ishan chandra nagar gram panchayat of dukli rd · pdf file11 anganwadi centers and 7 asha...
Post on 24-Mar-2018
223 Views
Preview:
TRANSCRIPT
ISHAN CHANDRA NAGAR
Gram Panchayat
of Dukli RD BlockAn Adarsh Gram
Under SAGY
IC Nagar GP
Ishan Chandra Nagar GP
• IC Nagar is one of 5 nos. GPs under Dukli
RD Block
• 6 Km border with Bangladesh and 2.5 Km
with Agartala Municipal Corporation
• Name of the MP(RS) :- Smt Jharna Das
Baidya
• Main occupations are agriculture and
fishery.
Ishan Chandra Nagar GP
• Number of Wards : 08
• Number of Villages : 14
• Name of the villages:
Vidyasagar Palli D block, Vidyasagar Palli C
block , Vidyasagar Palli A block, Vidyasagar
Palli B block, Durga Colony, Madhupur,
Nishchintapur, Kismatkuri, Maujkuri, Haripur,
Mantali, Muchitala, Koshinagar, Uttar
Madhavpur.
Geographic Information
• Geographical Area :610 Ha.
• Cultivable land :326 Ha
• Net sown Area :284 Ha
• Area Under Single Crop :166 Ha
• Area Under Double Crop :96 Ha
• Area Under triple Crop :22 Ha
• Gross cropped area :424 Ha
• Cropping intensity :149%
Geographic Information
• Current Fellow Land :42 Ha
• Area under non-agricultural use :167 Ha
• Number of farmers :685 Ha
• Number of DTWs :2 Ha
• Amon paddy area :116 Ha
• Boro Paddy area :225 Ha
• Vegetable area :46 Ha
• Other crops area :9 Ha
• Rubber & Misc area :117 Ha
DEMOGRAPHIC SCENARIO
• Total Population :6390
• Number of households :1653
• Male :3198
• Female :3192
• SC Households :354
• ST Households :03
• OBC Households :1074
• Other Households :208
• No. of eligible HH for pension (Old age, widow, disability):687
• No of HH receiving pension Old age, widow, disability):439
DEMOGRAPHIC SCENARIO
No. of house hold eligible for Ration Card :1581
No of house hold under RSBY : 1186
No. of HH having MGNREGA Job cards :1269
No. of BPL Families :687
No. of Land less Families :05
No. of IAY beneficiaries :211
No. of community sanitary complexes :01
Total number of persons with disability in the village :21
Number of SHGs :32
Educational Institutions• Schools
Primary Schools(Govt) :04
Secondary Govt. Schools :03
Higher Secondary Private Schools :01
• ICDS
Number of Anganwadi centers :11
• Sports Facilities
– Play Grounds :04
Coverage of Villages under
different Facilities & services
• Piped Water Supply :Covered
• Hand Pump Coverage :Covered
• Covered Drains :Not Covered
• Coverage under open drains
:Not Covered
• Village HH Electricity Connected
:1502
• Not connected :141
District Level Committee
1 Smt. Jharna Das Baidhya , MP, Rajya Sabha Chairperson
2 Sabhadhipati, PTZP. Member
3 Chairman , Panchayat Samity , Dukli. Member
4 District Magistrate & Collector , West Convener
5 PD DRDA West Member
6 Sr Deputy Magistrate (O/C Dev) O/o the DM & Collector (West). Member
7 Dy. Director, Agriculture Member
8 Dy. Director, Horticulture Member
9 Executive Engineer RD Agartala Div-1 Member
10 Executive Engineer, Water Resource Agartala Div-1 Member
11 Executive Engineer, DWS Agartala Div-1 Member
12 Executive Engineer, PWD (R&B) Agartala Member
13 Member Secretary DWSC Member
14 Chief Medical Officer West Member
15 Supdt. Of Sericulture, Agartala. Member
16 District Education Officer, West Member
17 Dy Director A Member
18 Lead District Manager, UBI, West Member
19 District Welfare Officer, West Member
20 District Forest Officer , West Member
21 Dy, Director , Fishery Member
22 Managing Director, TSCB Member
23 AGM SBI Member
24 Chairman TGB, Head Office , Abhoy nagar Member
Village Development Plan:
Targets & Achievements
Agriculture
Sl
No.
Area
of
Work
Sector Schemes Line
Dept.
