huisman eric romeijn
Post on 08-Mar-2016
327 Views
Preview:
DESCRIPTION
TRANSCRIPT
SCHIEDAM
SEPTEMBER
2013
KEY VALUE OF HUISMAN: INNOVATIONERIC ROMEIJN, TECHNICAL MANAGER
HUISMAN EQUIPMENT
CONTENTS
What is Huisman?
Huisman Locations
Our Key Values
Innovations:
� Cranes� Cranes
� Pipe Lay Equipment
� Drilling Equipment
� Specials
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
WHAT IS HUISMAN?
Heavy Lift Heavy Lift CranesCranes Drilling Drilling
EquipmentEquipment
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Pipe Pipe LayLay EquipmentEquipment SpecialsSpecials
WHAT IS HUISMAN?
The ship wouldn’t be there, if the equipment wouldn’t be thereThe ship wouldn’t be there, if the equipment wouldn’t be there
Strong interaction between equipment design and ship designStrong interaction between equipment design and ship design
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
HUISMAN LOCATIONSTOTAL STAFF: 3000 FIXED AND FLEX
Sviadnov,
Headquarters
Schiedam,
Holland
Kosice,
Slovakia
Bergen, Norway
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Houston, Texas,
USA
Rio de Janeiro,
Brazil
Sviadnov,
Czech Republic
Fujian,
China
Singapore
Slovakia
Santa Catarina,
Brazil Perth,
Australia
Manufacturing
Engineering,
Service, Sales
HUISMAN PRODUCTION LOCATIONS
Schiedam-NL Sviadnov-CZ
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Schiedam-NL Sviadnov-CZ
Fujian-ChinaSanta Caterina-Brazil
Houston-US
PRODUCTION FACILITYCZECH REPUBLIC – SINCE 1997
Total area:
106.000m2
Production area:
27,000m2
Office area:
5,000m25,000m2
Maximum hoisting
capacity workshop:
120mt
Yard cranes:
2x 33mt @ 13m
25mt @ 10m
125mt @ 9m
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
PRODUCTION FACILITYCHINA – SINCE 2007
Total area:
284.000m2
Production area:
58,000m2
Maximum hoisting
capacity workshop:
2,000mt
Quay length:Quay length:
380m
Quayside crane:
2,400mt @ 30m
Water depth:
17m
Outside crane:
100mt @ 25m
30mt @ 25m
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
PRODUCTION FACILITYCHINA
Quay length:
380m
Quayside crane:
2,400mt @ 30m
Crane pivot above quay:
53m
Water depth:
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
17m
PRODUCTION FACILITYUSA – SINCE 2011
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
PRODUCTION FACILITYBRAZIL, CONSTRUCTION STARTED 2012
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
PRODUCTION FACILITYTHE NETHERLANDS – SINCE 1929
Total area:
90.000m2
Production area:
20,500m2
New production hall:
66m high, 56.5m wide
and 58.6m longand 58.6m long
Maximum hoisting
capacity workshop:
1,200mt
Quay length:
330m
Quay crane:
360mt @ 18m
35mt @ 30m
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
PRODUCTION FACILITYTHE NETHERLANDS
66M HIGH PRODUCTION HALL
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
HUISMAN ACADEMY
OUR KEY VALUES
Deliver quality:� reliable equipment
Deliver quality:� reliable equipmentBBBB
Offering innovative solutions:� client needs instead of ordinary or regular equipment
Offering innovative solutions:� client needs instead of ordinary or regular equipmentAAAA
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Turnkey delivery of projects:� Steel structure and mechanical structures
� Drive and Control System
� Design, manufacturing, testing and service
Turnkey delivery of projects:� Steel structure and mechanical structures
� Drive and Control System
� Design, manufacturing, testing and service
CCCC
Reliable partner:� We keep our promises: time, cost, and quality
Reliable partner:� We keep our promises: time, cost, and qualityDDDD
A: Cranes Innovation 1981 Floating Crane - Taklift 4
Shaft axles of upper
block rotated, such that
the lifting tackles can be
rotated sideways.
Shaft axles of upper
block rotated, such that
the lifting tackles can be
rotated sideways.
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
A: Cranes Innovation 1984: Mast Crane – Happy Buccaneer
Crane mast welded at
ship, such that the crane
moment does not have to
be transferred by the slew
bearing.
Advantage: Small foot
Crane mast welded at
ship, such that the crane
moment does not have to
be transferred by the slew
bearing.
Advantage: Small foot
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Advantage: Small foot
print and low centre of
gravity
Advantage: Small foot
print and low centre of
gravity
A: Cranes Innovation 1985: Heave compensation - Lorelay
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
LOAD
Passive Heave Compensation
Active
Heave Compensation
HPU
The wire rope can be
kept at a constant
tension.
