item 8 update on the tijuana river valley recovery team ... filesan diego regional water quality...

Post on 15-Aug-2019

219 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

San Diego Regional Water Quality Control Board MeetingJune 21, 2017

Item 8Update on the Tijuana River Valley Recovery Team Five-Year Action Plan

Upper Tijuana River Watershed

Stream-Miles in Good ConditionTijuana Hydrologic Unit

Cross-Border Tributaries

Wetlands ofInternational Importance

A Recreational Treasure

On track

Significant delays or obstacles to address

Significant obstacles; modify approach

On track

Significant delays or obstacles to address

Significant obstacles; modify approach

Challenging Aspects

• Funding (general)

• Funding (O&M)

• Source Control

• Leadership Commitment

In addition to Action Plan update:• Impacts and investigative findings

related to raw sewage• Studies in the valley• State legislative and funding support

top related