Ključne brojke 2014
Key Figures
Duljina mreže po broju trakova/Length by number of lanes
61,2 km 1.207,4 km 20,8 km
1.289,4 kmAutoceste/poluautoceste u prometuMotorways/semi-motorways in service
Nove autoceste otvorene u 2014.New motorways opened in 2014
Dopuna do punog profila u 2014.Upgrade to full profile in 2014
Nove autoceste - otvorenje u 2015.New motorways scheduled in 2015
0,0 km
0,0 km
24,2 km
2
MREŽA AUTOCESTA/MOTORWAY NETWORK
20,8 km 2 X 3 traka/lanes
6 1 ,2 km 2 X 1 trak/lanes
1.207,4 km 2 X 2 traka/lanes
38,8 kmBroj mostova i ukupna duljinaNumber and total length of bridges 151
Duljina zidova za zaštitu od bukeLength of noise protection walls 88 km
3
Razvoj mreže po godinama/Development of network by years (km)
Otvoreno novih autocesta po god./New motorways opened to traffic by years (km)
MREŽA AUTOCESTA/MOTORWAY NETWORK
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
0 50 100 150 200 200 km
1996
1997
1999
2000
2001
2002
2003
2004
2005
2006
2007
0 200 400 800 1000 1400 km600 1200
149,0
92,3195,3
43,781,0
41,439,4
0,0
0,0
0,0
10,0
32,5
19961991
1998
201020092008
20122011
20142013
346,4394,3
418,2466,9
522,5540,8
559,0598,6
747,6942,9
1.035,21.078,9
1.159,91.201,3
1.240,71.250,7
1.289,4
4
Mala Kapela A1
57 kmUkupna duljina tunelaTotal length of tunnels
4,4 %Udio tunela u ukupnoj mrežiPortion of tunnels in total network
5,8 kmNajduži tunelThe longest tunnel
733
> 1 km
> 2 km
> 5 km45
6
MREŽA AUTOCESTA/MOTORWAY NETWORK
Ukupan broj tunelaTotal number of tunnels 51
Broj nezgoda u tunelimaNumber of accidents in tunnels 68
3,1 % Udio nezgoda u tunelimaPortion of accidents in tunnels
5
U planiranjuIn project
U izgradnjiIn construction
U prometuIn service
A2
A9A1
A10
A11 A5
A4
A3
A8A6
A7
A1*
A3
A1
A1
MostDrava
UKUPNO/TOTAL: 1.289,4 km
MostSava
A9
MREŽA AUTOCESTA/MOTORWAY NETWORK
Dijelom autoceste A1 od Zagreba do Bosiljeva upravlja ARZ/Part of the motorway A1 from Zagreb to Bosiljevo is operated by ARZA1*
A10 A11
Most KRKBridge Krk] [
HAC 901,4 km
ARZ 187,0 km
BINA ISTRA 14 1 ,0 km
AZM 60,0 km
A1 A4A5A3
A1* A6A7
A2
A8A9
Tunel Sveti IlijaTunnel Sveti Ilija
A2: Zagreb – Macelj Zagreb – Krapina Krapina – Macelj Dio dionice Krapina – Đurmanec
60,0042,8013,40*3,80
–––
–––
––––
60,0042,8013,40*3,80
–––
UKUPNO/TOTAL: 60,00 – – 60,00
A1: Bosiljevo 2 – Split – Dubrovnik 415,30 – – – 415,30 –DC 532: Spojna cesta Zagvozd - Baška Voda* 7,30 – – – 7,30 –Spojna cesta Karamatići - Luka Ploče – – – 1,20 – –A3: Bregana – Zagreb – Lipovac 306,40 – – – 306,40 –A4: Zagreb – Goričan 96,90 – – – 96,90 –A5: Beli Manastir – Osijek – GP sa BiH
B. Manastir – Osijek (samo most Drava 2,5 km) Sredanci – granica BiH (Svilaj) Most Drava - OSijek Most Sava
55,50––––
–––––
–2,503,20
––
–––
3,800,70
58,70––––
– –
3,20––
A10: Granica sa BiH – Metković - č. Ploče 8,50 – – – 8,50 –A11: Zagreb – Sisak
Jakuševec – Velika Gorica jug Buševec – Lekenik
11,50––
–––
–10,0011,00
–––
32,50––
–10,0011,00
Brza cesta DC10 Podravski ipsilon Gradec - Križevci
– –12,50
––
––
––
Brza cesta DC12 Podravski ipsilon Vrbovec - Farkaševac
––
–– 10,60
––
––
––
UKUPNO/TOTAL: 901,40 – 49,80 5,70 925,60 24,20
A1: Bosiljevo 2 – Zagreb 65,25 – – – 65,25 –A6: Rijeka – Bosiljevo 2 81,25 – – – 81,25 –A7: Rupa – Matulji – Diračje – Orehovica 28,00 – – – 28,00 –D10: Most Krk i pristupne ceste 12,53 – – – 12,53 –
UKUPNO/TOTAL: 187,03 – – 187,03 –
A8: Kanfanar – MatuljiKanfanar – Pazin (č. Rogovići)Pazin – Matulji*
64,2118,1346,08
–––
–
–
––
**10,68
64,2118,1346,08
–––
A9: Umag – PulaUmag – MedakiMedaki – KanfanarKanfanar – Vodnjan jugVodnjan jug – Pula
76,8041,84
7,3620,70
6,90
–– –––
––––
––––
76,8041,84
7,3620,70
6,90
–––––
UKUPNO/TOTAL: 141,01 **10,68 141,01
Autocesta/poluautocestaMotorway/semi motorway
U prometuIn service 31/12/2014
OtvorenoOpen in 2014
U izgradnji/In construction 01/01/2015
Početak izgradnje Start of const. in 2015
Ukupno Total
Otvaranje Opening in 2015
UKUPNO HRVATSKATOTAL CROATIA: 1.289,44 49,80 5,70
**10,68 1.313,64 24,20
* poluautocesta/brza cesta // semi motorway/fast road
UKUPNO SVE AUTOCESTETOTAL ALL MOTORWAYS
BINA - ISTRA d.d.
