german planning and permitting process of transport ... · infrastruktur: plafer 15 – richtlinien...

Post on 29-Dec-2019

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

www.verkehr-und-raum.de

German planning and permitting process of transport infrastructure

Prof. Dr. Matthias Gather

Transport and Spatial Planning Institute

Erfurt University of Applied Sciences

German Infrastructure Reforms

organized by

Deutsche Botschaft,

Ministerstvo Dopravy,

Czech Infrastructure Association (ARI)

Prague, October 14th 2016

Gather: Planning and permitting of German transport infrastructure 1

Contents

• Responsibilities for

road infrastructure in Germany

• Planning steps

for national infrastructure

• Contents of „Linienbestimmung“

• Contents of „Planfeststellung“

• Templates and plans

• Summary

Gather: Planning and permitting of German transport infrastructure

Political level Road

European

Union

Transeuropean networks

National

Government („Bund“)

National roads =

„Bundesautobahnen and Bundesstraßen“

States („Länder“)

State roads („Staats- und Landesstraßen“)

But also:

Administration of National Roads

Local authorities

(„Kommunen“) Local roads

2

Responsibilities for road infrastructure

Gather: Planning and permitting of German transport infrastructure

Planning steps for national infrastructure

National transport plan

• Application for the National Transport Infrastructure Plan (BWVP)

• Assessment of BVWP incl. CBA and SEA with public participation

• Governmental infrastructure plan

National legislation

• Parliamental decision of the federal infrastructure investment act

• Specific legal acts for Road, rail and waterways

• Absolutely binding!

Regional assessment

• Regional spatial assessment with EIA and public participation

• Definition of the line („Raumordnung“ / Länder)

• Decision on the line („Linienbestimmung“ / Bund)

Buliding permission

• Integrated building permission („Planfeststellung“)

• with EIA and public participation

• Single document and overarching permit

3

Länder /

German rail

MoT

Länder /

Railway

authority

National

parliament

Länder /

MoT

Gather: Planning and permitting of German transport infrastructure

New administrative sources

4

• Bundesministerium für Verkehr, Bau und Stadtentwicklung, Abteilung Straßenbau: RE – Richtlinien zum Planungsprozess und für die einheitliche Gestaltung von Entwurfsunterlagen im Straßenbau. Ausgabe 2012.

• Bundesministerium für Verkehr und digitale Infrastruktur: PlafeR 15 – Richtlinien für die Planfeststellung nach dem Bundesfernstraßengesetz (Planfeststellungsrichtlinien 2015)

Gather: Planning and permitting of German transport infrastructure

Planning steps and responsibilities

5

Source: RE 2012, p. 17

Länder

Bund

Bund

Länder

Gather: Planning and permitting of German transport infrastructure

Contents of „Linienbestimmung“

6

A: Description

of the proposal

B:Plans

C: Studies and further

documents

D: Evidence /

supporting documents

Selected line

Source: RE 2012, p. 17

Gather: Planning and permitting of German transport infrastructure

Contents of „Linienbestimmung“

7

1 Description of the proposal

2 Justification of the proposal

3 Alternatives and comparison

4 Selected line Source: RE 2012, p. 17

Gather: Planning and permitting of German transport infrastructure

Contents of „Planfeststellung“

8

• One single building permit

> Bundling and concentration of all

necesseray permits incl. EIA

• Public disclosure of all documents

• Possibility to object for all affected persons

and public bodies

• Public hearing

• Decision of the permitting body (Länder) under

consideration and balancing of all concerns

• Duration 2 to 3 years

• Legally binding, but can be appealed against

Gather: Planning and permitting of German transport infrastructure

Contents of „Planfeststellung“

9

1 Description

of the proposal

2 Justification

of the proposal

3 Alternatives, comparison

and Selected line

Source: RE 2012, p. 17

Gather: Planning and permitting of German transport infrastructure

Contents of „Planfeststellung“

10

4 Technical Design

Source: RE 2012, p. 17

Gather: Planning and permitting of German transport infrastructure

Contents of „Planfeststellung“

11

5 Environmental impacts

6 Measures for prevention

and mitigation

of Environmental impacts

7 Costs

8 Legal framework

9 Realisation /

Construction phase Source: RE 2012, p. 17

Gather: Planning and permitting of German transport infrastructure

Templates of plans

12

Source: RE 2012, p. 17

Gather: Planning and permitting of German transport infrastructure

Templates: Regional assessment

13

Source: RE 2012, appendices

Gather: Planning and permitting of German transport infrastructure

Templates: Regional assessment

14

Source: RE 2012, appendices

Gather: Planning and permitting of German transport infrastructure

Templates: Land Acquisition

15

Source: RE 2012, appendices

Gather: Planning and permitting of German transport infrastructure

Grunderwerbsverzeichnis

für das Straßenbauvorhaben

Neubau der Ortsumgehung L-dorf

zu Unterlage / Blatt-Nr.: 10 / 2

Datum:

lfd.

Nr.

Bau-km Eigentümer: Name,

Vorname Straße

Wohnort

Grundbuch

von

Band Blatt

Gemarkung

Flur Flurstück

Nutz- ungs-

art

Größe des

Flurstückes

m2

Zu erwerbende

Fläche

m2

Vorüberg. in

Anspr. z. n.

Fläche m2

Dauernd zu belastende

Fläche

m2

Bemerkungen

1 2 3 4 5 6 7 8 9 10 11

2.12.1

2.12.2

0+680

0+680

Mustermann,

Max

Musterstraße 5

99999 Musterstadt

Traßdorf

- 254

Traßdorf

3 158

A

Gr

10 470 9 428 704

2.18.1

2.18.2

2.18.3

0+850

0+850

0+850

Mustermann,

Marion

Musterstraße 5

99999 Musterstadt

Traßdorf

321

Traßdorf

3 53/2

A 1 254 56

6

431 96

Templates: Land Acquisition

Source: RE 2012, appendices

Gather: Planning and permitting of German transport infrastructure

Templates: Land Acquisition

17

Source: Planfeststellung Flughafen Frankfurt

Gather: Planning and permitting of German transport infrastructure

Summary

• There are three major formal planning steps (with

public participation and EIA) in Germany:

Planning of demand, regional assessment /

decision on the line, and building permit.

• Step one and two are only binding for public

authorities and thus cannot be challenged by

individuals.

• However, the building permit has to assess the

legitimacy of all previous planning steps and can

be revoked in case of formal mistakes.

18

Gather: Planning and permitting of German transport infrastructure

Forschung • Anwendung • Wissenstransfer

Prof. Dr. Matthias Gather Verkehrspolitik und Raumplanung

Prof. Dr. Florian Heinitz

Transportwirtschaft

Prof. Dr.-Ing. Heinrich H. Kill Verkehrssystemgestaltung

Institut Verkehr und Raum

Fak. Wirtschaft-Logistik-Verkehr

Fachhochschule Erfurt

Altonaer Str. 25, D-99085 Erfurt

Tel. +49 (361) 6700 - 758

www.verkehr-und-raum.de

top related