Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
CONTENTS
Chapter 1: The Project……………………………………………………………………………………...02
1.1 Scope of Project……………………………………………………………………………….02
1.2 Project Details…………………………………………………..……………………………..031.2.1 Contract
Details……………………………………………………………………...031.2.2 Scope Details…………………………………………………………………………
04Chapter 2: The Concessionaire (O&M Operator).…………………………………………………….05
2.1 Scope of Work…………………………………………………………………………………05
2.1.1 Maintenance Management……………………………………………………….05
2.1.1.1 Highway Maintenance (Includes Guide & Afflux bunds)………….05
2.1.1.2 Project Property Management………………………………………….05
2.1.1.3 Incident Management…………………………………………………....05
2.1.1.4 Environment Management………………………………………………06
2.1.1.5 Engineering Improvement……………………………………………….06
2.2 Concessionaire Obligation Status…………………………………………………………07
2.2.1 Organization of Work……………………………………………………………….07
2.2.2 Contact Details………………………………………………………………………08
2.2.3Equipment/Plant/Machinery………………………………………………………09
Page 1 of 22KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
2.2.4 Provision for User Services……………………………………………………….…09Chapter 3: Highway Maintenance Management…………………………………………………….11
3.1 Highway Inspection Data……………………………………………………………………11
3.1.1 Maintenance Photographs………………………………………………………..12Chapter 4: Emergency Route Operations………………………………………………………………14
4.1 User Services & Accident Data………………………………………………………….....15
4.1.1 Ambulance Services…………………………………………………………….....15
4.1.2 Tow Away Crane Services…………………………………………………………15
4.1.3 Hydra Crane Services………………………………………………………………15
4.1.4 Fire Services……………………………………………………………………….....15
4.1.5 Round the Clock Route Patrol Services…………………………………………16
4.1.6 Incident Management Photos…………………………………………………….17
4.1.7 Accident Statistics………………………………………………………………......19
CHAPTER 1: THE PROJECT
National Highway No. 57 is one of the major arteries of the road network system in the State of Bihar connecting Muzzafarpur City with Purnea. It traverses through the major district headquarters of the state viz., Darbhanga and Forbesganj.
Nearly 10.635 Km. Project Highway section of NH-57, starts from Km. 148.550 near Tharia village on Nirmali side and ends at 159.185 near Chandpipar village on Kishanpurside. Thus in order to provide a better level of service to vehicular traffic it has been Aprided to
Page 2 of 22KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
Octment the capacity of NH-57 by constructing Kosi Bridge and its approaches between Ring Bund and Eastern Embankment.
In order to channelize the water of Kosi River and to protect the Bridge and its approaches, construction of Guide Bund perpendicular to the centre line of bridge and Afflux Bund joining the edges of Guide Bund on the upstream side with Ring Bund on Western Side and Eastern Embankment on Eastern Side.
1.1 SCOPE OF PROJECT:
This Project has been executed on the site, which is described in Project Site chapter of the Concession Agreement. The scope of the project shall include performance and execution by the Concessionaire of all Design, Engineering, Financing, Procurement, Construction, Completion, Operation and Maintenance of the Project Highway. It includes Improvement, Operations, Maintenance, Rehabilitation and Strengthening of the existing missing link of NH-57 road and widening it to a 4-lane divided carriageway including Kosi Bridge and its approaches from Km. 148.550 to Km. 159.185 in the State of Bihar on Annuity basis.
NHAI appointed M/s. Wilbur Smith Associates Inc in JV with Wilbur Smith Associates Pvt. Ltd., as the Independent Consultant for the Project.