AUTOCESTA RIJEKA - ZAGREB d.d.
AUTOCESTA ZAGREB - MACELJ d.o.o.
HRVATSKE AUTOCESTE d.o.o.
A2: Zagreb – Macelj Zagreb – Krapina Krapina – Macelj Dio dionice Krapina – Đurmanec
60,0042,8013,40*3,80
–––
–––
––––
60,0042,8013,40*3,80
–––
UKUPNO/TOTAL: 60,00 – – 60,00
A1: Bosiljevo 2 – Split – Dubrovnik 415,30 – – – 415,30 –DC 532: Spojna cesta Zagvozd - Baška Voda* 7,30 – – – 7,30 –Spojna cesta Karamatići - Luka Ploče – – – 1,20 – –A3: Bregana – Zagreb – Lipovac 306,40 – – – 306,40 –A4: Zagreb – Goričan 96,90 – – – 96,90 –A5: Beli Manastir – Osijek – GP sa BiH
B. Manastir – Osijek (samo most Drava 2,5 km) Sredanci – granica BiH (Svilaj) Most Drava - OSijek Most Sava
55,50––––
–––––
–2,503,20
––
–––
3,800,70
58,70––––
– –
3,20––
A10: Granica sa BiH – Metković - č. Ploče 8,50 – – – 8,50 –A11: Zagreb – Sisak
Jakuševec – Velika Gorica jug Buševec – Lekenik
11,50––
–––
–10,0011,00
–––
32,50––
–10,0011,00
Brza cesta DC10 Podravski ipsilon Gradec - Križevci
– –12,50
––
––
––
Brza cesta DC12 Podravski ipsilon Vrbovec - Farkaševac
––
–– 10,60
––
––
––
UKUPNO/TOTAL: 901,40 – 49,80 5,70 925,60 24,20
A1: Bosiljevo 2 – Zagreb 65,25 – – – 65,25 –A6: Rijeka – Bosiljevo 2 81,25 – – – 81,25 –A7: Rupa – Matulji – Diračje – Orehovica 28,00 – – – 28,00 –D10: Most Krk i pristupne ceste 12,53 – – – 12,53 –
UKUPNO/TOTAL: 187,03 – – 187,03 –
A8: Kanfanar – MatuljiKanfanar – Pazin (č. Rogovići)Pazin – Matulji*
64,2118,1346,08
–––
–
–
––
**10,68
64,2118,1346,08
–––
A9: Umag – PulaUmag – MedakiMedaki – KanfanarKanfanar – Vodnjan jugVodnjan jug – Pula
76,8041,84
7,3620,70
6,90
–– –––
––––
––––
76,8041,84
7,3620,70
6,90
–––––
UKUPNO/TOTAL: 141,01 **10,68 141,01
Autocesta/poluautocestaMotorway/semi motorway
U prometuIn service 31/12/2014
OtvorenoOpen in 2014
U izgradnji/In construction 01/01/2015
Početak izgradnje Start of const. in 2015
Ukupno Total
Otvaranje Opening in 2015
UKUPNO HRVATSKATOTAL CROATIA: 1.289,44 49,80 5,70
**10,68 1.313,64 24,20
** dopuna do punog profila autoceste // upgrade to full motorway profile
8
USLUGE/SERVICES
HoteliHotels
9
Odmorišta/Rest areas
124svakih/every 20 km
Benzinske postaje/Filling stations
76svakih/every 28 km
Cafe barovi/Caffe bars
83svakih/every 23 km
Restorani/Restaurants
20svakih/every 74 km
Prijelazi za divlje životinjeCrossings for wild animals
13
Broj dinamičkih informacijskih panela/Number of VMS
130COKP Centri održ. i kont. prometaMTCC Maint. & Traffic Control Centres
29
Broj parkirališnih mjesta LVNumber of parking places LV
6.588Broj parkirališnih mjesta TVNumber of parking places HV
2.152
9
Broj vozila u područjima naplateNumber of vehicles in toll collection zones 65,7 mil/
mio
TvrtkaCompany
%(14/13)
%(14/13)
Total %(14/13)
HAC 28.322.549 1.35 4.323.945 5,50 1,88
ARZ 16.905.622 1.15 1.832.433 9,15 1,88
Bina-Istra 7.449.854 3.31 651.036 -0,38 3,00
AZM 5.448.753 -12.45 720.778 -5,39 -11,68
UkupnoSubtotal: 58.126.778 0.06 7.528.192 4,66 0,56
SveukupnoTotal: 65.654.970 0,56
Udio LV i TV u ukupnom broju vozilaPortion of LV & HV in total no. of vehicles
