COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
GSECARS UpdateGSECARS UpdateNow have 3 beamlines running 100% of the time: 13-ID-D Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning)(bending magnet side station, commissioning)
Techniques available to the scientific communityTechniques available to the scientific community
Diamond Anvil Cell: Diamond Anvil Cell: energy-dispersive and monochromatic diffraction energy-dispersive and monochromatic diffraction and spectroscopyand spectroscopy Multi-anvil Press: Multi-anvil Press: energy-dispersive and monochromatic diffraction energy-dispersive and monochromatic diffraction and imaging (250 ton and 1000 ton press; acoustics, tomography)and imaging (250 ton and 1000 ton press; acoustics, tomography)Microprobe: Microprobe: XRF, XRF, XAFS, XAFS, CMT, CMT, XRDXRD Microtomography: Microtomography: absorption and edge CMTabsorption and edge CMTSurface scattering and spectroscopy: Surface scattering and spectroscopy: CTR,CTR, XSW, reflectivity, XSW, reflectivity, GIXAFS.GIXAFS.Extended X-ray Absorption Fine StructureExtended X-ray Absorption Fine Structure (EXAFS) (EXAFS)Microcrystal and powder diffractionMicrocrystal and powder diffractionInelastic scattering in the DACInelastic scattering in the DACBrillouin spectroscopy in the DACBrillouin spectroscopy in the DAC
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
GSECARS allocates 100% of available beam time on the basis of reviewed proposals through web-based forms (both GSECARS and APS ratings).
• All GSECARS proposals are submitted through the APS General User Program.
Productivity Summary Most Recent 12 months
ID Experiments 103 BM Experiments 105 Total Experiments 208 Beam Time Proposals Received
248
Oversubscription rate (ID) 2.5 Oversubscription rate (BM) 1.8 Outside Users (unique) 221 (2006) User visits 406 (2006) Publications: 2006 70 Publications 2007 to date 12 Publications total 530
GSECARS User ProgramGSECARS User Program
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
GSECARS FundingGSECARS Funding NSF-EARNSF-EAR
Operations funding for FY2007 is $1.81M. Grant was fully funded with Operations funding for FY2007 is $1.81M. Grant was fully funded with increase to $2.05M in FY2008. However, in February we were told to increase to $2.05M in FY2008. However, in February we were told to submit flat budget ($1.81M)submit flat budget ($1.81M)
Essentially no money for equipment in FY2007Essentially no money for equipment in FY2007 NSF-Major Research InstrumentationNSF-Major Research Instrumentation
X-ray optics to complete the 13-BM-C side station ($550K; $88K match; X-ray optics to complete the 13-BM-C side station ($550K; $88K match; 2004 – 2007)2004 – 2007)
Another MRI grant to UNLV for single-crystal diffraction in DAC has $225 Another MRI grant to UNLV for single-crystal diffraction in DAC has $225 for CCD detector for GSECARS, received.for CCD detector for GSECARS, received.
COMPRES Infrastructure Projects COMPRES Infrastructure Projects CO2 Laser Heating: Postdoc and laser system supportCO2 Laser Heating: Postdoc and laser system support Gas Loading Facility: $118K equipmentGas Loading Facility: $118K equipment Multi-anvil Module Project: $68KMulti-anvil Module Project: $68K equipmentequipment Johnson Noise Thermometry Project: $36KJohnson Noise Thermometry Project: $36K
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
GSECARS Funding (cont)GSECARS Funding (cont) NSF-GeophysicsNSF-Geophysics
Rheology Grand Challenge project recently funded, contains Rheology Grand Challenge project recently funded, contains $270K for post-doc and supplies for GSECARS.$270K for post-doc and supplies for GSECARS.
DOE – Midscale Instrumentation ProposalDOE – Midscale Instrumentation Proposal $864K mostly detector-related equipment in main NSF/DOE $864K mostly detector-related equipment in main NSF/DOE
renewal proposal submitted in Aug. 2006 at request of DOE renewal proposal submitted in Aug. 2006 at request of DOE program manager.program manager.
No funds in FY2007. Proposals will be held over for FY2008 when No funds in FY2007. Proposals will be held over for FY2008 when program should be funded.program should be funded.
NSF-EAR Nanoscale Research (NIRT)NSF-EAR Nanoscale Research (NIRT) Award to U. Alaska (T. Trainor, PI; $1.3M, 2004-2008; $310K Award to U. Alaska (T. Trainor, PI; $1.3M, 2004-2008; $310K
subcontract to UofC (P. Eng, PI) supports postdocsubcontract to UofC (P. Eng, PI) supports postdoc
13ID-C13ID-D13ID-B 13ID-A
13BM-D
13BM-C13BM-B
13ID-C213ID-D13ID-B 13ID-A
13BM-D
13BM-C13BM-B13ID-C1
LVP Laser Heated DAC
Microprobe
Horz. Focusing Mirror
Existing Mono. ID-C2 / DDiffractometer
Vert. Focusing Mirror
New Mono. ID-C1
New Horz. Deflecting Mirrors
ID Mono.
New Wall
Horz. Focusing Mirror
A.
