TRANSCRIPT

Western Washington UniversityWestern CEDAR

Huxley College Graduate and UndergraduatePublications Huxley College of the Environment

Fall 2016

Environmental impact assessment Fever Creekbridge replacementAnalissa MerrillWestern Washington University

Gus LandefeldWestern Washington University

Kyle EastonWestern Washington University

Shiloh BrittWestern Washington University

Novella RandallWestern Washington University

Follow this and additional works at: https://cedar.wwu.edu/huxley_stupubs

Part of the Environmental Studies Commons

This Environmental Impact Assessment is brought to you for free and open access by the Huxley College of the Environment at Western CEDAR. Ithas been accepted for inclusion in Huxley College Graduate and Undergraduate Publications by an authorized administrator of Western CEDAR. Formore information, please contact westerncedar@wwu.edu.

Recommended CitationMerrill, Analissa; Landefeld, Gus; Easton, Kyle; Britt, Shiloh; and Randall, Novella, "Environmental impact assessment Fever Creekbridge replacement" (2016). Huxley College Graduate and Undergraduate Publications. 65.https://cedar.wwu.edu/huxley_stupubs/65

EnvironmentalImpactAssessmentFeverCreekBridgeReplacement

ENVS 493, Fall 2016

WesternWashingtonUniversity

Authors:

AnalissaMerrillGusLandefeldKyleEastonShilohBritt

NovellaRandall

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

2

FeverCreekPedestrianBridgeReplacementEIAProjectTeamEnvironmentalImpactAssessment-ENVS493HuxleyCollegeoftheEnvironmentWesternWashingtonUniversityBellingham,WA,98225October2016DearConcernedCitizen, TheCityofBellinghamisattainingpermitstocompletetheFeverCreekbridgereplacement.Previously,thispedestrianbridgeconnectedSuperiorandMichiganstreets,whereEIllinoisStreet“T’s”intoMichigan,byprovidingasafeandeasypathwaytocrossFeverCreekforresidentsofAlabamaHillandRooseveltneighborhoods.ThiswasanimportantrouteforschoolchildrengettingtoRooseveltElementary.Duetopoorconditionstheoldbridgewasdeconstructedandthetrailclosed.Thecommunitywillbenefitfromreplacingthebridge.However,theprojectmayinvolvenegativeimpactsontheFeverCreekecosystemandsurroundingwetlands.

ThefollowingdocumentincludesanEnvironmentalImpactAssessment(EIA)developedinaccordancewiththeStateEnvironmentalPolicyAct(SEPA,WAC-197-11)toassesstheimpactsassociatedwithreplacingthepedestrianbridgeoverFeverCreek.

TheEIAanalysiswilldeterminethesignificanceoftheprojectontheenvironment.Areviewofrelevantliteratureandresearchwillbeconductedtolookatcurrentconditionsandproposedimpactsontheenvironment’searth,air,water,floraandflauna,aswellastransportationconditionsandimpacts.Theproposedaction,possiblealternativeoptions,andmitigationstepswillbereviewedtoevaluateandmitigateimpacts.Thisinformationwillbecompiledintoadecisionmatrixtomakeaneducateddecisiononif,when,andhowthisprojectshouldbecompleted.

Sincerely,AnalissaMerrill,GusLandefeld,KyleEaston,ShilohBritt,andNovellaRandall

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

3

WesternWashingtonUniversity

HuxleyCollegeUndergraduateHuxleyCollegeoftheEnvironmentPublications

ProposedFeverCreekBridgeReplacementEnvironmentalImpactAssessmentEnvironmentalImpactAssessment,ENVS493,Spring2016Analissa Merrill WesternWashingtonUniversityGus Landefeld WesternWashingtonUniversityKyleEastonWesternWashingtonUniversityShilohBrittWesternWashingtonUniversityNovellaRandallWesternWashingtonUniversity

Disclaimer:ThisreportrepresentsaclassprojectthatwascarriedoutbystudentsofWesternWashingtonUniversity,HuxleyCollegeoftheEnvironment.Ithasnotbeenundertakenattherequestofanypersonsrepresentinglocalgovernmentsorprivateindividuals,nordoesitnecessarilyrepresenttheopinionorpositionofindividualsfromgovernmentortheprivatesector.

