fish screening and guidance at water...
Post on 06-Mar-2018
214 Views
Preview:
TRANSCRIPT
9/3/2010
1
Fish Screening and Guidance at Water DiversionsL S P E
1
FSOC Fish Passage Class
September 13 -16, 2010
Yakima, WA
Larry Swenson, P.E.
Hydraulic Engineer, NOAA Fisheries
The “Design” Fish
Pacific Salmon and Steelhead
Downstream-migrating salmonids
2
9/3/2010
2
Chinook Fry
Objectives
1. Hazards for fish2 Biological basis of design
Practical Knowledge of:
2. Biological basis of design3. Educate participants in
project4. Data requirements5. Apply design data6. Screen types7. Screen materials8. Perform calculations9. Draw conceptual layouts10. Expedite permit review
process 4
9/3/2010
3
Topics
1. The Typical Water Diversion
2. Swimming Capabilities of Juvenile Salmonids
3. Behavior of Juvenile Salmonids
4. Basic Methods of Guiding Juvenile Salmonids
5. Placeholder – Not Used
6. Facility Planning – Data Requirements
7. Design Objectives
5
Topics - continued
8. Selecting the Screen Structure Site
9. Facility Design
Criteria
Velocity
S M t i lScreen Materials
10. Types of Screen Facilities
11. Debris
12. Screen Velocity - Balancing
6
9/3/2010
4
Topic 1. – Generic Water Diversion
7
On-Channel Screens
8
9/3/2010
5
Topic 2. Swimming Capability of Juvenile Capability of Juvenile Fish
University of Washington Fisheries Research Institute study (Smith and Carpenter, 1987) was used to develop fishCarpenter, 1987) was used to develop fish screen criteria
USFWS Bull Trout studies
9
Factors Related to Swimming Capability
Approach velocity, sweeping velocity, and canal velocity
Water Temperature
Fish SizeFish Size
Swimming Time Duration
Dissolved Oxygen Level
10
9/3/2010
6
Swimming Speeds Classification
Cruising
Speed
Sustained
Speed
Darting
Speed
Use MigrationAvoid
Obstacles
Escape
PredatorsObstacles Predators
Duration Hours Minutes Seconds
11
Juvenile Fish Swimming Speeds
12
9/3/2010
7
Effect of Temperature on Cruising Velocity
13
Effect of Temperature on Critical Velocity
14
9/3/2010
8
Effect of Fish Size on Critical Velocity
15
Topic 3. Behavior of Juvenile Topic 3. Behavior of Juvenile Salmonids
Physiology and Migration
Design issues
Dams and Water Diversions
R i P t b lReservoir Passage - turbulence
Guidance in dam forebays
Routes
16
9/3/2010
9
Behavior of Juvenile Fish-contd.
Reluctance to enter small bypasses
Preference for day or night migration past screen structures
Migration corridors in lakes (shoreline?
contd.
g (deep?)
Lateral line function
Dissolved Oxygen Level
17
PhysiologySmolt characteristics compared with parr
Body silvering (+)
Salinity tolerance (+)
Growth rate (+)
Weight per unit length (-)
Body total lipid content (+)
Blood glucose (+)
Gill microsome, Na, K, ATPase enzyme activity (+)
18
9/3/2010
10
Migration Timing and Fish Size
19
Migration Timing and Fish Size
70
mm
)
sand
s)
50
60 A70
mm
)
sand
s)
50
60 A
70
60
50
40
30
20
50
60
Ave
rage
fork
leng
th o
f mig
rant
s (m
of m
igra
ting
fry
and
sm
olts
(th
ous
30
10
0
20
40
0
20
16
12
BTemporal Pattern of Fry andSub-Yearling Smolts in TwoRivers on Vancouver Island
CHINOOK RUN TIMING
70
60
50
40
30
20
50
60
Ave
rage
fork
leng
th o
f mig
rant
s (m
of m
igra
ting
fry
and
sm
olts
(th
ous
30
10
0
20
40
0
20
16
12
BTemporal Pattern of Fry andSub-Yearling Smolts in TwoRivers on Vancouver Island
CHINOOK RUN TIMING
10 20 2010 2010 2010
40
30
20
A
Num
bers
o
8
4
0
March April May June
A - Cowichan River - 1967B - Nanaimo River - 1980
Source: Groot and Margolis 199110 20 2010 2010 2010
40
30
20
A
Num
bers
o
8
4
0
March April May June
A - Cowichan River - 1967B - Nanaimo River - 1980
Source: Groot and Margolis 1991
20
9/3/2010
11
Effect of River Flows
21
Effect of River Flows
22
9/3/2010
12
Topic 4. Basic Methods of Guiding Juvenile Salmonids
A. Physical Barriers—1. Fish screen or rack to prevent fish entry into
diversion
—2. Preferred screen design - guide fish to bypass without contacting screen