B. Vert. Focusing Mirror
New Door
New Beam Center Line
New Shutters:C2/D& C1Shielded Beam Pipe
13ID-C13ID-D13ID-B 13ID-A
13BM-D
13BM-C13BM-B
13ID-C13ID-D13ID-B 13ID-A
13BM-D
13BM-C13BM-B
13ID-C213ID-D13ID-B 13ID-A
13BM-D
13BM-C13BM-B13ID-C1
13ID-C213ID-D13ID-B 13ID-A
13BM-D
13BM-C13BM-B13ID-C1
LVP Laser Heated DAC
Microprobe
Horz. Focusing Mirror
Existing Mono. ID-C2 / DDiffractometer
Vert. Focusing Mirror
New Mono. ID-C1
New Horz. Deflecting Mirrors
ID Mono.
New Wall
Horz. Focusing Mirror
A.
B. Vert. Focusing Mirror
New Door
New Beam Center Line
New Shutters:C2/D& C1Shielded Beam Pipe
Canted Undulator UpgradeCanted Undulator UpgradeProposal submitted to APS SAC Dec. 2006, waiting Proposal submitted to APS SAC Dec. 2006, waiting for responsefor responseGreatly increases time for high-pressure, Greatly increases time for high-pressure, microprobe is separated and runs 100% of timemicroprobe is separated and runs 100% of time
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
Detector HighlightsDetector Highlights• MAR-165 CCD detectors (2)
One funded by GSECARS-NSF and second by NSF-MRI UNLV/Dera single-crystal diamond cell grant.
• MAR-345 online image plate
GSECARS now has 2, new one funded by GSECARS-NSF
• Roper visible light CCDs
4 new cameras for LVP, tomography, diagnostics
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
Detector HighlightsDetector Highlights• Silicon Drift Diode detectors for energy-dispersive spectroscopy
GSECARS has 4-element detector on 6-month loan from SII under SBIR grant, being used right now.
Second 8-element (?) detector to be funded by grant to Kathy Kitts at NIU.
• Pilatus Pixel Array detector
State of the art detector. 500x200 array of 170x170 micron pixels. Each pixel has energy discriminator and 20-bit counter. Can count 2MHz/pixel, more than 200 frames/second.
Revolutionary for surface diffraction.
Could be used for very fast diffraction studies
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
Hardware Development HighlightsHardware Development HighlightsBM-C Development (interface diffraction and single-
crystal diffraction at high pressure): •Mirror tank, vertical focusing mirror installed. •Unfocussed monochromator being used, bender being
fabricated.•In commissioning for surface diffraction this week, DAC
experiments soon•Proposals in 2008-1
BM-D Brillouin Spectroscopy Instrument • Upgrade to diamond cell apparatus• COMPRES infrastructure project led by UIUC (J. Bass)• Two cycles now run in “user mode”• Report at this meeting
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
Hardware Development Highlights (cont.)Hardware Development Highlights (cont.)
ID-D CO2 heating laser• Being installed in 13-ID-D. Alexei Kuznetsov talk at this meeting.
Gas loading facility for DAC• Gas loading system being built by GSECARS with COMPRES funds, will be available to all high-pressure users at the APS.•Progress report at this meeting.
•Multianvil•Tomography•D-DIA30•Torroidal cell
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
Hardware Development Highlights (cont.)Hardware Development Highlights (cont.)
ID-D Diode Laser Upgrade• Fiber laser replacements for YLF heating lasers received and installed. Higher power and stability. 3 fiber lasers received, one will be for offline heating in laser lab, 2 for online use in ID-D.
•YLF lasers could be moved to X17 to replace old YAG laser there
Microprobe Stage Upgrade• Sample stage has been upgraded with a second X-Y-θ tier with 10 nm precision equipped with encoders.
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
B: DIA C: D-DIA D: T-Cup E: T-10
F: Hi-P Tomogr.
A: T-25
Multiple LVP Techniques
G: Torroidal cell
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
GSECARS Personnel NewsGSECARS Personnel News• Przemek Dera began as beamline scientist for the
DAC program on June 15.
• Norimasa Nishiyama, beamline scientist for the LVP has returned to Japan.
• Alexei Kuznetsov, post-doc for CO2 laser heating development; COMPRES and GSECARS funding
• Atsushi Kubo, post-doc for DAC
• Takeshi Sanehira, post-doc for Johnson noise thermometry project, COMPRES and GSECARS funding.
COMPRES 2007 Annual MeetingCOMPRES 2007 Annual Meeting
GSECARS Near Term GoalsGSECARS Near Term Goals Bring the 13-BM-C station fully online with scientific Bring the 13-BM-C station fully online with scientific
programs in interface diffraction and single-crystal programs in interface diffraction and single-crystal diffraction at high pressurediffraction at high pressure
Further develop the D-DIA apparatus for deformation Further develop the D-DIA apparatus for deformation experiments in the multi-anvil pressexperiments in the multi-anvil press
Further develop the high-pressure tomography Further develop the high-pressure tomography technique in the multi-anvil presstechnique in the multi-anvil press
Expand user program on the Brillouin spectroscopy Expand user program on the Brillouin spectroscopy system in 13-BM-Dsystem in 13-BM-D
Install and commission COInstall and commission CO22 laser heating for the DAC laser heating for the DAC in 13-ID-Din 13-ID-D
Install and commission gas loading system for DACInstall and commission gas loading system for DAC If APS SAC approves proposal for simultaneous If APS SAC approves proposal for simultaneous
operation of 13-ID-C and D with canted undulators operation of 13-ID-C and D with canted undulators then submit NSF-MRI proposal for upgrades then submit NSF-MRI proposal for upgrades downstream of shield wall. downstream of shield wall.