A Presentation to

Horry County Council

May 18, 2010

INTERNATIONAL DRIVEA RIDE II

Program Project

1

Proposed Alignment

2

Length: ±30,000ft = 5.6 miles ±Section: Two (2) lane with expansion to four (4) lane R/W 125’

List of Issues with SCDNR

Wetland Impacts

Red-Cockaded Woodpecker Habitat

Access Restrictions

Road Closure for Controlled Burns

Bear Crossings

3

4

Plan View Showing Key Features

SCDNR Issues

Wetland Impacts Avoidance Minimization Mitigation

1) Right-of-way needsCurrent 25’ easement 7± acresRegulatory Permitting 9± acres

5

Total: 16± acres2) Regulatory Permitting

SCDNR HURDLES

$1 Million±Red-Cockaded Woodpecker Habitat

Access Restrictions

Controlled Burn Roadway Closures

Bear Crossings

Tunnels and Fill ($2.0 million)Fencing ($0.6 million)

Total Additional Cost: $3.6 million

Thank You / Questions

6

7

Initial Construction Section Looking North

8

Ultimate Construction Section

9

Detail of Proposed Gates / Signage

Bear Fencing Detail

10

11

Section / Detail of Proposed Bear Crossing Structure