list infrastructure construction projects
Post on 08-May-2022
10 Views
Preview:
TRANSCRIPT
20 LOS ANGELES BUSINESS JOURNAL NOVEMBER 15, 2021
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated
completion date
Planners• owner
• architect
General Contractor• name
• phone
1LAX People MoverBetween LAX and new off-site parking, car rentaland transit facilitiesLos Angeles 90045
$2,300.0 2.25-mile elevated guide way with sixstations connecting the terminals to aMetro rail station and consolidated rentalcar facility
March 20192023
Los Angeles World AirportsHDR Inc.
LINXS JV (Balfour Beatty, Fluor, ACSInfrastructure Development,Bombardier Transportation, DragadosUSA, Flatiron and Hochtief PPPSolutions)(949) 420-5000
2LAX - Delta Sky Way Project1 World WayLos Angeles 90045
1,900.0 upgrade and connect Terminals 2, 3, andthe Tom Bradley International Terminal
Sept. 1, 2018Sept. 30, 2023
Delta Air Lines Inc.Gensler/Arup
Hensel Phelps Construction Co.(949) 852-0111
3LAX - American Airlines Remodeling Project1 World WayLos Angeles 90045
1,600.0 renovation of all of Terminal 4 and part ofTerminal 5
Oct. 1, 20182023
American Airlines Inc.Gensler/Pierce GoodwinAlexander & Linville Inc.
Hensel Phelps Construction Co.(949) 852-0111
4Purple Line Extension Section 15055 S. Wilshire Blvd., Suite 700Los Angeles 90036
1,582.0 3.9-mile subway extension to Beverly Hills,from three new stations at Wilshire/LaBrea, Wilshire/Fairfax and Wilshire/LaCienega
January 2015June 2023
Los Angeles County MetropolitanTransportation AuthorityParson Transportation Group Inc.
Skanska/Traylor/Shea JV(323) 852-4220
5Purple Line Extension Section 2Wilshire/Rodeo to Century City/ConstellationLos Angeles
1,390.0 2.6 miles of additional tracks to Metro’srail system and two new stations atWilshire/Rodeo and Century City/Constellation
April 2017August 2025
Los Angeles County MetropolitanTransportation AuthoritySTV Inc.
Tutor Perini Corp./O&G Industries Inc.JV(818) 362-8391/(860) 489-9261
6Purple Line Extension Section 3 - StationsWestwood/UCLA and Westwood VA HospitalLos Angeles
1,320.0 construction of two new subway stationsat Westwood/UCLA and Westwood/VeteranAdministration (VA) Hospital
July 2019December2026
Los Angeles County MetropolitanTransportation AuthoritySTV Inc.
Tutor Perini Corp./O&G Industries Inc.JV(818) 362-8391/(860) 489-9261
7Crenshaw/LAX Transit CorridorCrenshaw Boulevard, Aviation Boulevard, FlorenceAvenueLos Angeles and Inglewood 90045
1,282.8 8.5-mile light rail line extending to LAXGreen Line from Exposition Boulevard witheight stations
January 20142022
Los Angeles County MetropolitanTransportation AuthorityHNTB Corp.
Walsh/Shea Corridor Constructors JV(213) 922-4609
8Regional Connector444 S. Flower St.Los Angeles 90071
1,205.4 1.9-mile underground light-rail systemconnecting the Gold Line to the 7th Street/Metro Station
July 2014January 2022
Los Angeles County MetropolitanTransportation AuthorityHatch Mott MacDonald
Skanska/Traylor JV(951) 684-5360
9LAX - Consolidated Rent-A-Car Facility5440 W. 98th St.Los Angeles 90045
1,100.6 consolidate operations of more than adozen rental car companies
August 2019June 2023
Los Angeles World AirportsPGAL/AC Martin Partners Inc.
PCL Construction Services Inc.(818) 246-3481
10Airport Metro Connector96th Street and Aviation Boulevard connect theCrenshaw-LAX light rail line to LAX terminalsLos Angeles 90045
898.6 connect the Metro system to the LosAngeles International Airport
June 21, 20212024
Los Angeles County MetropolitanTransportation AuthorityNA
Tutor Perini Corp.(818) 362-8391
11Foothill Gold Line ExtensionGlendora to MontclairGlendora
805.61 12.3-mile extension to the Metro Gold Linesystem for new light rail stations inGlendora, San Dimas, La Verne, Pomona,Claremont and Montclair
December20172027
Los Angeles County MetropolitanTransportation AuthorityNA
Kiewit/Parsons JV(626) 513-5788
12Division 20 Portal Widening & Turnback FacilityProjectArts DistrictLos Angeles 90012
440.0 civil improvements, including demolitionand/or modification of the existing tunnelportal, installation of new trackwork, athird rail, traction power and train controlsystems
April 2020July 2024
Los Angeles CountyMetropolitanTransportationAuthorityNA
Tutor Perini Corp.(818) 362-8391
13Purple Line Extension Section 3 - TunnelsCentury City to VA Hospital in WestwoodLos Angeles
430.0 construction of twin bored tunnels forfuture Purple Line subway servicespanning approximately 2.6 miles betweenCentury City and the VA Hospital inWestwood
January 20192023
Los Angeles County MetropolitanTransportation AuthoritySTV Inc.