0,6 %Rast broja vozila u područjima naplateIncrease in number of vehicles in tollcollection zones
2014/2013
PROMET/TRAFFIC
88,5 %
11,5 %
10
PGDP po tvrtkama/AADT by companies
Broj vozila u područjima naplate 2012. - 2014. (u mil. voz.)Number of vehicles in toll collection zones 2012 - 2014 (in mio veh.)
106 x kmBroj voznih kilometaraNumber of km travelled
PROMET/TRAFFIC
6.537,8
DruštvoCompany
HAC 10.412 1.753 12.165ARZ 14.834 1.866 16.700
Bina-Istra 20.411 1.784 22.195AZM 14.156 1.555 15.711
Ukupno/total: 12.163 1.739 13.902
1 .142,2 BINA ISTRA
344,1 AZM
1 .109,4 ARZ
3.942,1 HAC
2012
2013
61,4
2014
61,8 62,2 62,6 63,0 63,4 63,8 64,2 64,6 65,0 65,4 65,8 66,2
64,7
65,3
65,7
11
Nezgode po vrstama/Accidents by type
Nezgode po tvrtkama/Accidents by companies
Broj vozila koja su sudjelovala u nesrećamaNumber of vehicles involved in accidents
SIGURNOST/SAFETY
2.835
2011 2012 2013 2014S poginulimaWith fatalities 28 29 31 21
S ozlijeđenimaWith injuries 367 346 308 293
S materijalnom štetomWith material damage 1.971 1.839 1.823 1,863
Ukupno nezgodeTotal number of accidents 2.366 2.214 2.162 2,177
Ukupno prometne nezgodeTotal traffic accidents 2.177
0,7 % Rast prometnih nezgodaIncrease in traffic accidents
2014/2013
75 BINA ISTRA
1 5 1 AZM
3 1 1 ARZ
1,640 HAC
12
Ukupno poginuli/Total of fatalities 2011. - 2014.
Poginuli prema porijeklu registarske pločice vozilaFatalities by origin of vehicle registration plates
SIGURNOST/SAFETY
Stupanj smrtnosti (109 voz. km)Rate of dead (109 km travelled)3,8
Ukupno poginuliTotal of fatalities25
-35,9 % Pad broja poginulihDecrease in fatalities
2014/2013
Vozila registrirana u RHCroatian registration plates
Vozila registrirana izvan RHInternational registration plates
14
11
Broj nesreća pri idealnim uvjetima vožnjeThe number of accidents in ideal driving conditions1.590
2011
2013
0
2014
10 20 30 40 50
2012
31
45
39
25
13
Prekoračenje brzine/ Slijetanje s ceste Excess speed/Skidding off the roadway
Najčešći uzrociMost frequent causes
Stupanj sigurnosti (na 109 voz. km)Safety ratios (per 109 km travelled)
HAC ARZ Bina- Istra AZM RH
CroatiaRH %
14./13.Nezgoda s ozlije đenimaPersonal injury rate 47,69 54,87 9,62 75,58 44,81 -5,89
Nezgoda s poginulimaFatal accident rate 4,06 3,17 1,75 0,00 3,21 -32,98
Koeficijent poginulihRate of dead 4,82 4,22 1,75 0,00 3,82 -36,58
Srijeda/PetakWednesday/Friday
Najkritičniji daniThe most critical days
Materijalna štetaMaterijal damage
Najčešće posljediceMost frequent consequences
Ukupno prometne nezgode službe održavanjaTotal traffic accidents of Maint. Service Staff
Lakše ozlijeđeni/Injuries without hospitalisation
Teže ozlijeđeni/Injuries with hospitalisation
1875{
8 - 10 i18 - 20 h
Najčešće doba dana za prometne nesreće The most common time of day for traffic accidents
Srpanj/kolovozJuly/August
Najkritičniji mjeseciThe most critical months
SIGURNOST/SAFETY
Poginuli/Fatalities0
Broj nesreća uzrokovan prekoračenjem brzineThe number of accidents caused by excess speed353
14
Pokriveno ENC-omCovered by ETC