1.2 PROJECT DETAILS
1.2.1. CONTRACT DETAILS
ProjectDesign, Construction, Finance, Operation and Maintenance of 4-lane Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.55 to Km. 159.185 on NH-57 on Annuity Basis
State BiharNational Highway No. NH – 57Employer National Highway Authority of India
Page 3 of 22KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
Independent Consultant Wilbur Smith Associates Inc in JV with Wilbur Smith Associates Pvt. Ltd.,
Concessionaire KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITEDSection Km. 148.55 to 159.185Length of the Project 10.635 KmLength of Eastern side Guide Bund 2.635 Km
Length of Western side Guide Bund 2.884 Km
Length of Eastern side Afflux Bund 7.773 Km
Length of Western side Afflux Bund 7.925 Km
Concession Period 20 yearsConstruction Period 36 monthsExtended Construction Period 24 months
Project Completion Date (Provisional) 08.02.2012
Concession Completion Date
20 years commencing from commencement date (From 4th
Apr’10 to 4th Apr’27)
1.2.2. SCOPE DETAILS
S.No Particulars Details
Additional work executed in COS which does not comes under
maintenance
1 Length of the Main Bridge (4 Lane)
1.878 KM and 20.70 M width
Number of foundations
40 nos.
Span Configuration
48.175x2 + 48.15x37
Page 4 of 22KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
S.No Particulars Details
Additional work executed in COS which does not comes under
maintenance
Type of super structure Segmental pre cast Box
Girder
2Length of Road (Excluding Main Bridge)
8.757 KM (7.25 M. x 2 widths 1.2 M Divider, 1.5 M Paved Shoulder and 1.5 M earthen shoulder both side of the road)
196 M paved shoulder
3 Length of Guide Bund
5.519 KM long (2.635 KM eastern side and 2.884 KM at western side)
400 M western side Guide Bund
4 Length of Afflux Bund
15.698 KM long (7.773 KM at eastern side and 7.925 at western side)
400 M western side Afflux Bund
5 Median Openings (Recommended) 3 nos.
6 Cattle Crossings 4 nos. (9.50m x 3.50m) 1 no.
7 Toll Plaza (1 No.) At chainage: 150+685
8 Service Road At Asanpur - Khupa village 1.415 KM
CHAPTER 2: THE CONCESSIONAIRE (O&M OPERATOR)2.1 Scope of Work
The Concessionaire is involved in the operation and maintenance activity of the project stretch along with other project facilities and services and is taking care of the following activities on regular basis.
2.1.1Maintenance Management
The concessionaire is also administering the maintenance management of the project highway and the other facilities through an experienced staffs located at the Maintenance
Page 5 of 22KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
Base Camp building near Majhari chowk. Also, the maintenance management team monitors different maintenance aspects (detailed below), through its mobile units patrolling on a continuous basis throughout the project corridor. The maintenance team is primarily looking after the following maintenance aspects as per the maintenance schedule laid down in the Annual Maintenance Programme.
2.1.1.1 Highway Maintenance (Includes Guide & Afflux bunds)
The objective of (project) Highway Maintenance is to maintain the safety, durability and functionality of the (project) highway throughout the concession period. This consists of routine preventive and periodical maintenance for the corridor carriageway and project bridge along with the facilities. Broadly, it will include maintenance of the carriageway, road furniture, buildings, crust, shoulder, slopes, side drains and cross drainage works.
2.1.1.2 Project Property Management
The objective of Project Property Management is to preserve the inventories and investments in the project road intact throughout the operation and maintenance phase. This includes identification of encroachments and ribbon development, land acquisition as desired by NHAI, enforcement of regulations, liaison with the connected authorities for the maintenance of Project asset.
2.1.1.3 Incident Management
The Incident Management is aimed to take immediate response measures to any incident occurring in the corridor within specified timelines by CA. Route patrol, surveillance, first aid, basic ambulance assistance, tow away & Hydra crane and road safety upkeep.
2.1.1.4 Environment Management
The objective of Environment Management is to preserve and protect the compatibility of the road system with the environment. The activities related to this are project horticulture including requisite planting and maintaining of existing trees, plants, shrubs and other suitable vegetation in the median and right of way of the project.
2.1.1.5 Engineering Improvements
Engineering Improvement is aimed at enhancing the project functionalities, deteriorated over time and rehabilitation of the project elements at specified intervals of time. This covers junction improvements, providing crash barriers, resurfacing and management of access.
