MAIN GOAL TO ACHIEVE
CLEAN KlodnicaCLEAN KlodnicaMAIN GOAL TO ACHIEVE
CLEAN KlodnicaCLEAN KlodnicaTarget – former II surface water quality class, in that:BOD5 – 8 mg/l;
total suspensions – 30 mg/l;
chlorides – 300 mg/l;
sulfates – 200 mg/l;
dissolved substances – 1000 mg/l;
total phosphorus – 0,25 mg/l;
total nitrogen – 10 mg/l;
ammonia nitrogen – 3 mg/l
1. Reduction of pollutant loads from towns and municipalities
2. Reduction of pollutant loads from industrial facilities3. Elimination of area pollution sources from municipal
and industrial areas, not connected to sewerage systems
4. Reduction of salt load discharge from mining water
5. Minimization of the negative impact of mining damages
6. Minimization of the impact of bottom sediments and sediments accumulated in flooded areas
SPECIFIC OBJECTIVESSPECIFIC OBJECTIVESSPECIFIC OBJECTIVESSPECIFIC OBJECTIVES
Tasks to be Tasks to be performed to performed to
achieve specific achieve specific objectivesobjectives
Reduction of pollutant loads from towns and municipalities
Wastewater management in municipalities (constructing new wastewater treatment plants and sewerage network, modernization of the existing facilities):
• development of municipal plans - if there are not any
• development of projects and facilitating the implementation of the already existing ones
• development of applications for financial support for the realization of plans and projects
Monitoring of activities and development of databases (asessment of effectiveness of the on-going and planned municipal projects)
Determination of parameters for simulation of the on-going and planned project outcomes
Control of the effectiveness of particular projects
Reduction of pollutant loads from industrial facilities
Management of wastewater from industrial facilities
• development of plans - if there are not any
• development of projects or facilitating the implementation of the existing ones
• development of applications for funding the implementation of plans and projects
Monitoring of activities and development of databases (assessment of effectiveness of the on-going and planned projects - reduction of industrial pollutants)
Elimination of area pollution sources from municipal and industrial areas,
not connected to the sewerage systems
Inventory of area pollution sources (unauthorized municipal
landfill sites, non-protected industrial landfills, dispersed
municipal wastewater sources - scattered old building,etc.)
Realization by:
development of plans - if there are not any
development of projects or facilitating the
implementation of the existing ones
development of applications for funding the
implementation of plans and projects
Reduction of salt load discharge
from mining water
Realization of the existing mining projects
and programs and, if required - development
of the new ones
Minimization of the impact of bottom sediments and sediments
accumulated in flooded areas
Identification of handling methods in the case of
sediments in the river-bed and its valley, posing
threat to the water quality
Development of sediment disposal methods which are
friendly to the environment, development of projects Development of applications
for funding the
implementation of plans and
projects
PROJECT FINANCIAL SOURCES Upper Silesian Electrical Power Engineering Plant, a joint
stock company (Górnośląski Zakład Elektroenergetyczny
S.A.) declares financing works connected with the co-
ordination of the project by the Institute for Ecology of
Industrial Areas in Katowice
EU funds
National Fund for Environmental Protection and Water
Management (Narodowy Fundusz Ochrony Środowiska i
Gospodarki Wodnej)
Voivodeship Fund for Environmental Protection and Water
Management (Wojewódzki Fundusz Ochrony Środowiska i
Gospodarki Wodnej)
EcoFund (EKOFUNDUSZ)
Industrial plants
Institutions required for the implementation of the „Friendly
Klodnica” project
Regional Board for Water Management (RZGW ) – river administrator - issues permissions for carrying works in the river-bed, recipient of target projects
Silesian Marshal’s Office (Śląski Urząd Marszałkowski) – managing the EU funds
Municipalities – executors of wastewater management projects and elimination of area pollution sources
Mines – executors of own, new and already existing projects
Mining Offices and Coal Company – co-ordinators of activities in mining industry and source of direct knowledge and documents, etc.
Tasks required for the implementation of „Friendly
Klodnica” project
Identification of main activities and works resulting from Water Framework Directive and relevant regulations
Quantitative and qualitative analysis of economic entities from Klodnica catchment area, bound by the IPPC Directive
Tasks to be performed within specific objectives for 2005
Inviting other economic entities and institutions, the participation of which will be essential, to join the „Friendly Klodnica” project
Preparing an application for financing the task: „Elimination of area pollution sources from municipal and industrial areas, not connected to the sewerage systems in Klodnica catchment area”
„ Determination of parameters for simulation of the on-going and planned project outcomes”
Justification: determination of the pollutant absorption
capacity of the river is required to control
outcomes of the implementation of particular programs,
especially municipal ones
„Determining reduction volume of pollutants discharged in particular river stretches, based on the implemented projects”
Justification: activity required to perform the task:
„Determination of parameters for simulation of
the on-going and planned project outcomes”
„Simulation of river pollution level at particular stages of the on-going projects”
Justification: the calculations are necessary for controlling the
implementation of projects and making corrections
Identification of tasks for which applications should be prepared
Justification: identification of priorities i.e. activities for which
applications for funding will be immediately prepared