WP2 “Design and implementation of infrastructure capturing energy carbon data” State of advancement. Konstantina Papachristopoulou Athens Technology Center S.A. WP2 Current Status. WP is active for 6 months (End is due for October 2013) Active tasks during this period: - PowerPoint PPT Presentation

TRANSCRIPT

1ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

WP2 “Design and implementation of infrastructure capturing energy carbon data”

State of advancement

Konstantina PapachristopoulouAthens Technology Center S.A.

2ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• WP is active for 6 months (End is due for October 2013)

• Active tasks during this period:– T2.1 Infrastructure capturing & storing energy

data (AUEB)– T2.2 Energy consumption of SC processes & PLM

data management (DITF)– T2.3 Energy Consumption Reduction Tool (ENEA)– T2.4 Energy Monitoring Tools Design (ATC)

WP2 Current Status

3ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

Overview of activities (1/2)

3

Task Activity / Leader, ContributorsStatus Comments

T2.1 Determining the data-capturing hardware (market survey) / AUEB

T2.1 Designing the middleware handling data streams / AUEB

T2.1 Designing the data models for real & LCI data / AUEB

T2.1 & T2.2 ToC of Deliverable 2.1 / AUEB, DITF, ENEA

T2.2 Identification of relevant phases of the product life cycle regarding energy consumption /DITF

T2.2 Development of the methodology to manage input/output streams for each SC step on product level /DITF

T2.2 Aggregation methodology of LCI data for a product along the whole SC /DITF

4ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

Overview of activities (2/2)

4

Task Activity / LeaderStatus Comments

T2.2 Definition of reference characteristics for product types /DITF

ongoingThe relation with KPIs

(ENEA) will be discussed

T2.3 Background search (literature review, T1.2 Energy audits, previous experience, etc.) / ENEA

ongoing

T2.3 Definition of best practices list – Initial version of the guide /ENEA

ongoing

T2.3 Design & implementation of an interactive guide / ENEA ongoing

T2.4 Identification of further requirements for the design of the energy monitoring tools /ATC

Initial technical discussions between ATC,

AUEB & INTRA

5ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Introduction (Motivation, Approach)• High level Architecture (Prerequisites, Data

Capturing & Storing Infrastructure) • Data Capturing Infrastructure (Proposed

data format, Embodying existing Energy Management Systems, Using Open Solutions)

• Data Storing Infrastructure (XML Parsing & Cleansing, HBase, Hadoop – Aggregation, RDMS)

ToC D2.1 (1/2)

6ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Security Issues (Confidentiality, Integrity, Availability)

• Energy consumption of SC processes & PLM data management – Mapping of direct and indirect energy

consumption to products & processes– Accumulation of energy consumption/carbon

emissions across the supply chain

ToC D2.1 (2/2)

7ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Finalisation of Identification of the project case studies (WP1)

• Finalisation of the first phase of T2.1 (Setting of the overall infrastructure) and T2.2 (Methods & data management structure) and submission of D2.1

• Submission of the initial version of the energy consumption reduction tool (T2.3)

Pending Tasks

8ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Acquisition and Installation of metering devices at Piacenza

• Decision on the way the energy data of MC will be transmitted to the Technology partners

• Drafting and submitting D2.1 (AUEB /DITF, with contributions from ENEA) – Due on May 31st 2012

Critical pending issues

9ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

Six months planning (1/3)

Task / Leader / Activity May 12

Jun 12

Jul 12

Aug 12

Sep 12

Oct 12

T2.1 / AUEB / Writing the associated parts of D2.1

T2.1 / AUEB / Refinement of technical details of the data capturing infrastructure

T2.1 / AUEB / Testing of the functionality and scalability of the suggested infrastructure in lab environment

T2.1 / AUEB / Pre-pilot testing of the suggested infrastructure on real data, once the hardware/software has been installed at the end users

T2.2 / DITF /Writing the associated parts of D2.1 & contribute in D2.1 with input from MC energy Audits

T2.2 /DITF / KPIs and reference values

T2.3 /ENEA / Contribute in D2.1 with input from Piacenza Energy Audits outcomes

10ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

Six months planning (2/3)

Task / Leader / Activity May 12

Jun 12

Jul 12

Aug 12

Sep 12

Oct 12

T2.3 /ENEA / Continue with the pending activities after discussion and decisions between the partners

T2.4 / ATC / Energy monitoring tools definition based on the outcomes of WP1 and D2.1

T2.4 / ATC / Drafting of the use case scenarios

T2.4 / ATC / Requirements diagrams and Database design

T2.4 / ATC / Monitor development of D2.2 (1st prototype of the tools)

T2.5 / INTRA / Secure that real-time access to sensor data (smart meter data acquisition) has been fully specified and provided

T2.5 / INTRA / Secure that the business process of textile production has been modeled with a business process modeling tool and provided

11ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

Six months planning (3/3)

Task / Leader / Activity May 12

Jun 12

Jul 12

Aug 12

Sep 12

Oct 12

T2.5 / INTRA / Secure that third-party systems integrate with ARTISAN: ERPs (data interfaces?), LCI, SCMs, Product Inventories, EPC services…

T2.5 / INTRA /Development of 1st prototypes of the tools (initial version –M12)

top related