Page 6 of 22KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
Page 7 of 22KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
2.2 Concessionaire’s Obligation Status2.2.1. Organization of work
2.2.2. Contact Details
Page 8 of 22KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
Name Designation Location Mobile No.
Mr. Raju Ranjan Project Manager Majhari Camp 7033894164
Mr. Rakesh Ranjan Site Engineer Majhari Camp +91-9771455521
Mr. Suman Singh System Engineer Majhari Camp 8862882930
Mr. Ramnath Ratnakar Admin & Public Relations Majhari Camp 9006741245
Mr. Akshaya Mallick Accounts & Stores Majhari Camp 9771627190
Mr. Shammi Kumar Section Supervisor 1 (Highway) Majhari Camp 8864040922
Mr. Neeraj Sharma Section Supervisor 2 (Highway) Majhari Camp 8969416668
Mr. Rajesh Singh CRO/RPO 1
Toll Plaza Building 9122551084Mr. Rakesh Ranjan CRO/RPO 2
Mr. Sushant Kumar CRO/RPO 3
Mr. Vivek Mishra CRO/RPO 4
Page 9 of 22KOSI BRIDGE INFRASTRUCTURE COMPANY LIMITED
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
2.2.3. Equipment/Plant/Machinery
Name/Description of Equipment No’s RemarksTow away Crane 1
Hydra Crane 1
Fire Tender 1
2.2.4. Provision for User Services
a. Ambulance
Vehicle Type and Model Staff Deployed
Date of mobilization of
Vehicle
Remarks
Tata Winger - 2012BHR-01-AD-2771
Paramedic = 03 Driver = 03
31st January 2012
b. Route Patrol Vehicles
Vehicle Type and Model Staff Deployed
Date of mobilization of
VehicleRemarks
Mahindra Bolero Camper - 2012BR-01-GC-1416
Route Patrol Officer = 03
Patrol Assistant = 03 Driver = 03
31st January 2012
c. Tow Away & Hydra Crane
Date of mobilization 31st January 2012
Type & Capacity of Towing Vehicle
TATA TRUCK MOUNTED TOW SYSTEM 7.5 MT HR-67-7063
Type & Capacity of Hydra Vehicle15 MT CRANEDL-01M-4207
Page 10 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
d. Toll Software/Equipment
Name of Equipment/Software Date of Mobilization RemarksToll Management System 31st March 2012
e. Status of Control Room/Emergency Contact Information
1) Help Line No. 9122551084(24 hours)2) Help Line No. 9973673906(24 hours)
f. Establishment Contact Details
Name Name, Address E-Mail Address Telephone
Project Director, NHAI
The Project Director,National Highways Authority of India,Project Implementation Unit,H/o. Sh. S.N.Mishra, Ward No.10, Professor Colony, Dighee West,Darbhanga, Bihar - 846004
darbhanga@nhai.orgTel-Fax: 06272- 250194
Team Leader, IC
The Team Leader,M/s. Wilbur Smith Associates Inc in JV with Wilbur Smith Associates Pvt. Ltd., H/o. Sri Ram BahadurJha, Near SantinathMahadevMandir, Behat, P.O. Jhanjharpur, Dist. Madhubani,Bihar - 847403
moallemhossain1952@gmail.com
Tel-Fax: 06273-222166
Concessionaire/O&M Team
Kosi Bridge Infrastructure Co. Ltd., Majhari Camp, Majhari Village, Hariyahi Post, Via Nirmali, Dist. Supaul, Bihar – 847452
kbicl@gammoninfra.com
Tel: 703389416
4
Page 11 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
CHAPTER3: HIGHWAY MAINTENANCE MANAGEMENT
3.1 HIGHWAY INSPECTION DATA
The details of daily observations of the maintenance team and the major actions taken by the team for smooth and safe functionality of the project highway are tabulated and presented below.
Date Inspection and Major Maintenance work Details Action Taken
1-Oct-14Inspected the highway and made the following observationsBoulder crating at guide bund ch No 0.00 to 0.020
Completed
4-Oct-14Inspected the A1 A.B and made the following observations.Rain cut rectification work at main carriageway
Rectified
5-Oct-14Inspected the highway and made the following observationsFound toll plaza premises dusty.
