Paved Bus Laybysand Walkways- RedG - LTA interlockers

Asphalt treatment onRoad surfaces anddesignated 1.5msidewalksPaved Sidewalksalong mainboulevard-220x220Bridge CityFlagstone

0.500m Hedgetreatment

Trees along Torvale Crecent at20m centres

Lawn Area

Bridge City DoubleOutreach Arm lightsalong main boulevard@ 10m centres

Bridge City SingleOutreach Arm lights@ 20m centres

Paved Islands -Corobrik pavers

Embankment

110 x 110 Cobblepavers

Trees in movable planter boxes alongBoulevard at 20 m centres

Informal tree planting

( Note: All trees to be specifiedby landscape architect)

Project Name:

Project Description:

Drawing Title:

Client:

Consultant:

Locality:

Revisions:

U R B A ND E S I G N P L A N

D E S I G N O F T H E S T R E E T S C A P E A N DP U B L I C S P A C E F O R B R I D G E C I T Y L O W E RP L A T F O R M

L O W E R P L A T F O R M S T R E E T S C A P ED E S I G N

Date:

Scale:

Designed:

Checked:

Approved:

Drawing Number:

16/03/2012

1:750 ( Main Drawing)

BC - LP - LAND - 10428 - 02

Cobble Pavers:Around Magistrates Court110mm X 110mm X 50mm :

Double Outreach Arm Light :

LIGHTS :

Special Notes

1. All areas and dimensions are approximate and subject to final survey.

General Notes:

1. These drawings are to be read in conjunction with structural, civilengineering drawings.2. Contractors to verify all levels , heights and dimensions on site and tocheck same against the drawing before any work is put in hand.3. Contractors to locate and identify all existing services on site andprotect these from damage throughout the duration of the works.4. Contractor is responsible for correct setting out of work with particularreference to boundaries, building lines etc.5. Any errors ,discrepancies or omissions to be reported to the architects/urban designers immeadiately and any queries arising to be reported tothe architects/urban designers for clarification before any work is put inhand.6. Contractor to check the details shown on this drawing for compliancewith the standards of good building practise with particular reference tospecial requirements necessistated by local and/or on site conditions andto report this to the architects/urban designers.

Corobrik Pavers :Centre Islands220mm x 110mm x 50mm(Herringbone Pattern):

1:200 ( Sections)

TYPICAL ROAD SECTIONS:

LEGEND:

G-lta interlockers:Bus lay bys and crossings220mm x 110mm x 80mm

PAVING:

Material- Glass fibre reinforced polyconctreteHeight - 900mmTop Widths - 1.2mBottom Widths - 1.1mWeight - 70kgAvailable variations - Any pot height between 100mm and 900mm from the base up / anypot ring between 100mm and 900m from the top edge down. 40mm pot return standard.Finish options - Silk screening, embossingNote: Trees to be specified by landscape architect

Smartstone:Sidewalks220mm X 220mm x 50mm

TREE PLANTERS: Along BoulevardQuantity: 21

IGNP004 -1.2m Square Planterby Igneous Concrete

C

C

B

B

AA

SH

AV

PTN 477 OF 433

PTN 1 OF ERF 6

ERF 2

ERF 1

PTN 2 OF ERF 5

ERF 4

PTN 477 OF 433PTN 537

PTN 541

PTN 468 OF 432

PTN 456 OF 432

PTN 455 (OF 432)

REM OF PTN 432

PTN 452 (OF 432)

PTN 506

PTN 486

PROPOSED PTN 115

3,00m S & D SERV.

2,00m Security and Cable Servitude

PROPOSED 3m SEWER SERV.

