McKenney’s equipped a central plant and piped utilities to production lines for a food
packaging manufacturer moving into a larger facility.
THE CHALLENGEIn a very short timeframe, the McKenney’s team had to build out the central plant and get every manufacturing line machine connected at the customer’s new packaging
plant. There was no time for pipe prefabrica-tion at the McKenney’s corporate campus, and there were no drawings linking utilities to production line machines being moved from the customer’s old facility.
THE SOLUTIONTo expedite the work, McKenney’s set up a fabrication shop on-site and drew spool sheets in the job trailer. To connect each machine, the foreman and project manager
visited the old facility several times to deter-mine the utility needs for each production line.
THE RESULTSThe project was completed on time and under budget—exceeding the customer’s expectations. Pleased with the outcome, the owner decided to continue the relation- ship with McKenney’s on future projects.
Expediting a Smooth MovePROJECT NAME
� Foodservice Packaging Manufacturer
PROJECT LOCATION
� Norcross, Georgia
PROJECT TEAM
� Owner: Manufacturer
� General Contractor: The Conlan Company
� Architect: Fowler Design Associates, Inc.
� Engineer: AHA Consulting Engineers
� Mechanical Contractor: McKenney’s, Inc.
SPECIALIZATIONS
Design Assist
Pipe Shop Prefab
MARKETS
� Industrial
� Central Plants
The content of this document is not intended as an endorsement.
www.mckenneys.com© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316
704-357-1200 info@mckenneys.com
3601 Performance Road Charlotte, North Carolina 28214
top related