Cleared
6-Oct-14Inspected the highway and made the following observationsClearing debris material at ch.154.160 in L.H.S
Cleared
7-Oct -14Inspected the highway and made the following observationsRain cut rectification in main carriageway @ Ch 150.185
Rectified
8-Oct -14 Inspected the highway and made the following observationsRectification work of damage apron @ Ch 0.080
Rectified
9-Oct -14Inspected the highway and made the following observationsBoulder receiving At Guide bund for Crating Work
Cleared
10-Oct-14 Inspected the highway and made the following observations. Boulder receiving At Guide bund for Crating Work
Received
11-Oct-14Inspected the highway and made the following observationsBoulder Crating Work @ Ch 1.190.
Rectified
12-Oct-14Inspected the highway and made the following observationsNylon Crating Work Of Damage Appron.
Rectified
15-Oct-14Inspected the highway and made the following observationsRectification Work Of Damage Appron @ Ch 1.200
Rectified
18-Oct-14Inspected the A2 G.B and made the following observationsRectification Of Damage Appron @ Ch 0.100
Rectified
19-Oct-14Inspected the highway and made the following observationsBoulder pitching disturbed at ch. 155.130 in L.H.S
Rectified
20-Oct-14Inspected the highway and made the following observationsRain cut Rectification work at Ch 154.180
Rectified
21-Oct-14Inspected the highway and made the following observationsRain cut Rectification work at Ch 154.180
Rectified
23-Oct-14Inspected the highway and made the following observations Boulder Pitching Work at Down Stream guide Bund
Completed
26-Oct-14 Inspected the A1 afflux bund and made the following observationsRain cut Rectification And Turfing work at 150.185
Rectified
27-Oct-14 Inspected the highway and made the following Completed
Page 12 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
observationsSoulder Dressing Afflux Country Side at Ch 5.400
28-Oct-14 Inspected the highway and made the following observationsRectification of Rain cut And Turfing at C h 158.630
Rectified
29-Oct-14 Inspected the highway and made the following observationsBoulder pitching work at Ch 0.800 A2 Gide Bund
Rectified
30-Oct-14Inspected the highway and made the following observationsNylon Crating Of Damage Appron At Ch 0.080
Rectified
1-Oct-14 to 30- Oct-14 Watering of plants in median and Avenue once a week
3.1.1. MAINTENANCE PHOTOGRAPHS
CLEANING WORK AT TOLL PLAZA AREA CLEANING OF MAIN BRIDGE
Page 13 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
MEDIAN CLEANING WORK MEDIAN CLEANING WORK
SAND BAG FILLING IN RAIN CUT RAIN CUT FILLING
Page 14 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
POT HALL REPAIRING AT M.C.W POT HALL REPAIRING AT M.C.W
CHAPTER 4: EMERGENCY ROUTE OPERATIONS
HIGHWAY ROUTE PATROL & INCIDENT MANAGEMENT VEHICLES
Page 15 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
4.1 USER SERVICES AND ACCIDENT DATA
Page 16 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
4.1.1. Ambulance Services
S. No Description Up to previous month
During this month
Cumulative till this month
1 No. of calls attended 6 0 6
2 No. of assistance provided 6 0 6
3 No. of injured persons rescued 10 0 10
4.1.2. Tow–away Crane Services
S. No Description Up to previous month
During this month
Cumulative till this month
1 No. of calls received 2 0 2
2 No. of Services Provided 2 0 2
4.1.3. Hydra Crane Services
S. No Description Up to previous month
During this month
Cumulative till this month
1 No. of calls received 6 1 7
2 No. of Services Provided 6 1 7
4.1.4. Fire Services
S. No Description Up to previous month
During this month
Cumulative till this month
1 No. of calls received 0 0 0
2 No. of Services Provided 0 0 0
4.1.5. Round the Clock Route Patrol Services
Page 17 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
S. No Description Up to previous month
During this month
Cumulative till this month
1 No. of incidents observed 147 22 169
2 No. of dead animals removed 28 3 31
3 No. of assistance provided 33 5 38
4 No. of incidents managed 166 30 196
Note: Nos. of Incidents managed included breakdown, illegal parking, wrong side driving, dead animals removal and law enforcement etc.
