lg-003 ffa log section 5 (fs)

Post on 08-Dec-2015

214 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

Fire fighting checklist

TRANSCRIPT

FIRE PUMP TEST RECORD (1)

FIRE PUMP TEST RECORD (1)

DATEOPERATION RESULT

REMARKS (HOSE TEST & OTHER)FIRE & G.S. PUMP EMER. FIRE PUMP

OFFICER IN CHARGE: ____________________________ CAPTAIN: _____________________

HYDRANT HOSE INSPECTION RECORD (2)

FIRE / FOAM HYDRANT & HOSE INSPECTION & MAINTENANCE RECORD

DATE INSPECTION AND MAINTENANCE RECORD

OFFICER IN CHARGE: __________________________ CAPTAIN: ______________________

INSPECTION/MAINTENANCE RECORD (MONTHLY/EVERY 2 MONTHS) (3A)

DATEINSPECTION RESULT

REMARKS

8. FIREMAN'S OUTFIT

A-1

B-1

B-2

D-1

D-2

E-1

9. FIRE ALARM SYSTEM

A

B-1

B-2

C-1

C-2

10. OTHER EQUIPMENT

A-1

A-2

A-3

B-1

B-2

B-3

B-4

C-1

OFFICER IN CHARGE: CAPTAIN:

INSPECTION MAINTENANCE FOR EXTINGUISHERS (3B)

INSPECTION & MAINTENANCE RECORD FOR FIRE EXTINGUISHERS

DATE INSPECTION AND MAINTENANCE RECORD

OFFICER IN CHARGE: __________________________ CAPTAIN: ______________________

OTHER MONTHLY TEST / RECORDS (3C)

DATE INSPECTION AND MAINTENANCE RECORD

OFFICER IN CHARGE: __________________________ CAPTAIN: ______________________

OTHER MONTHLY INSPECTION & MAINTENANCE RECORDS (FANS / DAMPERS ETC)

EEBD INSPECTION/MAINTENANCE RECORD (4)

No LOCATION Check C1 Checks C2,C3,C4 Checks C5,C6,C7 REMARK

OFFICER IN-CHARGE MASTER

PORTABLE CO 2 EXTINGUISHER MEASUREMENT RECORD (5)

LOCATION ID No. SERIAL No. GROSS WEIGHT TARE GAS WEIGHT RESULT (%)

DATE: ________________________ OFFICER IN CHARGE: ____________________________

CAPTAIN: ______________________________________

FIXED INFLAMMABLE GAS DETECTOR

INSPECTION/MAINTENANCE RECORD (6)

REMARKS

NAVIGATION BRIDGE

CAPTAIN'S DAY

C/ENGINEER'S DAY ROOM

RADIO ROOM

SHIP'S OFFICE

CARGO CONTROL ROOM

ENGINE CONTROL ROOM

OFFICER'S MESS ROOM

OFFICER'S SMOKING ROOM

CREW'S MESS ROOM

CREW'S SMOKING ROOM

GALLEY

OFFICER'S PANTRY

NIGHT PANTRY

GYMNASIUM

AIR CONDITIONING ROOM

ENGINE WORK SHOP

WORKER'S ROOM

DUCT SPACE

OFFICER IN CHARGE: _____________________________ CAPTAIN: _____________________

DATELOCATION

INSPECTION / TEST MAINTENANCE RECORD (OTHERS) (7)

DATE ITEM No.

OFFICER IN CHARGE: _________________________ CAPTAIN: _________________________

MISCELLANEOUS INSPECTION / TEST RESULTS AND MAINTENANCE RECORDS

THREE MONTHLY INSPECTION / TEST RECORDS (8)

DATE ITEM No.

OFFICER IN CHARGE: _________________________ CAPTAIN: _________________________

THREE MONTHLY INSPECTION / TEST RESULTS AND MAINTENANCE RECORDS

9 FIRE DOORS

MONTHLY

A) INSPECT DOORS FOR ANY ABNORMALITIES.

C) CHECK DOOR CLOSERS ARE PERFORMING SATISFACTORILY

D) CHECK THE SPEED OF THE DOOR CLOSING

E) CHECK FOR DOOR HANDLES ARE IN GOOD CONDITION.

B) ENSURE DOORS ARE CLOSING PROPERLY AND THE SEALING OF THE DOORS ARE INTACT

top related