ge product brochure

Post on 10-Mar-2016

225 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

Installation Our installation teams are made up of experienced personnel that are fully trained and aware of all the necessary statutory requirements and standards for every project they undertake. Each team member holds the correct qualifications for his or her job. Clean Air Act The Clean Air Act applies to gas (and other fuels) fired appliance installations with specific requirements for installations exceeding 366 kW total gross heat input, including approval of the height of the chimney by the local authority. In most cases the chimney height can be calculated in accordance with Clean Air Act Memorandum, which takes into account the fuel type, rated input, building heights and general topography of the surrounding area. The Clean Air Act gives power to local councils to control domestic and industrial smoke to improve local air quality and meet EU air quality standards for sulphur dioxide and particulates. It enables local councils to create 'smoke control areas'

TRANSCRIPT

FEATURES OF THE GE SYSTEM

ELEMENTS OF THE GE SYSTEM

ELEMENTS OF THE GE SYSTEM

ELEMENTS OF THE GE SYSTEM ELEMENTS OF THE GE SYSTEM

ELEMENTS OF THE GE SYSTEM

ELEMENTS OF THE GE SYSTEM

TYPICAL INSTALLATION DIAGRAMS

ASSEMBLY INSTRUCTIONS

PROTECTION PANELS

top related