Frontier-Kemper ConstructorsInc./Tutor Perini JV(818) 362-2062/(818) 362-8391
14Sixth Street Viaduct ReplacementDowntownLos Angeles 90013
360.0 replace existing viaduct between MateoStreet and SR-101
August 2013August 2022
City of Los AngelesHNTB/Michael MaltzanArchitecture
Skanska/Stacy and Witbeck Inc. JV(213) 485-5085/(510) 748-1870
15I-5 High Occupancy Vehicle LaneMagnolia Boulevard to Buena Vista St.Burbank
355.0 construction of high occupancy vehiclelane in each direction
August 2014Late 2021
California Department ofTransportationNA
Security Paving Co. Inc.(818) 362-9200
16LAX - Terminal Connections to People MoverBetween LAX and new off site parking, car rentaland transit facilitiesLos Angeles
337.0 expanding the facades of three terminalsand building new adjacent structures toease access of People Mover project
Early 20192021
Los Angeles World AirportsNA
Austin Commercial(310) 421-0269
1 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners and generalcontractors. Projects must be under construction as of September 2021. To the best of our knowledge, this informationis accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the list, omissions
and typographical errors sometimes occur. Please send corrections or additions on company letterhead to the ResearchDepartment, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025. ©2021 LosAngeles Business Journal. This list may not be reprinted in whole or in part without prior written permission from theeditor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Ranked by construction cost
INFRASTRUCTURE CONSTRUCTION PROJECTS NEXT WEEKNonprofit Organizations, Talent Agencies, Motion Picture Distribution Companies
THE LIST
020-21_INFRA List.indd 20020-21_INFRA List.indd 20 11/11/21 2:21 PM11/11/21 2:21 PM
NOVEMBER 15, 2021 LOS ANGELES BUSINESS JOURNAL 21
INFRASTRUCTURE CONSTRUCTION PROJECTS
Is your business internet slow?Is your business internet constantly down?
Is your business growing?
YOUR BUSINESS WILL GAIN FLEXIBILITY AND SCALABILITY WITH FIBER-OPTIC CONNECTIVITY
carriers@sce.com 800 634 7999edisoncarriersolutions.com
WE HAVE THE RIGHT SOLUTIONFOR YOUR BUSINESS
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated
completion date
Planners• owner
• architect
General Contractor• name
• phone
17Los Angeles World Airports Roadway, Utilities &EnablingLos AngelesLos Angeles 90045
$334.9 restoring and constructing roadways andutilities infrastructure that will enableongoing and future work within LAWA’sLandside Access Modernization Program;LAWA’s LAMP is focusing on high-priorityprojects necessary to support theAutomated People Mover, ConsolidatedRent-A-Car facility and IntermodalTransportation Facility-West
December2020December2025
City of LA, Los Angeles WorldAirportsNA
Skanska(951) 684-5360
18Headworks WestI-5 to Griffith ParkBurbank
230.0 110-million gallon reservoir March 20162021
LADWPLADWP
NA
19Foothill Trunk LineFoothill BoulevardSunland/Tujunga
142.0 3-mile steel pipe sewer replacement alongFoothill Boulevard from Hubbard Street toTerra Bella Street
January 20162023
LADWPLADWP
NA
20Route 210 from Interstate 5 to Wheatland On-RampSylmarSylmar 91352
135.5 concrete pavement replacement, bridgebarrier and approach slab replacement,and various drainage system upgrades
July 2020July 2023
CaltransCaltrans
Flatiron(303) 485-4050
21River Supply Conduit Improvement Upper Reach– Unit 7 ProjectNANorth Hollywood 91505
130.0 replacing nearly 2.5 miles of welded steelpipe needed to supply drinking water toLos Angeles Department of Water andPower's service areas
October 20182022
City of Los Angeles / LADWPNA
Frontier-Kemper Constructors Inc.(818) 362-2062
22Silver Lake Phase 36001 Forest Lawn DriveLos Angeles 90068
75.0 Phase III will provide water delivery to L.A.via reservoirs that were constructed inPhase I & Phase II; Phase III's regulatingstation will control the water via a flowcontrol station and associated valve andmetering vaults
July 1, 2021Oct. 31, 2023
Los Angeles Department of Waterand PowerLos Angeles Department of Waterand Power
Webcor, Obayashi, WM Lyles a JointVentureNA
NA - Not Available JV - Joint VentureNote: Information provided by representatives of the owners and general contractors. Projects must be underconstruction as of September 2021.To the best of our knowledge, this information is accurate as of press time. While every effort is made to ensure the
accuracy and thoroughness of the list, omissions and typographical errors sometimes occur. Please send corrections oradditions on company letterhead to the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd.,Suite 350, Los Angeles 90025. ©2021 Los Angeles Business Journal. This list may not be reprinted in whole or in partwithout prior written permission from the editor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
020-21_INFRA List.indd 21020-21_INFRA List.indd 21 11/11/21 2:21 PM11/11/21 2:21 PM
top related