Annual Outcome Survey
Training WorkshopPrepared by DEPOCENBac Kan Province, Vietnam
April, 2011
First thing first
• Greetings
• Working agenda• Purpose• Expected outcome
• Working format• Lectures (short)• Hand-on experience• Group discussion and group work
• Working schedule• Annual Outcome Survey
Working agenda
• Purpose• Conduct an Annual Outcome/Impact Survey for Backan• Training and capacity building for all other provinces
• Expected outcome• Standard and typical Annual Outcome/Impact survey for
Backan• Findings from this survey would assist the
implementation of IFAD project in Backan (corrective action)
• M&E officers are able to replicate and adapt similar Annual Outcome Survey in their provinces with minimal support from DEPOCEN
Working format
• Lectures (a series of short lectures on selected topics)• Hand-on experience
• Sampling• Sample design• Sampling construction
• Questionnaire design/modification• Based on log-frame of Backan project to modify
the standard IFAD questionnaire to suite with Backan situation
• Fieldwork interviews• First hand experience in conducting fieldwork
• Data entry and data analysis• Group discussion and group work
• Fieldwork group• Data group
Working schedule
See the attached agenda for detailed information
Day 1: Sample design and selection
Day 2: Questionnaire design
Day 3: Fieldwork training and data entry
Day 4-12: Fieldwork implementation and data entry under direct supervision by DEPOCEN
6
Consideration for conducting the survey
Ti and Ci : measurable characteristic of the population, i = time of observation (0,1).
T0: programme group T1: programme group
C0: control group C1: control group
Baseline Follow-up
1. Best case scenario: quasi-experimental design
intervention
Annual Outcome Survey and RIMS
RIMS is a comprehensive system for measuring, aggregating, and reporting on the results and impact of IFAD supported country programmes and projects;
RIMS is made up of a standardized list of common indicators that could be applied across all IFAD projects and programmes:
1st level indicators (outputs); 2nd level indicators (outcomes); 3rd level indicators (impact)
Annual Outcome
surveyRIMS Impact survey
Report and M&E system
1st and 2nd level Indicators
First level indicators (outputs)
• People trained in infrastructure management• People trained in improved agricultural practices• Kilometers of road constructed
Second level indicators (outcomes)
• Community groups manage infrastructure in a sustainable way
• Acres of land under improved agricultural practices• Community is using the road to market their produces
Annual Outcome
survey
1st LEVEL
RESULTS
[OUTPUTS]
2ND LEVEL RESULTS
[OUTCOMES]
IMPACT
Project Results-Chain
RIMS 1st level
Indicators
RIMS 2nd level
Indicators
RIMS 3rd level
Indicators
3rd level Indicators (RIMS Impact Survey)
MDGs RIMS 3rd level (impact) I ndicators Goal 1: Eradicate extreme poverty and hunger
Households with improvement in household assets ownership index, based on additional assets (productive assets, improved housing, etc.)* Reduction in the prevalence of child malnutrition*
Goal 2: Achieve universal primary education
Net enrolment ratio in primary education
Goal 3: Promote gender equality and empower women
Literacy rate (by gender) Ratio of literate f emales to males
Goal 6: Combat HIV/AIDS, malaria and other diseases
Reduction in the incidence of inf ectious disease (HI V/ AI DS, malaria, tuberculosis)
Goal 7: Ensure environmental sustainability
People with access to improved sanitation People with sustainable access to an improved source of water (drinking water)
* Mandatory for all projects under RIMS (Anchor Indicators)RIMS survey
LFs include other indicators that are not specified under RIMS
Annual Outcome Survey & Logical Framework
Narrative Summary
Objectively Verifiable
Indicators*
Means of Verification
s
Assumptions
Goal (Impact)
(incl. RIMS 3rd level results indicators)
Purpose (Outcomes)
(incl. RIMS 2nd level results indicators)
Outputs (incl. RIMS 1st level results indicators)
Activities
Inputs
Annual Outcome Survey & Logical Framework
Objective hierarchy
Project Logic
Goal (Impact)
Improved food security of 50% households in X area
Purpose (Outcomes)
70% of the farmers adopted sustainable agricultural practices
Outputs 700 farmers received training on sustainable agricultural techniques
Activities
(Process)
Conduct 5 training on sustainable agricultural techniques
Inputs Staff, Resources
Annual Outcome Survey & Logical Framework
Objective hierarchy
Indicators
Goal (Impact)
% households in X area reports increased food adequacy
% households in X area reports increased dietary diversity
Purpose (Outcomes)
% of farmers adopted sustainable agricultural practices
Outputs # of farmers received training on sustainable agriculture
Activities
(Process)
# of training on sustainable agriculture organized
Inputs Staff, Resources
Annual Outcome Survey & Logical Framework
Objective hierarchy
Project Logic
Goal (Impact)
Reduction in diarrheal incidence in X area
Purpose (Outcomes)
80% of the HHs use safe water in all purposes70% of HHs practice improved personal hygiene
65% of HHs use sanitary latrine
Outputs 200 women received counseling on safe water, personal hygiene and sanitary practices
160 households received subsidized latrine
Activities
(Process)
Conduct 15 counseling sessions on the importance of safe water, personal hygiene & sanitation
Distribute 160 sanitary latrines at a subsidized cost
Inputs Staff, Resources
Annual Outcome Survey & Logical Framework
Objective hierarchy
Indicators
Goal (Impact)
% of HHs report diarrheal incidence in the last two weeks
Purpose (Outcomes)
% of the HHs use safe water in all purposes% of HHs practice improved personal hygiene
% of HHs use sanitary latrine
Outputs # of women received counseling on safe water, personal hygiene and sanitary practices
# of subsidize latrine distributed
Activities
(Process)
# of counseling sessions conducted
Inputs Staff, Resources
Annual Outcome Survey: WHY?
IFAD is not attempting to report on all aspects of the project but rather on a limited number of indicators;
(i) Measure changes happening at the household level in terms of livelihoods and food security during the project life
(ii) assess targeting efficiency;(iii) provide evidence of project success or failure; and (iv) provide timely performance information necessary to
undertake corrective actions.
Annual Outcome Survey and RIMS Reporting Requirements
1. Annual Reporting
Pre Mid-Term Projects Post Mid-term Projects
-Report on 1st level indicators
-Report on 1st level indicators-Report on 2nd level indicators and ratings
2. Baseline, Mid-Term, Completion
- RIMS Impact Survey
Annual Outcome
survey
top related