factory profile 1 · 2020. 11. 3. · dyeing , washing finishing, spinning 1080 30 t/day on-site...

Post on 26-Mar-2021

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

CASE

STU

DY

SEPTEMBER2019

NOVEMBER2019

1 | CHEMICAL MANAGEMENT

2 | CHEMICAL STORAGE

3 | CHEMICAL HANDLING

4 | CHEMICAL DISPOSAL

OVERALLPERFORMANCEThe factory was visited twice in 2019.

Immense improvement were shown in chemical management and disposal. The employment of a chemical manager and building an effluent treatment plant is a huge step towards zero discharge of hazardous chemicals.

The waste water is now treated by the newly built effluent treatment plant in order to reduce the discharge of hazardous chemicals.

CHEMICAL MANAGEMENT

ü

Improved storage area by labeling the chemicals correctly and storing them safely to reduce the workers’ risk.

ü

IMPROVEMENTS

FACTORY PROFILE

LOCATION

PRODUCTION PROCESS

NUMBER OF WORKERS

PRODUCTION VOLUME

WASTE WATER TREATMENT PLANT

Karachi, Pakistan

Dyeing, Washing, Finishing, Spinning

1080

30 t/day

On-site only

Hi, I am the director of a textile factory in Pakistan. We have invested about

500,000 dollars in low liquor dyeing machines as well as in an effluent treatment plant which will process all water which is

generated from our dyeing facility.

2020 © Systain

top related