Mattias SkarinKanban / Lean coach

www.crisp.se

Exploring kanban optionsas a Scrum Team

March 3, 2011

mattias.skarin@crisp.se0733668808

2

Kanban

Signaling system

Visual

Limited in supply

Henrik Kniberg

2

看板”Visual Card”

3

The Kanban Formula

2011-03-05

Mattias Skarin 3

Y = [D (Tw+Tp) (1+a)] / AY = [D (Tw+Tp) ] / AY = [D (Tw+Tp) (1+a)] / A

Source: Kaneyoshi Kusunoki

4

Kanban in SW development

Backlog Dev Done

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

cteturorem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

UAT Deploy5 3 2 3

FLOW Avg lead time: days 12

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

Visualize the workflow

Limit WIP (work in progress)

Measure & optimize flow

Use explicit policies (definition of Done, WIP limits, etc)

Pioneered byDavid Anderson

in 2004

• SOLID • Happy day • DoD!

5

A view on scrum

2011-03-05

Mattias Skarin 5

Flow

Cooperation modelContinuous improvement

Prioritize

.. we can choose to apply a standardized or optimized solution to our problem

6

Scrum cadences

2011-03-05

Mattias Skarin 6

Sprint Sprint

Release

Plan

Retro

7

Kanban cadences

2011-03-05

Mattias Skarin 7

Plan

Release

Kanban Dev Test Build Done!BL

Improve

8

More prescriptive More adaptive

Process tools

Henrik Kniberg

8

XP(13)

Scrum(9)

Kanban(4)

Do Whatever(0)

RUP(120+)

• Architecture Reviewer• Business Designer

• Business-Model Reviewer• Business-Process Analyst

• Capsule Designer• Change Control Manager

• Code Reviewer• Configuration Manager

• Course Developer• Database Designer

• Deployment Manager• Design Reviewer

• Designer• Graphic Artist• Implementer• Integrator

• Process Engineer• Project Manager• Project Reviewer

• Requirements Reviewer• Requirements Specifier

• Software Architect• Stakeholder

• System Administrator• System Analyst• Technical Writer

• Test Analyst• Test Designer• Test Manager

• Tester• Tool Specialist

• User-Interface Designer• Architectural analysis

• Assess Viability of architectural proof-of-concept

• Capsule design• Class design

• Construct architectural proof-of-concept

• Database design• Describe distribution

• Describe the run-time architecture• Design test packages and classes

• Develop design guidelines• Develop programming guidelines

• Identify design elements• Identify design mechanisms• Incorporate design elements

• Prioritize use cases• Review the architecture

• Review the design• Structure the implementation

model• Subsystem design• Use-case analysis• Use-case design• Analysis model

• Architectural proof-of-concept• Bill of materials

• Business architecture document• Business case

• Business glossary• Business modeling guidelines

• Business object model• Business rules

• Business use case

• Whole team• Coding standard

• TDD• Collective ownership

• Customer tests• Pair programming

• Refactoring• Planning game

• Continuous integration• Simple design

• Sustainable pace• Metaphor

• Small releases

• Scrum Master• Product Owner

• Team• Sprint planning meeting

• Daily Scrum• Sprint review

• Product backlogt• Sprint backlog

• BUrndown chart

• Visualize the workflow• Limit WIP

• Measure and optimize flow• Use explicit polices

Miyamoto Musashi17th century samurai

Do not develop an attachmentto any one weapon

or any one school of fighting

• Business use case realization• Business use-case model

• Business vision• Change request

• Configuration audit findings• Configuration management plan

• Data model• Deployment model• Deployment plan• Design guidelines

• Design model• Development case

• Development-organization assessment

• End-user support mateirla• Glossary

• Implementation model• Installation artifacts

• Integration build plan• Issues list

• Iteration assessment• Iteration plan

• Manual styleguide• Programming guidelines• Quality assurance plan• Reference architecture

• Release notes• Requirements attributes

• Requirementsmanagement plan

• Review record• Risk list

• Risk management plan• Software architecture

document• Software development

plan• Software requirements

specification• Stakeholder requests• Status assessment

• Supplementary business specification

• Supplementary specification• Target organization assessment

• Test automation architecture• Test cases

• Test environment configuration• Test evaluation summary

• Test guidelines• Test ideas list

• Test interface specification• Test plan• Test suite

• Tool guidelines• Training materials• Use case model

• Use case package• Use-case modeling guidelines

• Use-case realization• Use-case storyboard

• User-interface guidelines• User-interface prototype

• Vision• Work order

• Workload analysis model

Henrik Kniberg, 2009

10

Let’s take a walk..

2011-03-05

Mattias Skarin 10

Product backlog

Sprint planning

Sprint Demo Retrospective

Product Owner

Team

11

PRODUCT BACKLOG

The art of delivering value, without being sure

2011-03-05

Mattias Skarin 11

12

Q: Should these patients share the same queue?

