KYUNG IN CONSTRUCTION (L.L.C)

KYUNG IN CONSTRUCTION (L.L.C)

May. 2006

2

INDEXINDEX

A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory

B. Construction 1. Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea

C. Production of Piling Machine 1. Drilling Rigs 2. DTH Hammers 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers

3

A. About UsA. About Us

1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in

Dubai 5. Accomplishment in Middle East 6. Factory

4

1. Greeting1. Greeting

Since establishing KYUNGIN PRECISION in 1989, we’ve supplied various equipments needed at a construction site, manufactured with accumulated techniques through continuous researches and developments at a 4,300m2-sized factory located in Ulsan.

We promise to do always our best for customer’s satisfaction with abundant experiences and professionalism sincerely.

We need your encouragements and supports hereafterand also hope your continuous prosperity.

From Manufacturing To Construction

From Manufacturing To Construction

2. Introduction2. Introduction

NAME KYUNG IN CONSTRUCTION L.L.C

DATE OF ESTABLISHMEN

TFEB. 2006

MANAGING DIRECTOR

CHA, YEONSUK

LOCATION DUBAI

MAIN PRODUCTION

1. PILING MACHINE MANUFACTURING2. BOREHOLE PILING WORKS

6

3. Organization3. Organization

Operators Labors Factory Workers

Office Workers

Total

11 35 7 5 58

Managing Director

Construction

Division

Manufacturing

Division

Piling Team

Sales Factory Administration

7

4. Current Available Equipment in Middle East4. Current Available Equipment in Middle East

No

ItemQ’nt

yMaker( or

Brand)Remark

1 Pile Driver 5 KYUNG IN

3ea * KID600-L302ea * KID1200-L42

2 Crane 2SMITOMO

/KOBELLCO55Ton

3 Generator 5CAT 3306/NTTA-855

4 Compressor 5 SULLAIR

5 Excavator 2 HUYNDAI 1M³

8

5. Accomplishment in Middle East (Dubai)5. Accomplishment in Middle East (Dubai)

Project NameJEBEL ALI POWR AND DESALINATION

PLANT PHASE ‘L’- PHASE II, U.A.E

Scope of Works

Borehole Piling Works, Load Test, Pile Trimming Works

Project Volume

1. Original Order- Dia. * Depth : Ø600 * 15M- No. of Piles : 2,547ea - Total Length : 38,205M2. Additional Order - Dia. * Depth : Ø600 * 14M - No. of Piles : 249ea - Total Length : 3,486M

Remarks - Shortened Construction Period by 90 days

9

5. Accomplishment in Middle East (Bahrain)5. Accomplishment in Middle East (Bahrain)

Project NameAL-MARSA FLOATING CITY: MEENA

TOWER PROJECT

Scope of Works

Borehole Piling Works, Load Test, Pile Trimming Works

Project Volume

A. for Ø600 - Dia. * Depth : Ø600 * 11M- No. of Piles : 402ea - Total Length : 4,422MB. for Ø700- Dia. * Depth : Ø600 * 11M- No. of Piles : 82ea - Total Length : 902M

Remarks

10

6. Factory6. Factory

11

B. Construction SiteB. Construction Site

1. Full Casing Method 1-1. Merits of Full Casing Method 1-2. Procedure of Full Casing Method 1-3. Our Strength in Full Casing

Method2. Pile Cutting3. Load Test 4. Job Site in Dubai & Korea

12

1-1. Merits of Full Casing Method (1)1-1. Merits of Full Casing Method (1)

① Excellent Quality of Pillars: Ensuring Vertically Straightness Even Surface

☞ in comparison with Bentonite Method

13

1-1. Merits of Full Casing Method (2)1-1. Merits of Full Casing Method (2)

② Quick Performance: High Productivity & Cost

Saving

14

③ Environmentally Friendly: Keeping Job-Site Clean owing to No Waste Low level of Noise Pollution

1-1. Merits of Full Casing Method (3)1-1. Merits of Full Casing Method (3)

15

1-2. Procedure of Full Casing Method (1)1-2. Procedure of Full Casing Method (1)

①Preparation

② Drilling ③Completion of Drilling

16

1-2. Procedure of Full Casing Method (2)1-2. Procedure of Full Casing Method (2)

④ Re-bar Cage

Installment

⑤ Concrete Placement

⑥ Casing Removal

17

1-3. Our Strength in Full Casing Method1-3. Our Strength in Full Casing Method

1. We achieved a great success in Full Casing Method in Middle East for the first time.

2. Due to our Success in Full Casing Method in Jebel Ali Plant, Dubai City hall has picked up Full Casing Method as a Recommendable Boring Method for the piling construction in Dubai.