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

4

FactSheetProjectTitle:EnvironmentalImpactAssessment:FeverCreekBridgeReplacementProposedAction:TheCityofBellingham(COB)proposedactionattheFeverCreektrailcrossingsitebetweenSuperiorStreetandMichiganStreetistoreplacetheexistingwoodenbridgewithanew,updatedbridgeinaccordancewithCOBstandardsforallrecreationalfootpathbridges.Thisactionisproposedduetohighdeteriorationoftheexistingwoodenbridge.LegalDescription:TheFeverCreekbridgeandtrailarelocatedbetweenMichiganandSuperiorStreets,whereEIllinois“T’s”intoMichiganStreet,inBellingham,Washington.LeadAgency:CityofBellingham210LottieStreetBellingham,WA98225Proponents:GinaAustin,P.E.,M.ASCEBellinghamPark&Recreation3424MeridianStreetBellingham,WA98225(360)778-7000gaustin@cob.orgLicensesandPermits:CityPermits–Clearing;Grading;CriticalAreas;PublicWorksStormwater;SEPADeterminationStatePermits–HydraulicProjectApprovalFederalPermits–Nationwidepermit;WaterQualityApprovalPreparedbyandAuthorContributions:ShilohBritt–Scribe,Tables&Figures,Acronyms,EarthSoils,GlossaryKyleEaston–Factsheet,Background,AirQuality,WaterQualityresearchGusLandefeld–ExecutiveSummary,FloraandFauna,GeographicInformationSystemsAnalissaMerrill–Background,WaterQuality,AirQualityresearch,ConclusionNovellaRandall–CitizensLetter,Transportation,Formatting,andPrimaryEditorDistributionList:Dr.TamaraLaninga,AssistantProfessorDepartmentofEnvironmentalStudiesHuxleyCollegeoftheEnvironment

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

5

WesternWashingtonUniversityBellingham,WA98225HuxleyMapLibraryArntzenHall,Room101WesternWashingtonUniversityBellingham,WA98225WilsonLibraryWesternWashingtonUniversityBellingham,WA98225Acknowledgement:Specialthankstothefollowingpeoplefortheiradditionalassistance:Dr.TamaraLaninga,WWU,WashingtonGinaAustin,COB/BellinghamParks&RecreationIssueDate:TuesdayDecember6,2016PublicPresentation:Date–ThursdayDecember8,2016beginningat2:30pmLocation–CityHallCouncilChambers,210LottieStreet,Bellingham,WA98225

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

6

TableofContents

CitizensLetter……………………………………………………………………..…………………..………………………….2FactSheet……………………………………………………………………………………………….………………………….4TableofContents………………………………………………………………………..…………………………………..…6ListofTablesFiguresandAcronyms……………………………………………………………………………….….91.0 ExecutiveSummary………………………………………………………………………………………….…….11

1.1 Purpose……………………………………………………………………………….……………….……..111.2 SiteDescription…………………………………………………………………………………………..111.3 ProposedActionandAlternatives………………………………………………….……………111.4 NeedforAction…………………………………………………………………………………….…….121.5 ProposedAction………………………………………………………………………………….………121.6 AlternativeAction……………………………………………………………………………….………121.7 NoAction………………………………………………………………………………………….………..121.8ImpactMatrix…………………………………………………………………………………………….…….131.9Recommendation……………………………………………………………………………………………..13

2.0 Background…………………………………………………………………………………………………………....142.1 FeverCreek………………………………………………………………………………………………...142.2 LegalContext……………………………………………………………………………………………..142.3 ProposedActionPermits…………………………………………………………………………..…15

3.0 EnvironmentalElements………………………………………………………………………………..……….173.1 Earth……………………………………………………………………………………………..…………….17

3.1.1 ExistingEnvironment…………………………………………………………………….…173.1.2 ProposedAction……………………………………………………………………….…....19

Impacts…………………………………………………………………………..…………….…19Mitigations……………………………………………………………………..………………20

3.1.3 AlternativeAction……………………………………………….…………………………..20Impacts…………………………………………………………………………………….………21Mitigation……………………………………………………………..……………..…………..21

3.1.4 NoAction……………………………………………..………………………..………………..21Impacts……………………………………………………………..………..……………………21

3.2 Water………………………………………………………………………………………………….………213.2.1 ExistingConditions…………………………………………………………………….…….213.2.2 ProposedAction………………………………………………………………….…………..22

Impacts…………………………………………………………………………………….………22Mitigation…………………………………………………………………………………………22

3.2.3 AlternativeAction………………………………………………………………….………..23Impacts…………………………………………………………………………………….………23

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

7

Mitigation…………………………………………………………………………………………233.2.4 Noaction………………………………………………………………….……………………..23