2011-03-05

Mattias Skarin 12

13

Option: Study your demand

2011-03-05

Mattias Skarin 13

Cool Feature $$$

Infrastructure upgrade

Annoying customer bug

Legislation committment

Product Backlog

Unfinished from last sprint

14

Studying demand in a real team

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Sprint 1 Sprint 2 Sprint 3 Sprint 4 Sprint 5 Sprint 6 Sprint 7

Value demand

Failure Demand

Average 28 %

2011-03-05

Mattias Skarin 14

15

Option: Optimize on system level

2011-03-05

Mattias Skarin 15

Analysis DevelopmentDesign Test

Flow, D. Reinertsen, 2008

Let’s do Scrumhere

17

Option: Agree on a portfolio strategy for a sustainable pace

2011-03-05

Mattias Skarin 17

Feature

Infrastructure

Customer bugReady for dev

Sprint #1 Sprint #3 Sprint #3

Smooth pace

WIP = 1/sprint. Do when arrive

WIP = Fill up to the WIP limit using me

WIP = 0,5/sprint. A little at a time, continuously

18

Option: Decentralize decision making

2011-03-05

Mattias Skarin 18

Ready for dev

Backlog In Dev Done

Support

Team

Key stakeholder

Product Owner

Pheew.. Less detailsfor me to worry about

19

Option: Limit your queues

2011-03-05

Mattias Skarin 19

Late start advantage!

Company A

Company B

20

PLANNING

2011-03-05

Mattias Skarin 20

21

Respecting WIP, but in different ways

Henrik Kniberg

21

Sprint 1 Sprint 2 Sprint 3 Sprint 4

Long running task

Long running task

Scrum

Kanban

WIP limit = 3

4

2 1 4

Velocity = 11

22

Option: Learn your cycle time to know when you can ship

2011-03-05

Mattias Skarin 22

Backlog Dev Done

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

cteturorem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

UAT Deploy3 2 3

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

Free slot

Cycle time

23

Option: Lightweight estimation

23

SM L

Hours?Days?

Weeks?

S M L

T-shirt sizing SLA – service level agreement

Example: SLA is 12 days• Can we do this item within 12 days?

• If yes: just pull it in.• If no: reject it, or break it down, or

estimate/negotiate

24

Option: Higher predictability, on what really matters

2011-03-05

Mattias Skarin 24

Story

Story

Story

Story

Story

Story

Story

Story

Story

Story

Story

Story Story

Story

Story

Story

Story

Story

Time

Throughput / Velocity

”High”

”Medium”

”Low”

Predictability

We have a large coordinationcost

No estimation,only continuous

delivery

25

Big project effect

2011-03-05

Mattias Skarin 25

26

Illusion: Invested sum != money lost

Mattias Skarin 26

$

Project A Project B

Project Bt + 1

Project At + 1

Product backlog

Project A

Project B

Cost of delay

$ 1000

$ 9000

32

Be careful with scheduling systems

2011-03-05

Mattias Skarin 32

Time is up!Sprint

Debt

Debt

Debt

Time is up!Time is up!

33

Option: Release when ready, frequently

2011-03-05

Mattias Skarin 33

Release train

Is it good? Is it good? Is it good?

A

35

IN SPRINT

2011-03-05

Mattias Skarin 35

36

What does your sprint burndown look like?

2011-03-05

Mattias Skarin 36

A B

37

Option: Try out WIP limits

2011-03-05

Mattias Skarin 37

To do In Work Done

orem ipsum dolor sit amet, co nse

ctetur

[3]

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

Sun

Rob

Jane + Bob

Sprint burndown

38

Option: Daily standup: Flow over activity

2011-03-05

Mattias Skarin 38

Backlog Dev Done

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

cteturorem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

UAT Deploy5 3 2 3

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor

sit amet, co nse ctetur

orem ipsum dolor sit amet, co nse

ctetur

Team

• 1. [Point at story]• 2. Anything blocking our flow?• 3. Act

39

TEAMWORK

2011-03-05

Mattias Skarin 39

40

Kanban allows both specialists & generalists

Henrik Kniberg

40

Backlog Design

orem ipsum dolor sit amet, co nse

ctetur

Fold Tape

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

Trim Draw

3 2 2 1 4 3

orem ipsum dolor sit amet, co nse

cteturorem ipsum dolor sit amet, co nse

ctetur

41

Option: Start using existing roles

2011-03-05

Mattias Skarin 41

Analyze Design Code Done!Req

Architect

Project manager

Manager

Business Analyst

Product owner

Scrum

Scrum Master

Kanban

42

Option: Expand team concept

Mattias Skarin

42

Concept To Do

orem ipsum dolor sit amet, co nse

ctetur

In Dev Test

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

orem ipsum dolor sit amet, co nse

ctetur

Done Deploy3 2 2 1 4 3

orem ipsum dolor sit amet, co nse

cteturorem ipsum dolor sit amet, co nse

ctetur

I now see what’s coming!

We can nowdemo what is blocking

flow

Scrum Team

Sysadmin

Customerfacing

We can track ourideas!

Sprint After sprintBefore sprint

43

RETROSPECTIVES

Options to

2011-03-05

Mattias Skarin 43

44

How many residents live here?

2011-03-05

Mattias Skarin 44

45

..and how many live here?

2011-03-05

Mattias Skarin 45

46

It is important to understand the problem

2011-03-05

Mattias Skarin 46

47

Option: Visualize the problem

2011-03-05

Mattias Skarin 47

Team A

Team B

Add training• Stop half finished work

48

Option: Quantify the problem

2011-03-05

Mattias Skarin 48

0

5

10

15

20

25

30

35

40

45

50

Where could production issues have been caught?

49

Lookback: The Kanban Formula

2011-03-05

Mattias Skarin 49

?

50

Every tool needs...

Mattias Skarin 50

Direction

A purpose

Are you using the tool or is it using you?

52

Expand your toolkit!www.crisp.se/utbildning

Mattias Skarin

Kanban Training for managers June 2-3

David Anderson

Second Generation Lean- Learn the economics

May 12-13

Don Reinertsen

Kanban starting points on the web:http://www.crisp.se/kanban

http://www.limitedwipsociety.com

Leading Lean Software DevelopmentMay 19-20