1.229 kmTrakovi za ENCETC lanes
466
€
u mil/in mio EUR
399.729ENC Uređaji/OBUs
8,8 %Povećanje/Increase
255.101ENC Pretplatnici/ETC Subscribers
9,0 %Povećanje/Increase
EKONOMIJA/ECONOMY
Prihodi od cestarine (bez PDV-a)Toll revenues (without VAT) 297,0 mil/
mio
2,6 % Porast prihoda od cestarineIncrease in toll revenues
2014/2013
66,2 ARZ
25,6 AZM
183,6 HAC
21,6 BINA ISTRA
2014/2013
2014/2013
Trakovi za naplatuToll lanes
686Naplatne postajeToll plazas
105
15
Udio načina plaćanja u ukupnim transakcijamaBreakdown of transactions by payment mode
Prihodi od cestarine/Toll revenues 2012. - 2014. u mil/in mio KN
1 EUR = 7,63 KN (Godišnji prosjek srednjeg deviznog tečaja HNB za 2014. Annual average exchange rate in 2014, Source: Croatian National Bank)
EKONOMIJA/ECONOMY
65,7 Ukupan broj transakcijaTotal number of transactions
mil/mio
1 % OSTALO/OTHER
30 % ENC/ETC
15 % KREDITNE KARTICE/CREDIT CARDS
52 % GOTOVINA/CASH
2 % SMART KARTICE/SMART CARDS
Ukupno investicijeTotal investments
u mil/in mio EUR
U nove dioniceInto new sections
U izgradene dioniceInto existing sections
30,1
57,5
€87,6 mil/mio
2012
2013
0,0
2014
500 1000 1500 2000 2500
2.126,5
2.245,9
2.266,5
16
Ukupno investicije/Total investments 2012. - 2014.
* AZM, ARZ i BINA ISTRA nisu imale investicija u nove dionice* AZM, ARZ and BINA ISTRA had no investments into new sections
EKONOMIJA/ECONOMY
u mil/in mio EUR
Investicije u izgrađene dioniceInvestments into existing sections€30,1 mil/
mio
2,2 ARZ
3,7 AZM
21,1 HAC
3,1 BINA ISTRA
Investicije u nove dionice*Investments into new sections*€57,5 mil/
mio
Plan investicijaInvestment Plan€116,9 mil/
mio 2015.
€88,8 mil/mio
U nove dionice/Into new sections
€28,1 mil/mio
U izgrađene dionice/Into existing sections
u mil/in mio KN
0,0 500 1000 1500 2000
2012
2013
2014
1.947
1.849
669
1 EUR = 7,63 KN (Godišnji prosjek srednjeg deviznog tečaja HNB za 2014. Annual average exchange rate in 2014, Source: Croatian National Bank)
17
ZAPOSLENICI/WORKFORCE
Podjela po društvima/Breakdown by companies
Stalno zaposleni u društvima za autocestePermanent Workforce in concessionaire companies 276
9 BINA ISTRA10 AZM
44 ARZ213 HAC
Ukupno zaposleni na mreži autocestaTotal number of employees on the motorway network3.477
7252.752
137139
5882.613
Zaposlenici društava operatera Workforce in operating companies3.201
18
ZAPOSLENICI/WORKFORCE
Broj intervencija vatrogasnih jedinicaNumber of firebrigade interventions 1.409
Broj nadzornih video kameraNumber of CCTV cameras 1.569
Broj ralicaNumber of snowplowers 207
Podjela po operaterima/Breakdown by operators
221 BIUO (BINA ISTRA)
134 EGIS (AZM)
2.846 HAC-ONC (HAC/ARZ)
Podjela zaposlenika po poslovima/Breakdown of workforce by job
974 Naplata/Toll collection
1.351 Održavanje (bez ophodara)Maintenance staff (without patrol service)
184 Ophodari/Patrol service
672 Ostali/Other
20 Uprava/Management board
HRVA
TSKA
UDR
UGA
KONC
ESIO
NARA
ZA
AUTO
CEST
E S
NAPL
ATOM
CES
TARI
NE/C
ROAT
IAN
ASSO
CIAT
ION
OF T
OLL
MOT
ORW
AYS
CONC
ESSI
ONAI
RES
www.huka.hr
top related