my internship at saudi aramco company416264756c6c616820… · my internship at saudi aramco company...

Post on 01-Aug-2018

334 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

My Internship at Saudi Aramco Company

Department of Mechanical Engineering

Period

[16/06/2012 - 10/08/2012]

Submitted by:

Abdullah Yousef Al Rajeh

200700734

Dr. Omar Ouda

Outline

• Introduction

• About Saudi Aramco

• Activities and responsibilities

• The Heat Exchanger

• The Centrifugal Pump

• Steam turbine

• Conclusion

Introduction

• I am an employee in the company with 10 years of experience.

• My internship involves a rotation assignment that starts with work for the maintenance group in Abqaiq plant, then, for the Test and Inspection unit, after that, to work in maintenance shop in AL Qurryah.

• I gain in each place a unique experience and skills.

About Saudi Aramco

• Aramco (Arabian American Oil Company) began in 1930

• After 5 years of exploration, oil was discovered in Dhahran area “Dammam Well # 7”

• A world leader in exploration, production, refining, distribution, shipping and marketing

• the world’s largest proven crude oil reserves of 260.1 billion barrels

• the world’s fourth-largest gas reserves, with 279 trillion cubic feet.

Activities and responsibilities

Week Work PerformedSupervisor's Signature and

Comment

1 Safety Orientation Done

2

Take heat exchanger out and

send it to service company to

check it

In progress

SAFETY ORIENTATION

• All personnel, new hires, contractors and visitors must read the following safety information and understand their responsibility to demonstrate safe working habits in all job assignments.

• EMERGENCY PROCEDURES: (Exits and escape plans, Fire extinguishers …)

• PHYSICAL DEMANDS: (Lifting, carrying, and bending, Protection from falls, Sitting or standing for long periods …)

• ELECTRICAL SAFETY

• OFFICE HAZARDS

The Heat Exchanger

Week Work PerformedSupervisor's Signature and

Comment

3

Received heat exchanger and

test it then return it to its tube

channel

Done

4Take impeller out of the

Centrifugal pump case and sealIn progress

The Centrifugal Pump

Week Work PerformedSupervisor's Signature

and Comment

5

Change the seal and make

new pen then return it to its

case

Done

6

take turbine out of the case

then send it to maintenance

shop

In progress

7Change the blades and test

itIn progress

8 Return the turbine to its

case

Done

Steam turbine

Conclusion

• New knowledge or skill as a result of this

internship:

– Improve my communicating skills.

– Implement the theoretical part into practical.

– Have a better knowledge regarding Aramco

standers.

• The period needs to be extended. But overall

it is very successful and helpful for the

graduate students.

Questions

top related