days employment given - 100 days employment given - 162162

2010-112010-11

Total Expenditure – 498.72423 lakhsTotal Expenditure – 498.72423 lakhs

Total Mandays created – 392723Total Mandays created – 392723

Women labourer engaged – 177805Women labourer engaged – 177805

Physically Handicapped engaged -06Physically Handicapped engaged -06

100 days employment given - 436100 days employment given - 436

PHOTOS OF MGNREGS WORKPHOTOS OF MGNREGS WORK

Total Est. Cost – 6.90 Lakhs Total Est. Cost – 6.80LakhsTotal Exp. Incurred – 1.53Lakhs Total Exp. Incurred–0.60Lakhs

Renovation of Panchayat Tank ,Alatalanga,Raniola G.P

Renovation of Alatua Tank Lakhanpur,Baharana G.P

Renovation of tank under Renovation of tank under MGNREGSMGNREGS

Renovation of Barisan Kula Matha tank with Bathing Step Renovation of Barisan Kula Matha tank with Bathing Step Est. Cost- 2.52 LakhsEst. Cost- 2.52 Lakhs Expenditure- 1.62 LakhsExpenditure- 1.62 Lakhs

Rural Connectivity work under MGNREGSRural Connectivity work under MGNREGS

Work In Progress Work After Completion Work In Progress Work After Completion

Total Est. Cost – 7.42 Lakhs Length- 0.54 K.M

Expenditure- 7.42 Lakhs

Weeds Clearance of Tank under Weeds Clearance of Tank under MGNREGSMGNREGS

Work In Progress Work after CompletionWork In Progress Work after Completion

Weed Clerance of Sadansa G.P TankWeed Clerance of Sadansa G.P Tank Est. Cost-0.32Est. Cost-0.32 Expenditure- 0.3167Expenditure- 0.3167

Flood Restoration work at Sithalo Bhoi Flood Restoration work at Sithalo Bhoi Sahi in Niali BlockSahi in Niali Block

Breach Site & House Houses constructed by Breach Site & House Houses constructed by damaged damaged

Satyasai Seva Trust Satyasai Seva Trust

Facilities Provided at the work place under Facilities Provided at the work place under MGNREGSMGNREGS

Camp ShedCamp Shed & drinking Supply First Aid& drinking Supply First Aid Arrangements Arrangements

Project Initiation Meeting under Project Initiation Meeting under MGNREGSMGNREGS

Awareness by Beating Drum Meeting in ProgressAwareness by Beating Drum Meeting in Progress

Flood Restoration work in Niali Flood Restoration work in Niali BlockBlock

Breach on road to Const. of Bridge & Approach Breach on road to Const. of Bridge & Approach Kulabarisan Village to Kulabarisan villageKulabarisan Village to Kulabarisan village

Est.Cost- 5.00 Lakhs Expend. – 5.0 LakhsEst.Cost- 5.00 Lakhs Expend. – 5.0 Lakhs

Flood Restoration Work in Niali BlockFlood Restoration Work in Niali Block

Const. of Box Culvert( 12ft x 10 ft) and approach Const. of Box Culvert( 12ft x 10 ft) and approach on Kabichandrapur Kasarda roadon Kabichandrapur Kasarda road

Est. Cost- 6.50 LakhsEst. Cost- 6.50 Lakhs

Rural Connectivity work under MGNREGSRural Connectivity work under MGNREGS ((Inspection by President Zillaparishad,Cuttack)Inspection by President Zillaparishad,Cuttack)

Const. of road from Apuja to Bhatia , Kantapada SchoolConst. of road from Apuja to Bhatia , Kantapada School Est.Cost- 2.38 ,Expenditure – 2.12 Lakhs ,Length-0.35 K.MEst.Cost- 2.38 ,Expenditure – 2.12 Lakhs ,Length-0.35 K.M

Const. of Kitchen Room at Banamalipur Const. of Kitchen Room at Banamalipur Pry School under Welfare SchemePry School under Welfare SchemeEst. Cost- 0.60 LakhsEst. Cost- 0.60 Lakhs

