from stock level till ap input & output vat output dp & fp

Post on 14-Feb-2017

54 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

From Stock Level till AP

Input & Output VAT Output

VAT Output DP & FP in FM

(one time) over LOAD

Anatoly Ryabukha

PB: Stock level budget (the same in CB, FB)

PB: Stock level budget (the same in CB, FB)

PB: Stock level budget (the same in CB, FB)

PB: Stock level budget (the same in CB, FB)

PB: Stock level budget (the same in CB, FB)

PB: BS/P&L/CAPEX/Stock level (the same in CB, FB)

PB: BS/P&L/CAPEX/Stock level (the same in CB, FB)

PB: Indirect CF (the same in CB, FB)

PB: SVA (the same in CB, FB)

top related