The load can be kept at
a constant height.
Advantage: Better
controlled operations
The wire rope can be
kept at a constant
tension.
The load can be kept at
a constant height.
Advantage: Better
controlled operations
A: Cranes Innovation 1987: Secondary controlled heave compensation
The wire rope can be kept
at a constant tension (CT).
The load can be kept at a
constant height (AH).
Advantage: The system is
The wire rope can be kept
at a constant tension (CT).
The load can be kept at a
constant height (AH).
Advantage: The system is
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Advantage: The system is
more easy to operate
Advantage: The system is
more easy to operate
A: Cranes Innovation 1995: Ringer Crane
Crane which is easy
transportable and to erect.
Advantage: Reduced
mob/demob costs and
longer operational life.
Crane which is easy
transportable and to erect.
Advantage: Reduced
mob/demob costs and
longer operational life.
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
A: Cranes Innovation 1996: Sheerleg crane with 2 A-frames
The ship connected two
clients; each of them had
insufficient expertise and
funding to do it on its own.
The ship connected two
clients; each of them had
insufficient expertise and
funding to do it on its own.
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
A: Cranes Innovation 2002:Simple and reliable pedestal crane
In a difficult economic
time in 2002-2003
Huisman designed a
simple and reliable
pedestal crane.
Advantage: Cheap
In a difficult economic
time in 2002-2003
Huisman designed a
simple and reliable
pedestal crane.
Advantage: Cheap
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Advantage: Cheap
service for our clients.
Advantage: Cheap
service for our clients.
A: Cranes Innovation 2009: Segmented slew bearing
Regular bearing suppliers could not supply a
bearing.
Regular bearing suppliers could not supply a
bearing.
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Height above deck (m)
A: Cranes Innovation: Development since invention
140
120
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Height above deck (m)
A: Pipe Lay Innovation 1995: Straightener
Pipe lay ramp wihy
straightener, such that
less deck space is
required compared to S-
lay and less height is
required compared to J-
lay.
Pipe lay ramp wihy
straightener, such that
less deck space is
required compared to S-
lay and less height is
required compared to J-
lay.
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
lay.
Advantages:
� Less length
� Less height
lay.
Advantages:
� Less length
� Less height
A: Pipe Lay Innovation 1996: Pipe tensioner
A pipe tensioner is
designed such that the
squeeze load is well
distributed over the length
of the pipe.
Advantage: Guaranteed
A pipe tensioner is
designed such that the
squeeze load is well
distributed over the length
of the pipe.
Advantage: Guaranteed
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Advantage: Guaranteed
parallellity between the
tracks.
Advantage: Guaranteed
parallellity between the
tracks.
A: Pipe Lay Innovation 1997: Modular reel drive system
Several reels can be
stored on deck.
One reel can be
positioned such that it can
be unspooled.
Advantage: The client can
Several reels can be
stored on deck.
One reel can be
positioned such that it can
be unspooled.
Advantage: The client can
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Advantage: The client can
install the system on any
offshore support vessel.
Advantage: The client can
install the system on any
offshore support vessel.
A: Pipe Lay Innovation 2006: Retractable tensioner
The tensioner,
suspended in the pipe
lay ramp, can be
retracted to create
space for other
activities (J-lay, PLET’s,
etc.)
The tensioner,
suspended in the pipe
lay ramp, can be
retracted to create
space for other
activities (J-lay, PLET’s,
etc.)
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
etc.)
Advantage: A larger
scope of operations can
be carried out with the
same installation.
etc.)
Advantage: A larger
scope of operations can
be carried out with the
same installation.
10
12
14
Number of orders
Pipelay Orders
Flex lay
Reel lay
A: Pipe Lay Innovation: Development pipe lay systems
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
0
2
4
6
8
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Number of orders
Reel lay
J-lay
Multi Lay
S-lay
Component
A: Drilling Innovation 1998: Vertical Riser Storage in Columns Semi
Using a special riser
handling crane the risers
are stored vertically in the
columns and can still be
brought into the drill rig.
Advantage: The ship can
Using a special riser
handling crane the risers
are stored vertically in the
columns and can still be
brought into the drill rig.
Advantage: The ship can
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Advantage: The ship can
take more pay load on
deck.
Advantage: The ship can
take more pay load on
deck.
A: Drilling Innovation 1999: Multi Purpose Tower (MPT)
TRADITIONAL LOOK FUNCTIONAL LOOK NEW LOOK SINGLE MPT 1999 DUAL MPT 2007
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
A: Drilling Innovation 2000 Drilling tower: Splittable blocks
Sheaves in lower blocks
can be removed from
the block with a push
button.
Advantage: The speed
of the tackle can be
Sheaves in lower blocks
can be removed from
the block with a push
button.
