Project Management & Social Responsibility Assignment 5 - Organizing a Project

Matt Heywood Isaac Golumbia

Blake Elliott

Figure 1 - Spider Diagram

Figure 2 - Product Sketch 2a - Front View

A - Infrared Sensor B - Strain Gauge C - Bar D - Telescope E - Mounting system F - Grips G - Arduino

2b - Side View

A - Screws B - Infrared Sensor C - Wall Plate D - Bar Holder E - Hinge F - Locking Mechanism G - Lock H - Padded support I - Bar H - Arduino

Figure 3 - Worried Areas 3a - Assemble Chin-up Bar

3b - Software

3c - Manufacturing

Figure 4 – Packaging

Meng 293

Period Highlight: # Plan Actual % Complete Actual (beyond plan) % Complete (beyond plan)

PERCENT

ACTIVITY COMPLETEPERIODS (Days)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

A - Pricing / Budget

B - Design

C - Order / Acquire Matericals

D - Produce Drawings

E - Produce Cirucit Schamatics

F - User Manual

G - Print Paperwork

H - Write Arduino Code

I - Make circuits (test)

J - Bar Manufacturing

K - Produce Mounting System

L - Final Assembaly

M - Product Testing

N - Assemble Packaging

O - Package Product

P - Shipping

Assignment 5 -

Gantt Chart 1, just

the tasks.

Meng 293

Period Highlight: # Plan Actual % Complete Actual (beyond plan) % Complete (beyond plan)

ACTIVITY DURATIONCOMPLETEPERIODS (Days)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

A - Pricing/Budget

B - Design

C - Order / Acquire Matericals

D - Produce Drawings

E - Produce Cirucit Schamatics

F - User Manual

G - Print Paperwork

H - Write Arduino Code

I - Make circuits (test)

J - Bar Manufacturing

K - Produce Mounting System

L - Final Assembaly

M - Product Testing

N - Assemble Packaging

O - Package Product

P - Shipping

--- Either Team

Assignment 5 - Gantt

Chart 1.5, job

assignments.

Paperwork Team

Design / Manufactuing Team

Meng 293

Period Highlight: # Plan Actual % Complete Actual (beyond plan) % Complete (beyond plan)

PERCENT

ACTIVITY COMPLETEPERIODS (Days)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

A - Pricing/Budget

B - Design

C - Order / Acquire Matericals

D - Produce Drawings

E - Produce Cirucit Schamatics

F - User Manual

G - Print Paperwork

H - Write Arduino Code

I - Make circuits (test)

J - Bar Manufacturing

K - Produce Mounting System

L - Final Assembaly

M - Product Testing

N - Assemble Packaging

O - Package Product

P - Shipping

--- Either Team

Assignment 5 -

Gantt Chart 2, Real

Plan.

Paperwork Team

Design / Manufactuing Team

MENG 293 – Assignment 5 – Network Diagram

Start

N 38 39

1 38 39

O 39 40

1 39 40

END P 40 41

1 40 41

M 33 38

5 33 38

D 5 15

10 6 16 E 15 17

2 16 18

F 17 21

4 18 22

L 28 33

5 28 33

C 5 10

5 5 10

H 5 10

5 5 10

I 10 18

8 10 18

G 21 22

1 22 23

K 22 27

5 23 28

J 18 28

10 18 28

B 0 5

5 0 5

A 0 1

1 4 5

Slack: 1 Slack: 1

Slack: 1 Slack: 1

Slack: 1

Slack: 4

Task Price NOTESPurchase Bar 50 1" stainless tube (0.083" wall thickness, 6' length)Purchase Grips 5 Amazon.caPurchase Strain Gauge 100 Micro-Measurements MMF003129Purchase Motion Sensor 20 Parallax Inc. 910-28027

Purchase Mounting System Materials 208 fastners (wall to plate), sheet metal for fastning device, latch and hinge (with two small fastners)

Purchase Arduino Uno 40 Amazon.caPurchase Electronic Hardware 20 Wires, resistors, switches/relays, etc.Paperwork Printing 15 Monk OfficeShipping of Materials 65 -Purchase Packaging Materials 10 UPS Victoria

Total Price (Materials) 345

Task Time (hours) Price ($) NOTESPricing and Budgeting 8 320 One full day of work (2 people)Bar Design 50 2000 Five full days of analysis and design (2 people)Order and Acquire Materials 6 240 Pick up materials around town and order others from the internet (2 people)Produce Drawings 100 4000 Ten full days of work (2 people)Produce Circuit Schematics 16 640 Two days of work (2 people)Produce User Manual 38 1520 Four days of work (2 people)Print Paperwork 1 40 One hour for driving to print shop and back (2 people)Write/Test Arduino Code 50 2000 Five full days of work (2 people)Test/Build Circuits 70 2800 Seven full days of work (2 people)Manufacture Bar 100 4000 Ten full days of work (2 people)Manufacture Mounting System 55 2200 Six days of work (2 people)Final Assembly 48 3840 Five days of work (4 people)Test Product 46 3680 Five days of work (4 people)Package Product 5 400 One day of work (4 people)

Ship - - No work required. Price is dependant on location of shipment

Total Price (Labour) 27680

GRAND TOTAL ($) 28025