Impacts……………………………………………….……………………………………………233.3 Air……………………………………………………………………………………….………………………23

3.3.1 ExistingConditions…………………………………………………….…………………….233.3.2 ProposedAction……………………………………………….……………………………..26

Impacts…………………………………………………………………….………………………26Mitigation……………………………………………………….……………………………….27

3.3.3 AlternativeAction……………………………………….…………………………………..28Impacts…………………………………………………………………….………………………28Mitigation……………………………………………………………….……………………….28

3.3.4 NoAction………………………………………………….……………………………………..28Impacts……………………………………………………………….……………………………28

3.4 Flora&Fauna……………………………………………………………………………..……………….293.4.1 ExistingEnvironment…………………………………………………….…………………293.4.2 ProposedAction…………………………………………………….………………………..29

Impacts……………………………………………………………………….……………………29Mitigations………………………………………………………………….……………………29

3.4.3 AlternativeAction………………………………………….………………………………..30Impacts……………………………………………………………………….……………………30Mitigation…………………………………………………………………….………………….30

3.4.4 NoAction……………………………………………………….………………………………..30Impact……………………………………………………………………………………………..30

4.0 BuiltEnvironmentElement4.1 Transportation…………………………………………………………………..…………………………30

4.1.1 ProposedAction…………………………………………………..……………………………31Impacts……………………………………………………………..……………………………..31Mitigations………………………………………………….…………………………………..31

4.1.2 AlternativeAction………………………………………….…………………………………31Impacts………………………………………………………..…………………………………..31Mitigations……………………………………………….……………………………………..32

4.1.3 NoAction…………………………………………….…………………………………………..32Impacts……………………………………………..……………………………………………..32

5.0 ImpactMatrix………………………………………………………………………………………………………….6.0ConclusionandRecommendation……………………………………….……………………………………….327.0Glossary…………………………………………………………………………………………………..…………………..338.0References……………………………………………………………………………………………..…………………….34

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

8

ListofTables,FiguresandAcronyms

TablesTable1.DecisionMatrixTable2.DecisionMatrixKeyTable3.EngineemissionlevelsforvariouscompoundsTable4.EngineemissionlevelsforvariouscompoundsTable5.DecisionMatrixTable6.DecisionMatrixKey

FiguresFigure1.GISNetworkAnalysisMapFigure2:FeverCreekShortPlatFigure3:SatelliteimageofFeverCreekShortPlatFigure4:TestPitLocationMapoftheFeverCreekBridgeFigure5:MapoflocationofWetlandAandBlocatedonandneartheworksiteFigure6:FeverCreekPedestrianCountsAcronymsAQI:AirQualityIndexCO:CarbonMonoxideCOB:CityofBellinghamCSBC:CrushedSurfacingBaseCourseFAC:FacultativeWetlandIndicatorRatingFACU:FacultativeUplandWetlandIndicatorRatingFACW:FacultativeWetlandIndicatorRatingft,ft2:Feet,SquarefeetIPCC:IntergovernmentalPanelonClimateChangeL.E.G:LicensedEngineeringGeologistNAAQS:NationalAmbientAirQualityStandardsNOx:variousNitrogenOxidecompoundsNRCS:NaturalResourcesConservationServiceNWCAA:NorthwestCleanAirAgencyO3:OzonePAH:PolyaromatichydrocarbonsPb:LeadP.E:licensedcivilengineerwithgeotechnicalexperienceppm:partspermillionPM:ParticulateMatterPsf:PoundpersquarefootROW:RightofWaySEPA:StateEnvironmentalPolicyAct

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

9

SO2:SulfurOxideWAC:WashingtonAdministrativeCodeWSDOT:WashingtonStateDepartmentofTransportationWWU:WesternWashingtonUniversity

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

10

1.0ExecutiveSummary1.1PurposeThepurposeofreplacingtheFeverCreekpedestrianbridgeistoprovideasafe,reliable,andenvironmentallyresponsiblebridgerunningeasttowestbetweenSuperiorStreetandMichiganStreet.CurrentlythereisnopedestrianbridgeconnectingthetrailthatcomesfromtheEIllinoisStreetRightofWay(ROW)andcrossesFeverCreek.Theformerbridgewasremovedprimarilyduetopublicsafetyconcerns,asitsawheavyusebyelementaryschoolchildrenwhowouldwalkfromtheirhomesintheRooseveltandAlabamaHillneighborhoods.Thisdocumentwillexaminetheimpactsofreconstructingthebridgeandconsidertwodifferentalternatives.