Advantage: The speed
of the tackle can be
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
of the tackle can be
increased if less load is
suspended in a safe
and reliable way.
of the tackle can be
increased if less load is
suspended in a safe
and reliable way.
A: Drilling Innovation 2005: Containerized Land Drill Rig
A drilling unit is completely
containerized and
automated.
Advantage: The transport
costs and mobilization
time is reduced. The
A drilling unit is completely
containerized and
automated.
Advantage: The transport
costs and mobilization
time is reduced. The
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
time is reduced. The
operation is more safe and
predictable.
time is reduced. The
operation is more safe and
predictable.
A: Drilling Innovation 2006: Vertical Riser Storage
Crane for vertical riser
storage.
Advantage:
Faster handling of
risers.
Crane for vertical riser
storage.
Advantage:
Faster handling of
risers.
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
A: Drilling Innovation 2007 Drilling tower: Dual activity
The drilling string and
riser strings can be built
on separate drill floors.
Advantage: The drillers
are not hindered by
their colleagues in the
The drilling string and
riser strings can be built
on separate drill floors.
Advantage: The drillers
are not hindered by
their colleagues in the
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
their colleagues in the
other drilling process.
their colleagues in the
other drilling process.
Traditional dual
activity rig
Huisman dual
activity rigHuisman single
activity
A: Drilling Innovation 2007:Alternative set back pipe storage
By placing the set back
pipes in a carroussel the
pipe racker crane can be
more reliable.
Advantage: Less down
time by replacing linear
By placing the set back
pipes in a carroussel the
pipe racker crane can be
more reliable.
Advantage: Less down
time by replacing linear
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
guides to pivoting.guides to pivoting.
A rig with less functionality
can do the well
intervention.
Advantage: Much cheaper
ship can do the job
compared to a traditional
A rig with less functionality
can do the well
intervention.
Advantage: Much cheaper
ship can do the job
compared to a traditional
A: Drilling Innovation 2007: Well Intervention Tower
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
compared to a traditional
drill ship.
compared to a traditional
drill ship.
TYPICAL DRILLSHIP HUISDRILL DESIGN DRILL SHIP
A: Drilling Innovation 2009: Compact drill ship
� Payload: 20000 mt
� Derrick: 2.5 mln + 2.0 mln lbs
� Water depth: 3600 m
� Wind area: 6600 m2
� Displacement: 100000 mt
� Thruster power/Displ: 0.33 kW/mt
� Payload: 20000 mt
� Derrick: 2 x 2.4 mln lbs
� Water depth: 3600 m
� Wind area: 3200 m2
� Displacement: 54000 mt
� Thruster power/Displ: 0.41 kW/mt
230m 189m
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
A: Specials Innovation 1990:Sledge to transport bridge elements up to 8400t
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Compact sledge with guaranteed load distribution at the concrete sliding track.Compact sledge with guaranteed load distribution at the concrete sliding track.
A: Specials Innovation 2001:Grippers to lift the Kursk Submarine
Grippers are extremely
strong and guarantee
opening and closing,
regardless what is
inside the submarine.
Advantage: Our client
Grippers are extremely
strong and guarantee
opening and closing,
regardless what is
inside the submarine.
Advantage: Our client
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
Advantage: Our client
received the salvage
order.
Advantage: Our client
received the salvage
order.
B: DELIVER QUALITY
Reliable equipment:� Effective Quality Assurance System
���� ISO 9001/API Q1 to improve our organization
���� Test step-by-step
���� Learn from mistakes and improve designs and
cooperation
Reliable equipment:� Effective Quality Assurance System
���� ISO 9001/API Q1 to improve our organization
���� Test step-by-step
���� Learn from mistakes and improve designs and
cooperation
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
� Personnel
���� Careful Selection process
���� Education in Huisman Academy
���� Lots of design freedom and responsibility
� Personnel
���� Careful Selection process
���� Education in Huisman Academy
���� Lots of design freedom and responsibility
C: TURN KEY DELIVERY
� Sales and concepts
� Steel structure
� Mechanical structure
� Electrical system
� Hydraulic system
� Control System
� Purchasing
� Sales and concepts
� Steel structure
� Mechanical structure
� Electrical system
� Hydraulic system
� Control System
� Purchasing
Optimize
the
complete
Optimize
the
complete
BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013
� Purchasing
� Subcontracting
� Welding
� Machining
� Assembly
� Testing and commissioning
� Operation
� Service
� Purchasing
� Subcontracting
� Welding
� Machining
� Assembly
� Testing and commissioning
� Operation
� Service
complete
equipment
and
proces
complete
equipment
and
proces
Thank you for
your attention!
TAILOR MADE SOLUTIONSWWW.HUISMANEQUIPMENT.COM
top related