B. Behavioral Devices
23
Vertical and Non-Vertical Fixed-Plate S
Examples of Physical Barriers
Screens
Traveling Screens
Cylindrical Screens—Rotating Drum Screens
—Fixed Cylindrical Screen
Eicher Screens and Modular Inclined Screens
Pump Intake Screens
24
9/3/2010
13
Examples of Behavioral Devices
Sound
Light
Electric Fields
H d li A iHydraulic Action
25
Topic 5. Prioritizing Screen Projects
Number of fish entrained
Existing level of protection
Funding
ESA
Land ownership
Proximity to other projects
Frequency of diversion
T f di iType of diversion
26
9/3/2010
14
Topic 6. Facility Planning - Data Requirements
See Site Survey Form in Notebook
27
Topic 7. Design Objectives
Guide Fish Past Screens:Guide Fish Past Screens:
—Without contacting screen - impingement
—Without entrainment through seals, mesh, other gaps
—Without delay - guidance—Without delay - guidance
—Without injury or mortality
—Minimizing stress to fish
—Minimizing predation
28
9/3/2010
15
Topic 8. Selecting the Screen Structure Site
Minimizing delayO&MO&MOn-River siteOff-River siteHydraulics, HydrologyHeadBank characteristicsData Collection See NotebookData Collection – See Notebook
29
Off-Channel Diversion
30
9/3/2010
16
On-Channel Diversion
31
Channel Configuration –Approach Flow Conditions
32
9/3/2010
17
Other Site Considerations
Diversion Canal as Fish Habitat
Diversion Operations – Pitfalls
Starting and Stopping of Diversions
33
Topic 9. Facility Design
A. Recommend references included in Notebook
B. Design Features—Flow-Screen Angle
—Uniform Approach VelocityUniform Approach Velocity
—Channel Configuration
—Trashracks
—Seals
—Cleaning System34
9/3/2010
18
Facility Design - Velocity
Sweeping Component of Velocity—45 degrees or less between flow and screen
—Smaller angles provide higher sweep component
—Fish move towards bypass by swimming and by sweeping componentby sweeping component
35
Discharge, Q, calculations
LJ S
NOAA Fisheries
4-28-03
36
9/3/2010
19
37
38
9/3/2010
20
Velocity Components
39
Velocity Components
OV canalV=Osin= VcanalaV s cos
Canal
OV canalV=Osin= VcanalaV s cos
Canal
VV
V
V
V
Vsa
a
canal canal O
O
Canal
VV
V
V
V
Vsa
a
canal canal O
O
Canal
Vs
Screen
Vs
Screen
40
9/3/2010
21
•Fish Orientation in Front of Screens
41
NOAA Fisheries Velocity Criteria(Northwest Region)
S l id F
Va < 0.4 fps
Vs > Va
Uniform Flow Distribution
(S L h)/(V ) 60 d
Salmonid Fry
(Screen Length)/(Vs) < 60 seconds
42
9/3/2010
22
Screen Materials Criteria
NOAA Fisheries Screen Criteria included in Notebook
43
Screen Materials
44
9/3/2010
23
Screen Materials
45
Profile Bar
46
9/3/2010
24
Profile Bar
47
Vee-Wire Profile Bar - Criteria
Salmonid FrySa o d y
Maximum Bar Spacing = 1.75 mm
48
9/3/2010
25
Woven Wire
49
Woven Wire
50
9/3/2010
26
Woven Wire Fabric - Criteria
Salmonid FrySalmonid Fry
Max. Mesh Opening = 3/32 inch (2.38 mm)
Minimum Porosity = 27% Open AreaMinimum Porosity 27% Open Area
51
Perforated Plate
52
9/3/2010
27
Perforated Plate - Criteria
Salmonid FrySalmonid Fry
Maximum Opening = 3/32 inch (2.38 mm)
Minimum Porosity = 27% Open AreaMinimum Porosity 27% Open Area
53
Other Materials - Intralox
54
9/3/2010
28
Topic 10. Types of Positive Barrier Screens
Rotary Drum
Fixed Vertical Plate
Vertical Traveling belt and panelVertical Traveling – belt and panel
Non-Vertical Fixed Plate
Horizontal Fixed Plate
Eicher Screen
Modular Inclined Screens
End-Of-Pipe (Pump) Intake ScreensEnd Of Pipe (Pump) Intake Screens
55
Rotating Drum Screens
56
9/3/2010
29
Rotary Drum Screens
57
Rotating Drum Screens
58
9/3/2010
30
Rotating Drum Screens
59
Seals
60
9/3/2010
31
Seals
61
9/3/2010
32
Rotating Drum Screens Rotating Drum Screens -Advantages
Proven fish protection
Self-cleaning by rotation
Passes debris downstreamPasses debris downstream
63
Rotating Drum Screens -Disadvantages
Susceptible to direct hits from large debris
Large civil works are required.
