national agro foundation in india

Post on 19-Oct-2014

169 Views

Category:

Health & Medicine

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

presented in Asia Water Week 2013, Manila 11-13 March 2013

TRANSCRIPT

NATIONAL AGRO FOUNDATION INDIA

WATERSHED DEVELOPMENT PROJECT

Watershed Projects

•• Four watershedsFour watersheds•• 5400 hectares5400 hectares•• 5400 hectares5400 hectares•• 20 Villages20 Villages•• 3000 Families3000 Families•• 2100 Land less families2100 Land less families•• Rs.462 Lakh Project costRs.462 Lakh Project cost

2

Awareness Creation, Training, PRA and Institutional Set up

3

Natural Re‐source Development

4

Setting up of Oxygen Factory (Carbon Credit)

5

Worth of Water = ∞

6

Need based training and demonstration

7

Livelihood support – A regular income to rural folk

8

Results conceived …

•• Water table increase in open well up to 2.5 Water table increase in open well up to 2.5 metersmeters

•• 30,000 Plants of Agro forestry and 30,000 Plants of Agro forestry and horticulture Plantedhorticulture Planted

•• 28500 lakh liters of water harvested in 1000 28500 lakh liters of water harvested in 1000 hectare in one yearhectare in one yearC i i t it d bl dC i i t it d bl d•• Cropping intensity doubledCropping intensity doubled

•• Enhanced productivity by 30Enhanced productivity by 30‐‐50%50%

9

A NAF‐NABARD PROJECT

10

top related