4.1.6. Incident Management Photographs
Page 18 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
Remove Accidental Vehicle Providing safety for breakdown vehicle
Assist driver to clear wrong side driving Provide safety for breakdown vehicle
Page 19 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
Dead Animal Removal
Debris Removal Assist to clear unauthorized Zone Parked vehicles
Page 20 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
4.1.7 Accident Statistics :
Name of PIU’s : National Highways Authority of India DARBHANGA
Stretch :Section of Muzaffarpur - Purnea [NH-57]
1) Stretch Chainage : KM.148+550 to KM. 159+1852) State : BIHAR3) District : SUPAUL4) Police Station :KISHANPUR & NIRMALI
Accident Data for the Month of October - 2014National Highway No. 57
S.No
DateTime
of Accident
A B C D E F G H
Vehicle Responsible
Fatal
Grievous Minor
Total Men
Injured
No. of Anima
l Killed if any
Help provided by Ambulance/Private vehicle
Accident Location
Nature of
Accident
Classification
of Accide
nt
Causes
Road Featur
es
Road Geometr
y
Intersection type of crossing
Weather conditio
n
114-10-
1402.45 PM
155.100 L.H.S
2 4 3 4 1 N/A 1Bolero
0 0 0 0 0 RPV/Hydra
CUMULATIVE STATEMENT: Calander Year 2014
SN TYPE OF ACCIDENT UP TO PREVIOUS MONTH DURING THIS MONTH UP TO THIS MONTH1
1 Fatal 0 0 0
2 Grievous Injury 4 0 4
3 Minor Injured 6 0 6
4 Non Injured 6 1 7
Page 21 of 22
Four Laning Bridge across River Kosi including its approaches & Guide Bund & Afflux Bund from Km. 148.550 to 159.185 on NH-57 in the State of Bihar
Total Accident Details for this month: FATAL=0, GREVIOUS =0 MINOR =0
a. Urban/Rural and Details of surrounding Land use.b. 1. Over turning. 2. Head on collision 3. Rear End collision 4. Collision Brush/Side Wipe. 5. Left Turn collision. 6. Skidding 7. Right Turn Collision 8.
Others (Pl. Specific )c. 1. Fatal. 2. Grievous Injury 3. Minor Injured. 4. Non-Injury.d. 1. Drunken, 2. Over speeding, 3. Vehicle out of control, 4. Fault of driver of motor vehicle/cyclist/pedestrian/passenger, 5. Defect in mechanical
condition of motor vehicle/road condition, 6. Wrong side, 7. Tyre burste. 1. Single lane, 2. Two lanes, 3.Three lanes or more without central divider (median), 4. Four lanes or more with central divider.f. 1. Straight road, 2. Slight Curve, 3. Curve, 4. Flat Road, 5. Gentle incline, 6. Steep incline, 7. Hump, 8. Dipg. 1. T-junction, 2. Y-junction, 3. Four arm junction, 4. Staggered junction, 5. Junction with more than 4 arms, 6. Round about junction, 7. Manned Rail
crossing. 9. Unmanned Rail crossingh. 1. Fine, 2. Mist/Fog, 3. Cloudy, 4-Light rain, 5. Heavy rain, 6. Hail/sleet, 7. Snow, 8. Strong Wind, 9. Dust Storm, 10. Very Hot, 11. Very Cold, 12.
Other extraordinary weather condition.
Note A: Causes of Accidents:1) Vehicle out of control, 2) Rain, 3) Tyre burst, 4) Drunken driving, 5) Over speeding vehicle, 6) Mechanical defect, 7) Electrical defect, 8) Poor visibility (fog/dust), 9) Wrong side driving, 10) Others (specify)
Note B: Fatal means death casualty.
Page 22 of 22