Seals require much maintanance.
Susceptible to abrasions by sand -p ymesh requires periodic replacement.
64
9/3/2010
33
Vertical Fixed Plate Screens
65
Vertical Fixed PlateScreens
66
9/3/2010
34
Vertical Fixed Plate Screens
67
Vertical Fixed Plate Screens
68
9/3/2010
35
Vertical Fixed Plate Screens
69
Vertical Fixed Plate Screens - Advantages
Easy to seal
Mechanically simple
Can be installed on river’s edge - small screens—No bypass required
—Can use profile wire (very strong)
Mechanical/brush cleaning usually effective
Air burst cleaning system is on back side of screen.
Cleaning is started by timer or head loss.70
9/3/2010
36
Vertical Fixed Plate Screens - Disadvantages
Must be cleaned mechanically
Large bypass flows required
Brush arms can be damaged by large debris.
Circular air burst cleaners do not clean tientire screen.
71
Vertical Traveling Screens
72
9/3/2010
37
Traveling Screens
73
Traveling Screens
74
9/3/2010
38
Traveling Screens
75
Traveling Screens
76
9/3/2010
39
Traveling Screens - Advantages
Small screens can be installed on river.
Compact civil works
Self cleaned by rotation
Jet sprays provide additional p y pcleaning.
77
Traveling Screens -Disadvantages
Mechanically complex
Seals can be a problem.
Make sure meets all NMFS criteria.
78
9/3/2010
40
Non-Vertical Fixed Plate Screen
79
Non-Vertical Fixed Plate Screen
80
9/3/2010
41
Non-Vertical Fixed Plate Screens
81
Non-Vertical Fixed Plate Screens
82
9/3/2010
42
Non-Vertical Fixed Plate Screens
83
Non-Vertical Flat Plate Screens
84
9/3/2010
43
Non-Vertical Fixed Plate Screens
85
Non-Vertical Fixed Plate Screens
86
9/3/2010
44
Non-Vertical Fixed Plate Screens - Advantages
No moving partsNo moving parts
No bypass required if built in-river
87
Non-Vertical Fixed Plate Screens - Disadvantages
Self-cleaning may not be reliable
Risk of injury on screen during low flow
Must raise water surface
Tricky, unreliable flow rate controly,
Adult concerns
88
9/3/2010
45
Eicher Screens and Modular Inclined Screens
89
End-Of-Pipe Screens
90
9/3/2010
46
Fixed Cylinder Screens
Source: Johnson Screens, Inc..
91
Pump Screens (Active)
92
9/3/2010
47
Pump Screens(Active)
93
Pump Screens (Active)
94
9/3/2010
48
Fixed Cylindrical Screens -Advantages
Good option for deep intakes
Air burst cleaning system can be made to be effective
Some off-the-shelf models with water backwash systems meet NMFS criteria for active screens.
95
Fixed Cylindrical Screens -Disadvantages
Out of sight, out of mind
Need current to transport debris from screen site.
Air burst systems on large installations don’t always clean entire screen -especially the bottom.
Long, stringy vegetation is a problem on small pump screens.
