evergreen trails master plan december 10 open house boards

Post on 07-Aug-2015

28 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

  1. 1. Downtown ConnectionsDowntown Connections Downtown Area Connections Downtown Bulbouts
  2. 2. Downtown ConnectionsDowntown Connections CR 73 Trail River Trail
  3. 3. North AreaNorth Area Meadow Drive Trail and Bike Lanes Evergreen Parkway Pedestrian Crossing
  4. 4. North AreaNorth Area Upper Bear Creak Improvements Potential Parking Area and Site Improvements North Lake Trail Modifications
  5. 5. South AreaSouth Area Evergreen Lake Linkages Trail Education and Recreation (E.A.R.) Trail Recreation Education and Library (R.E.A.L.) TrailBuffalo Park Road Shared Use Path
  6. 6. Guide & Wayfinding SignageGuide & Wayfinding Signage

top related