1) SOIL1) TRENCHING

2) BEDDING3) HAUNCHING4) BACKFILL5) COMPACTING TECHNIQUES

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 3/30

SOIL PLAY MOST IMPORTANT ROLE ININSATTALATION OF BURIED PIPELINE.ASTM D 2487 DEFINES SOIL CLASSESCLASSIFICATION IS DONE ON THE BASISOF FOLLOWING PROPERTIES

1) Percentages of gravel, sand, and fines

2) Shape of grain-size distribution curve3) Plasticity and compressibility

characteristics.

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 4/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 5/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 6/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 7/30

FOR MAXIMUM PIPE STRENGTH, THEWIDTH OF TRENCH SHULD BERESTRICATED TO WHAT IS ESSENTIAL TOSAFETY POSITIONTRENCH WIDTH OF RIGID PIPE ANDFLEXIBLE PIPE IS NOT SAME.

FOR RIGID PIPE, NO SPECIALREQUIREMENT FOR TRENCH WIDHNEEDED,BUT FOR FLEXIBLE PIPE, ITNEEDED

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 8/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 9/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 10/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 11/30

BASE OF THE TRENCHPREPARATION ONLY REQUIRED WHENTHE TRENCH BOTTOM IS UNSTABLE

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 12/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 13/30

1) TO BRING THE TRENCH BOTTOM UP TO THE GRADE2) TO PROVIDE UNIFORM LOGITUDINAL SUPPORT OF

THE PIPE.3) AVOID BLOCKING TO BRING THE PIPE TO GRADE4) PROVIDE SPECIFIED DENSITY AROUND PIPE5) ASTM 2321 PROVIDES A CLASSIFICATION CHART FOR

DETERMINED THE TYPE OF BEDDIND FOR VARYING

CONDITION.

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 14/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 15/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 16/30

1) IT COVER THE SPACE BETWEEN TOP OF BEDDING TOSPRINGLINE OF PIPE

2) TO OPTIMIZE PIPE STRENGTH BY PROVIDING ENOUGH

SIDE SUPPORT TO PIPE3) IT PROTECT PIPING MATERIAL,COATING ANDENCASEMENT FROM DAMAGED

4) HELP TO ENCOMPASSES THE BEDDING ZONE

5) COMPACT HAUNCHING AS REQUIED TO ACHIEVEDDENSITY SPECIFIED FOR BACKFILL MATERIAL

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 17/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 18/30

IT SHOULD BE BROUGHT TO THE SPECIFIEDDENSITY AROUND THE PIPE

BACKFILL MATERIAL SHOULD BE FREE OFLUMPS,CLODS,BOULDERS AND DERBIS .

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 19/30

Depth of coverDepth of waterPipe materialCompaction method available

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 20/30

BACKFILL

INTIALBACKFILL

FINALBACKFILL

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 21/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 22/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 23/30

THE MATERIAL USED IN FILLING ATRENCH,FROM BEDDING TO FINISHEDSURFACE

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 24/30

MECHANICAL COMPACTIONVIBRATIONFLOODING JETTINGFLUSHINGHIGH VELOCITY IMPACTSLURRY AND FLOWABLE FILL

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 25/30

densify the soil by rolling, kneading, pressing,impacting, vibrating, or any combination.. Heavy equipment (compactors, loaders,scrapers, etc. ) must not operate close to thestructuremisalignment, deflection, and high inducedstress may occur.

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 26/30

Loose soil can be compacted by vibrating itwith vibro plates and vibrating rollersSome compaction of the embedment can beachieved by vibrating the pipe itself

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 27/30

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 28/30

Soil density greater than critical can beachieved by jetting.This technique is particularly attractive for soilcompaction around large buried structures.

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 29/30

1) compaction can be achieved by droppingfrom a sufficient height, blowing, slinging, etc

2) Better control is achieved if dry soil is blownor slung into place

8/8/2019 Insttalation of Buried Pipeline

http://slidepdf.com/reader/full/insttalation-of-buried-pipeline 30/30

THANK YOU