Budget Status
1 Econom
ic
Develop
ment
SRI
Total=260 Ha
Agri. 10.19 lakh Completed
2 KCC Agri. 50 nos. Completed
3 Fruit Plantation Agri. 2 lakhs Completed
4 Soil Testing and
Fertilizer
Application
Agri. 400 nos. 200
5 Installation of
MDTW
Agri. As per
schematic
Provision
Completed
6 Farmer training
on SRI and Oil
Seed
Agri. 0.10 lakh
0.24 lakh
Completed
AGRICULTURE
Main crop is Paddy. 72 Ha SRI cultivation, 18 HaHorticulture plantation completed
Plan for 1 custom hiring center Rs.9 lakh Govt Subsidyand 1 lakh SHG Subsidy (National Mission onAgriculture Extension and Technology , NMAET)
Fishery
Total no.
of
Farmers
Total Water
area
Water area
utilized for
fish culture
Total area
created
during 14-15
Water area
reclaimed
during 2014-
15
Nos. Area Nos. Area Nos. Area Nos. Area
260 263 34.39 224 30.23 37 4.24 33 3.84
AGRICULTURE & ALLIED ACTIVITIES
100 beneficiaries trained on special development of fisheries Plan - Reclamation of 12 no of old water bodies and
production of IMC (Indian Major Carp) fingerlingTechnical support on dairy and poultry developmentPlan - Brooder House for Low input technology (LIT)
birds through MGNREGA is under construction
Veterinary Sub
Center
Sl. No. Name of the scheme TargetOut lay
( in lakh)Progress
1 Distribution of Aerator 2 nos. 0.80 Not yet started
2 Distribution of cast net & Aluminum Hundi 25 nos. 0.75 Not yet started
3 Distribution of pawn seed 30 nos. 0.175 1 beneficiary covered
4 Distribution of 3HP pump set 15 nos. 2.70 Not yet started
5 Composite fish culture 25 nos. 4.725 2 beneficiary covered
6 Semi-intensive fish culture 15 nos. 3.85 Not yet started
7 Production of IMC fingerling 15 nos. 0.99 Not yet started
8 2-days training camp with fish farmers 2 nos camps with 150
nos. farmers
0.525 14 beneficiary
attended training
9 Reclamation of old water bodies 12 nos. (0.96 ha) 6.00 Not yet started
Total 20.512
Sl. No Other works taken up by Fishery Department Amount involved Progress
1 Pisciculture in small tank 0.21876 3 beneficiary covered
2 Feed based intensive fish culture 0.4885 01
3 Distribution of prawn seed 0.0095 01
4 Supply of pabda seed 0.0065 1
5 Pisciculture by PDF 0.18 3
6 Entrepreneureship development among SHG through scientific fish culture 0.556 2 nos SHG covered
7 Pisciculture in big water bodies 0.746 01 (area 2.00 ha)
8 Social development programme(Pisciculture)@ Rs.6000 per unit 6.00 100 beneficiaries covered
District Water Sanitation
S SchemesBudget
(in Rs)Progress
1 Repair of pipeline= 5000 mtr. 250000Ongoing
2 Extn. Of Pipeline= 4550 mtr. 1137500On going
3 Sinking of SBDTW 4nos. 1400000Not Started
4 Const. of OHP 312000Not Started
5 Sinking of DTW=1 no. 3500000 Not Started
6
Construction of IHHL 1860000155 nos. are going
to complete by
15th April 2016.
Then it will be fully
covered
ARDD Deptt.
Sl.
no.
Scheme No of unit Unit cost Progress
1
Calf Growth meal under
Heifer rearing scheme8(Eight) Feed @ Rs.17 per
Kg
Feed being supplied to the cross
breed heifer on 50% subsidy
2
Milch Ration scheme
under RKVY20 nos.