Figure1:AnetworkanalysisforpedestriandetoursduringtheclosureoftheFeverCreekpedestrianbridge.ThenetworkanalysiswasperformedinArcGISandintendedtoprovideabasisforpedestriandetours.Tobenotedisthattherearenosidewalkspresentonthedetourroutes.(CreatedbyGusLandefeld2016).

1.2SiteDescriptionTheFeverCreekpedestrianbridgerunseasttowestalongtheEIllinoisStreetROWbetweenSuperiorStreetandMichiganStreet.FeverCreekitselfisanarrowcreekrunningnorthtosouthandfeedingintoWhatcomCreekasatributary.Currentlythereisnopedestrianbridgein

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

11

place,forcingformeruserstowalkonstreetswithoutthesafetyofsidewalksortoillegallycrossthecreek,whichdamagesthefragileecosystem.

1.3ProposedActionandAlternativesThefollowinglistofactionsincludesaproposedaction,analternativeaction,andanoactionalternative.ThesearetheoptionspresentedtotheCityofBellinghaminregardstowhatshouldbedonewiththeFeverCreekpedestrianbridge.

1.3.1NeedforActionReconstructionoftheFeverCreekpedestrianbridgeisnecessarybecauseitprovidesasafeandreliablewayforitsprimaryusergroupofRooseveltElementarySchoolstudentstowalktoandfromschool.Ifthebridgeisnotreplaced,thenelementaryschoolstudentsdonothavetheoptionofwalkingtoschoolonapaththatisfreefrommotorizedvehiclesandthereforelesssafethanthepedestrianbridge.

1.3.2ProposedActionTheproposedactionforthereplacementoftheFeverCreekpedestrianbridgeistoinstallatemporarybridgethatabidesbythestandardsoftheCityofBellinghamassoonaspossiblepriortowinter.Thentoreplacethetemporarybridgewithapermanentbridgeatthebeginningofthesummer.BecausestudentsattendingRooseveltElementarySchoolareoneofthelargestusergroupsofthebridge,constructionofapermanentbridgewouldoccurafterJune15,2017whenstudentsareoutofschoolanduseofthebridgedrops.TheCOBwouldneedtoensurethatthewetlandintheareasurroundingthebridgeisproperlyrestoredandthebridgeisconstructedwithenvironmentalmitigationinmind.

1.3.3AlternativeActionAnalternativeactionistoforegoinstallingatemporarybridgeforthewintermonthsandinstallapermanentbridgeimmediatelytoreopenthetrail.Theoverallobjectiveofthealternativeactionwouldbethesameastheproposedactionwiththeonlydifferencebeinginthetimeofyearofconstructionandanincreaseinenvironmentalmitigationefforts.

1.3.4NoActionThenoactionalternativeistoleavetheFeverCreekbridgesiteunaltered.

1.4SummaryofSignificantImpactsFeverCreekflowssouthandfeedsintoWhatcomCreekandeventuallyintoBellinghamBay.BothFeverCreekandWhatcomCreekaredesignatedassalmonbearingstreamsand

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

12

constructionofanewpedestrianbridgenearRooseveltElementarySchoolhasthepotentialtodetrimentallyimpactthecreek.Thiscouldcomeintheformofpollutionfromconstructionvehicles,debrisbeingcaughtinthecreek,anddestructionofpotentialsalmonhabitats.

Theprimarypotentialenvironmentalimpactswouldbepositivebecauseofnecessarywetlandrestorationefforts.Littledamageofthesitewouldoccurduetotherelativelysmallsizeoftheproject.Mostoftheconstructionperformedwouldrequirelittletonovehicleassistedwork,thereforereducingtheamountofcarbondioxideandothernoxiousfumesemitted.Theproposedactionwouldonlyrequireafewenvironmentalmitigationeffortstokeepenvironmentalimpactsatminimumlevels.

1.5ImpactMatrixTable1showsthedecisionmatrix,whichoutlinesthesignificantimpactstoenvironmentalelementsanalyzedfortheproposed,alternative,andnoactionalternatives.