Embankment and Services Servitude

PTN 1 OF ERF 5

PTN 130 OF ERF 8

PTN 131 OF ERF 8

PTN 132 OF ERF 8

PTN 133 OF ERF 8

ERF 9

ERF 10

ERF 11

ERF 12

ERF 13

ERF 14

ERF 15

PTN 3 OF ERF 5

PTN 148 OF ERF 8

1,4908 Ha. gross

2,9545 Ha. gross

2646m`

1081m`

1078m`

1390m`

4748m`

4506m`

4619m`

857m`

38

74

26

26

26

23 74

57

57

59

18

17

17

17

17

17

13

2121

211216

106

16

16

1616

16

16

62

62

54

54

53

75

98

57

13

20

40

198

41

11

10

10

1010

11

66

76

8

11

9

9

99

9

3

7

70

20

30

70

47

24

23

23

24

36

9

19

15

74

14

15

15

15

15

13

46

22

41

27

69

4

REM OF ERF 16

REM OF ERF 173749m`

2581m`

15

15

180

41

1

9

10

14

40

50

75

50

79

15

7,50m NO PARKING LINE

10,00m BUILDING LINE

10,00m BUILDING LINE

B R I D G E C I T Y B O U L E V A R D ( 2 4 , 0 0 m )

T O R V A L E C R E S C E N T ( 2 4 , 0 0 m )

BRIDGE CITY BOULEVARD PROPOSED EMBANKMENT SERVITUDE

(IN FAVOUR OF THE MANAGEMENT ASSOCIATION)

PROPOSED EMBANKMENT SERVITUDE

(IN FAVOUR OF THE MANAGEMENT ASSOCIATION)

(ROAD)

2

8

21

11

12

21

7

8

39

4

65

65

65

65

65 65

65

67.5

67.5

50

50

50

50

52.5

52.5

52.5

52.5

47.547.5

47.5

47.5

55

55

55

55

57.5

57.5

57.5

57.5

60

60

60

62.5

62.5

62.5

42.5

42.542.545

45

45

45

45

37.5

40

40

42.5

42.5

42.5

45

1,1314 Ha. net

2,1628 Ha. net

52

43

43,5

43

43

43

44

46

47

48

46

47

48

45

44

44

45

44

44

44

46

46

47

48

49

43,5

44,5

44,5

45,5

46,5

48,5

50

3927 44

41

52

64248 18

31

PTN 504

73m`

1m`

61m`

30ERF 1874m`

79

53

10,00m

BUILDING LINE

7,50m NO PARKING LINE

3,1722 Ha. gross

2,7177 Ha. net

7,50m NO PARKING LINE

10,00m BUILDING LINE

95

6

11

28

16

46

36

217m`

1,2290 Ha. gross

1,0944 Ha. net

7768m` gross

7190m` net

7618m` gross

6854m` net

3689m`

1,1892 Ha. gross

7067m` net

11

97

40

59

70

45

25

91

101

44

10

44

54

33

36

102

40

18

30

28

41

4

14

PTN 149 OF ERF 8

(ROAD)

PTN 3 OFERF 6(ROAD)

PTN 1 OFERF 17

PTN 1 OFERF 16

PTN 147 OF ERF 8

PTN 2 OFERF 6

PROPOSED EMBANKMENT SERVITUDE(IN FAVOUR OF THE MANAGEMENTASSOCIATION)

PROPOSED PTN 48

PROPOSED PTN 47

PROPOSED PTN 46

PROPOSED PTN 49

43m

43m

44m

44m

44m

44m

44m

44m

46m

46m

46m

46m

46m

47m

43m

43m

45m

45m

45m

45m

45m

45m

42m

42m

43m

43m

44m

44m42m

43m

43m

46m

46m

47m47m

45m

45m

46m

47m

45m

46m

46m

47m

44.5m

46m

47m

48m

48m

49m

49m

46m

46m

45m

50m

50m

50m

50m

SECTION C-C

Lawn area5.5m

Sidewalk1.5m

Hedge1.2m

Ker

b0.

5m

Sidewalk1.5m

Hedge1.2m

Ker

b0.

5m

Lawn area5.3m

Lane3.4m

Lane3.4m

Asphalt Asphalt

SECTION A-A

Embankment

Side

wal

k

Ker

b Lane Lane

Ker

b Sidewalk Embankment6.4m 1.2m 0.

5m

0.5m

3.5m 4.0m 2.5m 5.4m

Asphalt

Asphalt

natural ground line

SECTION B-B

Sidewalk2.6m 0.

5H

edge

0.5

Ker

b Lane5.5m

Lane3.5m 0.

3K

erb

0.3

Ker

b

Med

ian

1.4mLane5.5m

Bus Lane3.0m

Sidewalk2.5m0.

5K

erb

Paved Paved

Preffered colour option :Soot

top related