Rural Connectivity work under Rural Connectivity work under MGNREGS (Work in Progress)MGNREGS (Work in Progress)

Const. of Nadi Gada summer road ,Patrakana of Kasarda G.PConst. of Nadi Gada summer road ,Patrakana of Kasarda G.P Est. Cost- 4.8 Lakhs Est. Cost- 4.8 Lakhs Expend.- 0.85 LakhsExpend.- 0.85 Lakhs

SGSYSGSY Financial Target-82.28Financial Target-82.28 Physical Target-367Physical Target-367 Achievement-Achievement- Physical- 300 Physical- 300 Financial-Financial- Best Item- DairyBest Item- Dairy Marketing- Milk through milk Marketing- Milk through milk

producer cooperative society producer cooperative society SGSY training & Photos SGSY training & Photos PhotosPhotos

SGSY RURAL HATA AT SGSY RURAL HATA AT KALIAGHAI,ANLO GPKALIAGHAI,ANLO GP

Rural Hata at Kaliaghai ( Market Shed) SGSY InfrastructureRural Hata at Kaliaghai ( Market Shed) SGSY Infrastructure Est. Cost- 10 Lakhs Work Start Date- 26/02/2010Est. Cost- 10 Lakhs Work Start Date- 26/02/2010 Expenditure- 10 Lakhs Compl. Date- 25/09/2010Expenditure- 10 Lakhs Compl. Date- 25/09/2010

RURAL HATA KALIAGHAI,ANLO GPRURAL HATA KALIAGHAI,ANLO GP

Rural Hata at Kaliaghai ( Market Shed) SGSY Infrastructure Rural Hata at Kaliaghai ( Market Shed) SGSY Infrastructure Est. Cost- 10 Lakhs Expend – 10 LakhsEst. Cost- 10 Lakhs Expend – 10 Lakhs Work Start Date- 26/02/2010 , Compl. Date- 25/09/2010Work Start Date- 26/02/2010 , Compl. Date- 25/09/2010

SGSY RURAL HATA AT SGSY RURAL HATA AT KALIAGHAI,ANLO GPKALIAGHAI,ANLO GP

Rural Hata at Kaliaghai ( Open Platform) InfrastructureRural Hata at Kaliaghai ( Open Platform) Infrastructure Est.Cost- 5 Lakhs ,Expenditure – 5 Lakhs Est.Cost- 5 Lakhs ,Expenditure – 5 Lakhs Work Start Date- 26/02/2010 , Compl. Date- 25/09/2010Work Start Date- 26/02/2010 , Compl. Date- 25/09/2010

Sheep Rearing DairySheep Rearing Dairy

DairyDairy

Dairy of Namita Bhoi Dairy of Pana DeiDairy of Namita Bhoi Dairy of Pana Dei

DairyDairy

GROUP DAIRY UNDER SGSYGROUP DAIRY UNDER SGSY

Indira Awas YojanaIndira Awas Yojana

Target for 10-11 - 651Target for 10-11 - 651 Sanctioned - 603Sanctioned - 603 Achievement - 567Achievement - 567 Funds Available- 434.09 LakhsFunds Available- 434.09 Lakhs Expend.- - 100.20 Lakhs Expend.- - 100.20 Lakhs Photos-Photos-

IAY house of Jemamani DeiIAY house of Jemamani Dei

E-GOVERNANCE PRIASOFT (BLOCK ) & GP STARTED FOR 2010-11 RURALSOFT DATA UPDATED TILL DATE. MGNREGS 2010-11 ONLINE ENTERED OF

RS.498.72423 CRORE. PAMIS BASED ONLINE ACCOUNTING FOR ALL THE

CASH BOOKS OF THE OFFICE SALARY BILL OF BOTH STAFF AND TEACHERS ARE

GENERATED FROM BETAN S/W I.A.Y ONLINE ENTRIES HAVE BEEN MADE FOR 797

BENIFICIARIES DATA ENTRY IN PAMIS 2010 HAVE BEEN

CONTINUING OF ALL GP AND PS

THANKING THANKING YOUYOU

top related