96
9/3/2010
49
Pump Screens
97
Pump Screens
98
9/3/2010
50
Pump Screens
99
Pump Screens
100
9/3/2010
51
Passive Screens
101
Passive Screens
102
9/3/2010
52
Passive Screens
103
Passive Screens
104
9/3/2010
53
Passive Screens
105
Passive Screens
106
9/3/2010
54
Passive Screens
107
Passive Screens
108
9/3/2010
55
Passive Screens
109
11. Debris Management
Trashracks
Screen Cleaning Systems
110
9/3/2010
56
Trash racks - Criteria
“Open channel intakes shall include a trashOpen channel intakes shall include a trash rack which shall be kept free of debris.”
“In certain cases, a satisfactory profile bar screen can substitute for a trash rack.”
Comment - No trashrack would be rare situation - such as an on-river screen.
111
Trashracks
112
9/3/2010
57
Trashracks
113
Trashracks
114
9/3/2010
58
Cleaning System
115
Cleaning System
116
9/3/2010
59
Cleaning Systems - Criteria
Screens shall have automatic cleaningScreens shall have automatic cleaning system.
Effective, reliable, proven, approved by NMFS
Head differential to initiate cleaning = 0.1 ft
117
Cleaning System - ?
118
9/3/2010
60
Cleaning System - ?
119
Cleaning System
120
9/3/2010
61
Cleaning System
121
Cleaning System
122
9/3/2010
62
Cleaning System
123
Cleaning System
124
9/3/2010
63
Cleaning System
125
Cleaning System
126
9/3/2010
64
Cleaning System
127
12. Balancing Screen Velocities
Flat Plate ScreensFlat Plate Screens
Rotary Drum Screens
Cylindrical Screens
Case Study
128
9/3/2010
65
Approach Flow Conditions
129
Approach Flow Conditions
130
9/3/2010
66
Channel Configuration – Hydraulic Modeling
131
Channel Configuration – Hydraulic Modeling
132
9/3/2010
67
Channel Configuration –Approach Flow Conditions
133
Balancing Screen Velocities
134
9/3/2010
68
Balancing Screen Velocities
135
Uniform Approach Velocity
136
9/3/2010
69
Uniform Approach Velocity
137
Balancing Rotary Drum Screens
138
9/3/2010
70
Cylindrical Screen Without Internal Baffles
139
Cylindrical Screen With Internal Baffles
140
9/3/2010
71
Useful Link
Link to “Anadromous Salmonid Facility Design” document:
http://www.nwr.noaa.gov/Publications/Reference-Documents/Passage-Refs.cfm
141
Recent Innovative Projects
Rocky Reach Dam – Chelan Co. PUD - Columbia River, WA
Upper Baker Dam – Puget Sound Energy - Baker River, WA
Round Butte Dam – Portland General Electric –Deschutes River ORDeschutes River, OR
142
9/3/2010
72
Rocky Reach Dam
143
Rocky Reach Dam
144
9/3/2010
73
Upper Baker Lake
145
Upper Baker Lake
146
9/3/2010
74
Upper Baker Lake
147
Upper Baker Lake
148
9/3/2010
75
Upper Baker Lake
149
Upper Baker Lake
150
9/3/2010
76
Upper Baker Lake
151
Upper Baker Lake
152
9/3/2010
77
Upper Baker Lake
153
Upper Baker Lake
154
9/3/2010
78
Upper Baker Lake
155
Round Butte Dam
156
9/3/2010
79
Round Butte Dam
157
Round Butte Dam
158
9/3/2010
80
Supplemental Screen Slides
159
Rocky Reach Dam
160
9/3/2010
81
Rocky Reach
161
Rocky Reach
162
9/3/2010
82
Rocky Reach
163
Rocky Reach
164
9/3/2010
83
Howard Hanson
165
Howard Hanson
166
9/3/2010
84
167
Howard Hanson
168
9/3/2010
85
Howard Hanson
169
Entrance Horn / Fish Screen / Bypass ConduitLooking D/S
Fish Pathway
(Representative)
9/3/2010
86
171
Turbine Intake Screens
172
Screen
9/3/2010
87
TurbineIntakeScreens
Screen
Model
173
Turbine Intake Screens
174
9/3/2010
88
Turbine Intake Screens
175
Turbine Intake Screens
176
9/3/2010
89
Turbine Intake Screens
177
Thank-you
178
top related