michele levasseur presentation 2015
Post on 16-Aug-2015
83 Views
Preview:
TRANSCRIPT
Michele Levasseur © 2015
I find money in the value streamby
Eliminating Waste
Michele Levasseur © 20152
Michele Levasseur © 2015 3
• This is why I can deliver solutions • Through the path I have traveled in my career.• Turn to the next slide to see where I have
traveled along the way
Michele Levasseur © 2015
Michele Levasseur © 2015
How we did it……..• Started with specific goal.The goal of this project will be to increase the number of on time shipments, maximize output of labor force, increase the ability to adapt to varying levels of demand, level output based forecast with predicted yield loss, increase throughput to match customers requirement
Supply Chain voice of client and voice of the customer
• Reviewed customers orders to find out why jumps in market only at certain times of year
• Our company could not match peaked demands
• Addressed issues with our client found out that it was their internal promotions causing distribution points to lower volume to almost nothing resulting in loss in service to end customer.
Michele Levasseur © 2015
Michele Levasseur © 2015
Supply Chain result from investigation
• Our client chose to level volumes at distribution points based on history of year 2012
• Leveling assured the right amount of product at the distribution points
• The customer was never out of parts.• Our client had happy customer’s and we were
able to respond to client demand.
Michele Levasseur © 2015
Process Time-m 0.75 Process Time-m 0.63 Process Time-m 0.21 Process Time-m 0.75 Process Time-m 0.32 Process Time-m 0.61 Process Time-m 1.71%Downtime 0.0% %Downtime 0.0% %Downtime 0.0% %Downtime 0.0% %Downtime 0.0% %Downtime 0.0% %Downtime 12.0%Setup Time-m 0 Setup Time-m 0 Setup Time-m 0 Setup Time-m 0 Setup Time-m 0 Setup Time-m 0 Setup Time-m 0#Setups/Shift 0 #Setups/Shift 0 #Setups/Shift 0 #Setups/Shift 0 #Setups/Shift 0 #Setups/Shift 0 #Setups/Shift 0# Shifts 1 # Shifts 1 # Shifts 2 # Shifts 2 # Shifts 2 # Shifts 2 # Shifts 2% Yield 100.00% % Yield 100.00% % Yield 100.00% % Yield 100.00% % Yield 100.00% % Yield 100.00% % Yield 97.00%Batch size 40 Batch size 40 Batch size 40 Batch size 40 Batch size 40 Batch size 40 Batch size 40
In warehouse People Reqd 1 People Reqd 1 People Reqd 1 People Reqd 1 People Reqd 1 People Reqd 1 People Reqd 11920 People Trained 6 People Trained 6 People Trained 6 People Trained 5 People Trained 2 People Trained 2 People Trained 5
Represents a change
PercentInventoryDays InvEffective Proc Time-mWork time/shift-mTotal Work timeEffective YieldTakt-mAdj Takt for Yield, Uptime, Setups-mProc Time % Adj TaktCurrent ResourcesResources req'd/dayTime req'd/day-m
No constraint
Potential constaint
MoldSand Paint Humidifier Preheat Mixing
100% 100% 100% 100% 100%
De-gassing
100% 100%0 40 40
0.00 0.127.20 0.00 0.12 0.12 0.00402420
0.6 0.2 0.8 0.3 0.6 1.70.8460.0 460.0460.0 460.0 460.0 460.0 460.0
460.0 920.0 920.0 920.0100% 97%920.0
100% 100% 100% 100% 100%920.0460.0
1.15 2.30 2.30 2.30
2.30 1.96
2.30
1.15 1.15 2.30 2.30 2.30
2.301.15
54.78% 9.32% 32.61% 13.91%1 1
26.67%1 1 1 1
87.01%65.22%
0.55 0.09 0.33 0.14245.33 800.53
0.27300.00 252.00 85.71 300.00 128.00
0.870.65
Flow from Sand to Paint
Improve ventilation at Sanding to allow
Painting at machneON MONDAY
start one operator 1/2 hr earliet to load
preheater
Investigate oven cure time and if needed
Sand and paint on
same machine
Root cause of molding
defects
Value Stream Map gives a monetary value to each step in the process