3. International Patent applied for ‘Boring Method for Sand Layer and Auger Machine’ for the first time in the World.

* Tile of Invention : “AUGER BORING MACHINE HAVING VIBRATOR AND BORING METHOD USING THE SAME”

* Applied Number : PCT/KR2006/001391

18

2. Procedure of Pile Cutting (1)2. Procedure of Pile Cutting (1)① Excavation for Pile Cutting

② Pile Cutter Setting

③ Placing Pile into Pile Cutter

19

2. Procedure of Pile Cutting (2)2. Procedure of Pile Cutting (2)④ Cutting Pile and Moving Debris ⑤ Clean Pile Head

20

3. Procedure of Load Test (1)3. Procedure of Load Test (1)① Excavation for Load Test

② Pile head Cutting and Leveling

③ Setting of Cylinder Hydraulic Jack

21

3. Procedure of Load Test (2)3. Procedure of Load Test (2)

④ Lying of Test Beam

⑤ Loading Concrete Blocks

⑥Gage Setting

22

4-1. Job Site in Dubai : Jebel Ali Power Plant (1)4-1. Job Site in Dubai : Jebel Ali Power Plant (1) Jebel Ali Power Station & Desalination ‘L’-

Phase Ⅱ

23

4-2. Job Site in Dubai : Jebel Ali Power Plant (2)4-2. Job Site in Dubai : Jebel Ali Power Plant (2) Jebel Ali Power Station & Desalination ‘L’-

Phase Ⅱ

24

4-2. Job Site in Bahrain4-2. Job Site in Bahrain

Bahrain MEENA TOWER PROJECT

25

4-2. Job-Site in Korea : DTH Hammer Rock Piling4-2. Job-Site in Korea : DTH Hammer Rock Piling KTX (Korea Train Express) Construction Site

① ② ③

④ ⑤

☞ Our DTH Hammer Machine is used

for all railroad tracks in Korea

Such as KTX tracks, Kyungbu line

Honam line and so on.

26

4-2. Job-Site in Korea : Rock-Bed Piling 4-2. Job-Site in Korea : Rock-Bed Piling

27

4-2. Job-Site in Korea : Ø1000 Piling 4-2. Job-Site in Korea : Ø1000 Piling

28

4-2. Job-Site in Korea : Soil Piling 4-2. Job-Site in Korea : Soil Piling

29

C. Production of Piling MachineC. Production of Piling Machine

1. Drilling Rigs 2. DTH Hammer 3. Auger & Casing Drivers 4. Accessories : Screws &

Hammers

30

Dia. Ø800 Ø600

10M

15M

20M

25M

30M

35M

40M

45M

1-1. Drilling Rig : KID8001-1. Drilling Rig : KID800

Ø6

00

*29

.5M

Ø8

00

*27

M

Ø6

00

+2

7M

• K-150DP

• KCA-890

Model Hole Dia.

Drilling Depth Leader Length Auger Driver Casing Driver

KID800Ø800 Max. 36M

33M * Ø711 K-150DP KCA-890Ø600 Max. 42M

Note;

1. ① & ② Hole : drilled with One Full Casing at one time.

2. ③ Hole : another casing of 15M is jointed by welding with the first casing.

3. KID800 is compatible for Ø600 & Ø800 hole by using Casing Coupling.

4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E.

+1

5M

27M

42M

Depth

29.5M

① ③②

31

1-2. Drilling Rig : KID12001-2. Drilling Rig : KID1200

Dia. Ø1200 Ø800

10M

15M

20M

25M

30M

35M

40M

45M

Ø8

00

*29

.5M

Ø1

20

0*2

7M

Depth

Ø8

00

+2

7M

• K-240DP

• KCA-1200

Model Hole Dia. Drilling DepthLeader Length

Auger Driver Casing Driver

KID1200-AØ1200 Max. 39M

39M * Ø711 K-240DP KCA-1200Ø800 Max. 42M

+1

5M

27M

42M

29.5M

Note;

1. ① & ② Hole : drilled with One Full Casing at one time.

2. ③ Hole : another casing of 15M is jointed by welding with the first casing.

3. KID1200 is compatible for Ø800 & Ø1200 hole by change Casing Coupling.

4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E.

① ③②

32

* Structure of Drilling Rig* Structure of Drilling Rig

Ø

Ø

Ø

* Note : The specification is subject to be changed for improvement without prior notice.

33

1-5. Pictures of Pile Drivers (1)1-5. Pictures of Pile Drivers (1)

KID1200 KID800

34

1-5. Pictures of Pile Drivers (2)1-5. Pictures of Pile Drivers (2)

KID1200-L36 JSP Machine

35

2. DTH Hammer (1)2. DTH Hammer (1)

from Ø400 to Ø1200

36

2. DTH Hammer (2)2. DTH Hammer (2)

from Ø400 to Ø1200

37

3. Auger & Casing Drivers3. Auger & Casing Drivers

Casing DriversEarth Augers Hydraulic AugerMulti Shaft Augers

Doughnut Auger

38

3-1. Auger Driver K-Series (1)3-1. Auger Driver K-Series (1)

39

3-1. Auger Driver K-Series (2)3-1. Auger Driver K-Series (2)

40

3-2. Casing Driver KCA-Series (1)3-2. Casing Driver KCA-Series (1)

41

3-2. Casing Driver Series (2)3-2. Casing Driver Series (2)

42

4-1. Screw & Bits4-1. Screw & Bits

43

4-2. Hammers Set & Bits4-2. Hammers Set & Bits

44

Contact UsContact Us

• Website : www.kyungin21.com• E-mail : piling@kyung21.com• Tel: • Mobile : +971-50-8033848• Fax : • Address :

top related