DAYABUMI COMPLEX

Muhammad Ridhwan Bin

ZakariaMuhammad Sabree

Bin Salleh

BCM543BUILDING SERVICES

ENGINEERING II

Intelligent Building

Intelligent building is related to the use of artificial intelligent to control the system or facilities provides to the building and artificial intelligent relates to the use of computer hardware and software which also include the use of mini circuit with microchip.

INTRODUCTION

DIMENSION TO INTELLIGENT BUILDING

• Building automation• Advance communication

• Office automation• Responsiveness to change

Case Study:

DAYABUMI COMPLEX

BACKGROUND

•Consist of 35-storey tower and six- storey podium block•One of the earliest skyscraper in Kuala Lumpur•It was designed in a modern Islamic style•Has a shopping mall called CityPoint at podium block

LOCATION

Dayabumi ComplexJalan Sultan Hishamuddin

50670 Kuala Lumpur

Click icon to add pictureClick icon to add picture

OWNER

CONTRACTOR

ARCHITECT

CONSTRUCTION

TYPES

HEIGHT

FLOOR COUNTCOMPLETED

157metres

35

14th Feb 1982

February 1984

Kumagai Gumi

MAA and BEP Consortium

Commercial Offices

GENERAL INFORMATION

BUILDING AUTOMATION

Building Automation System (BAS)

Fire Automation System (FAS)

Security Automation System (SAS)

•Controlling and monitoring facilities in the building•Using Honeywell Home Software•Control in BAS Control Room

BUILDING AUTOMATION SYSTEM (BAS)

Chiller System

Air Handling Unit (AHU)

System

Lighting Control

Electrical System

Lift & Escalator Control

Wet Fire System

Drainage System

System Architecture

OTHER SYSTEMS CONTROL BY BAS

•Fan Coil Unit (FCU)•Ventilation Fan•Security System•Watch Tour•Fire Alarm Interface•Hot and Cold Water Service

FIRE AUTOMATION SYSTEM (FAS)

•Including Fire Safety System and Lift Safety System•FAS is use computerized monitoring system•Supported by independent cabling network for continuous operation•Located at BAS Control Room

Fire Control Panel Indicator Panel show the four section

Indicator for all floors

For fire safety, the tower is divided into four sections for easy monitoring and action system

Computerized control monitor

Siren on the control panel to alert the

operator when there is an emergency

The printer will print the detection of emergency for

record automatically

Lift Control Panel

Lift Intercom

SECURITY AUTOMATION SYSTEM (SAS)

•The SAS systems is integrated with BAS•Petronas System Operation Room (PSOR) is the room to control all access system to the building.•SAS systems including CCTV, Anti-theft security and Access card system

Air Gate

Access Gate

CCTV System that is monitor from BAS Control

Room

ADVANCED COMMUNICATION

Private Automatic Branch Exchange (PABX) System

Internet and Intranet Network

Wireless Internet Connection (Wifi)

Cellular phone transmitter at

basement

Network server for internet and intranet

connectivity

RESPONSIVENESS TO CHANGES

•Dayabumi complex is now in a major renovation to improve the condition of the Dayabumi Tower and building a more sophisticated system in line with the current situation•This is in line to make complex Dayabumi as green buildings with intelligent features

CONCLUSION

THANK YOU