Beneficiaries
Feed @ Rs.17.75
per Kg
Feed being supplied to the milch
cow on 25% subsidy
3
Poultry development
scheme9(Nine) Rs.900(Govt share)
Rs.300(Beneficiary
share
15 nos LIT poultry bird has been
distributed
4
NMPS-Piggery scheme One cluster of 100
unit
Rs.1.71 lakhs for
one cluster
Beneficiary for 100 sow selected
5Cultivation of Green
Fodder under RKVY1(One) Rs.4600 per unit Completed
6
Cultivation of cowpea for
seed production under
RKVY
1(One) Rs.3600 per unit Ongoing
7Rural Backyard Poultry
under NLM4(Four) Rs.3750 Ongoing
8
Construction of block
level Brooder House
under MGNREGA
1(One) Rs.13.97 lakhs One Brooder house will be
constructed
PWD Dept.Sl
no
Area of Work Sector Budget (in
Rs)
Completio
n timeline
Status
1 Kismatkuri Purba Para
house to Dilu Roy house
Infrastructu
re
30.00 9 month Estimate
submitted
2 Kismatkuri Purba
Subrata Biswas house to
Sudhan Roy house
Infrastructu
re
17.00 6 Month Estimate
submitted
3 Montali Nidhan Chodhury
house to Prabir Sarkar
House
Infrastructu
re
20.00 6 Month Started
4 Kashigar Tri-Ratna
Sangha to sushil roy &
Phanibhusan Sarkar
House
Infrastructu
re
45.00 12 Month Started
5 Uttar Madhav pur Anima
Sarkar house to
Apuranjan Choudhury
house via Sabuj Sarkar
house Border road
Infrastructu
re
45.00 12Month Started
Water Resource Department
Sl.no
Schemes Budget(Rs inlakhs)
Progress
1By Commissioning Tube well
at Madhav Pur-II30 lakhs Work Started
2By Commissioning Deep Tube
Well at Muskuri30 lakhs Work Started
3
By Commissioning of low
height pick up weir at Rayer
L.I Scheme
9 LacsWork will start
Shortly
Extension of PVC pipe line atWork Will Start
HEALTH
3 Health sub centersTripura Medical College (nearby)100% institutional deliveryImmunization of 0-6 age group- 100%0-6 age group children under ICDS coverage-100%11 Anganwadi Centers and 7 ASHA workers1141 nos. RSBY beneficiaries
Banking Sectors
Sl.Area of
WorkHow? [Scheme(S)/ Strategy] Progress as on date
1Financial
Inclusion
The village has a population of 5944 persons
with around 1643 households. Under One-
Family-One-Account Cocept, 100% of the
families have at least one Bank account.
All families have bank
accounts
2Benefit
Transfer
One ultra small branch with fixed point BC of
United Bank of India at Panchayet Office exists
making receipts from & payments to
beneficiaries.
United Bank of India
3 Insurance 3-4 Sensitization Camps2 camps done, remaining
planned in coming months
Education
Sl. No Schemes Mile stones Progress
1 RMSA
125 nos. of benches for IC Nagar JB
School, RK Gange High School,
Vidyasagar Palli High School,
Madhabpur High school.
Work will
start
Shortly
1 primary teacher in RK Gange High
School, 2 primary teacher in Vidyasagar
Palli High School
Work will
start
Shortly
Dining hall in for IC nagar JB School, RK
Gange High School, Vidyasagar palli
High School, Madhabpur High school
Work will
start
Shortly
2 Literacy100% Literacy Totally
Covered
NERLPActivities Progress
Total Number of household 1642
No of SHG formed 35nos
Number of house hold covered by forming SHGs 375nos
Major Activities a) Piggery (b)Diary(c)Poultry
(d)Agriculture (e)Horticulture (f)Petty
business (g) Mushroom cultivation, etc
Financial assistance from NERLP
SL.N
o
Grants/Funds from
NERLP
Amount
(in Rs)
No. of SHG's
received funds
Total Amount
(in RS)
1 Seed Fund 20,000.00 16 3,20,000.00
2 Livelihood Fund T1 40,000.00 8 3,20,000.00
3 Livelihood Fund T2 40,000.00 1 40,000.00
Grand Total 6,80,000.00
NERLP
Activities taken up:
• Organizational Management Training.• SHG leaders training.• Training on books and records update.• Training on business plan preparation (micro
credited plan).• Handhold support to the SHGs through bank
facilitators, SHG facilitators and Area coordinators.
• Livelihood training like piggery, diary, fishery, poultry etc.
NORTH EASTERN RURAL LIVELIHOOD PROGRAMME (NERLP)
• 30 women SHGs newly formed under NERLP and revived 32 SHGs. The Target is to form/revive 102 total women SHGs by March 2016
• 1 SHG Federation has been formed as per the guideline of NERLP• Training on Mushroom cultivation given to 9 SHGs by Horticulture
department ; construction of 5 sheds in progress• Vermi-compost training provided for 1 SHG, planned for another 5
SHGs by the Horticulture Department
Construction Works Taken up
under SAGY
IC Nagar Gram Panchayat Office
Name of the Work:- VidhyasagarPalli D Block AWC under MGNREGA
Estemated cost:- 6.02 lacs .
Name of the work :-Construction of Mushroom Shed
Estimated cost :-Rs 0.75 lacs (10 .nos)
Name of the Work:-Construction of Vermi composting unit
Estimated cost :-0.5 lacs.
Name of the Work-Construction of Brooder House at R K Gange ARDD Office
Estimated cost :-Rs 12.44 lacs
Construction of Road Under PMGSY at
IC Nagar GP
Glimpses of SAGY meetings
THANK YOU
top related