Table1:DecisionMatrix

SEPAElements ProposedAction AlternativeAction NoAction

Earth -2 -1 -1

Water +1 -2 -1

Air -1 -1 0

Flora&Fauna +2 +1 -2

Transportation -1 +1 -2

Total -1 -2 -6

Table2:DecisionMatrixKey

1.6RecommendationsWerecommendthattheproposedactionispursuedasitwouldreduceenvironmentalimpactswhencomparedtothealternativeandnoactionplans.ReplacingtheFeverCreekpedestrianbridgewouldhelpprovideasafepathforelementaryschoolstudentstocommuteonfoottoandfromschooleachdaybyminimizingtimespentawayfrommotorizedtraffic.

Score Impact

+1to+2 PositiveImpact(2beingsignificant)

-1to-2NegativeImpact

(2beingsignificant)

0 ZeroImpact

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

13

2.0 Background2.1FeverCreekThepurposeofreplacingtheFeverCreekpedestrianbridgeistoprovideasafe,reliable,andenvironmentallyresponsiblebridgerunningeasttowestbetweenSuperiorStreetandMichiganStreet.ThebridgeconnectstheRooseveltneighborhoodwithRooseveltElementarySchool.Thepreviousbridgewasdeemedunsafeduetoageandstructuraldamage.Theonlystructureremainingarethesupportstructuresonthecreekbank.CurrentlythereisnopedestrianbridgeconnectingthetrailthatcomesfromtheEIllinoisStreetRightofWayandcrossesFeverCreek.FeverCreek’sheadwatersbegininFeverCreekNatureAreaandflowthroughRooseveltNatureAreaandprivateresidencesbeforereachingtheworksite.Duetotheproposedworksite’scloselocationtoprivateproperties,atributarytoWhatcomCreek,andtwolargewetlandsinthearea,environmentalimpactsneedaddressing.Theimpactsthisdocumentconsidersincludeearth,water,air,floraandfauna,andtransportation.Seasonaldifferencesbetweentheproposedandalternativeactionsinregardstoconstructionofthebridgeisunderconsideration.Theproposedactionputsconstructionofthebridgeinsummerwhenflowratesinthecreekwillbelow.Thealternativeactionputsconstructionofthebridgeinwinterwhenflowratesarehigher.Pedestrians,particularlyschoolchildren,continuetotakethisroutetoschool,causingerosionproblemsandcreatingafurtherneedforatimelysolution.

2.2LegalContextThebridgelocationatFeverCreekandtheaccompanyingtraildonothaveastandardlegaldescription.Thereisnomeetsandboundsdescriptionofthepropertyandalthoughthearea

Figure2:FeverCreekShortPlat,lyingtotheNorthoftheEIllinoisROW(CourtesyofChicagoTitleCompany)

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

14

mayunofficiallybedesignatedasaneasementbelongingtotheCOB,thereisnorecordofthisinrelationtotheneighboringshortplats.In1889,EastIllinoisStreetwasdedicatedtothepublic.ThetrailisdescribedasthatunopenedportionofEastIllinoisStreetlyingbetweenMichiganStreetandSuperiorStreet.

Figure3:SatelliteimageofFeverCreekShortPlatshowingproposedactionlocation(CourtesyofChicagoTitleCompany)

2.3ProposedActionPermitsThisprojectwillrequire5permitsfromtheCOB,thisincludes:agradingpermit,aclearingpermit,acriticalareaspermit,oneforpublicworksstormwater,andaSEPAdetermination.Thegradingandclearingpermitsarenecessaryforanyworkthatisdoneregardingthemovementofsoil(specificallyexcavationandsoilfill)andvegetationclearingrespectivelyforworkinandaroundtheproposedactionsite.Thecriticalareaspermitisdesignedtoprotectsensitiveenvironmentalareasandrestorethemasneededasbestaspossibletotheiroriginalstateafteranyprojectasbeencompleted.Almostanyprojectthatinvolvesthemovementofsoilwillalsorequireastormwaterpermit,alongwithanyadditionalworkthatdealswithimpervioussurfaces.Finally,thisprojectwillrequireaSEPAdeterminationforreasonsthatwillbedescribedwithinthisreport.

Inadditiontocitypermits,thisprojectwillalsorequireoneWashingtonstatepermit.Thehydraulicprojectapprovalpermit,issuedbytheDepartmentofFishandWildlife,isrequiredfor

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

15

anyprojectthatoperationsnearanystatewaters.Thisrequirementisspecificallydesignedforprotectionofaquaticwildlife.

Finally,thisprojectwillrequiretwofederallevelpermits:thenationwidepermit,andawaterqualityapprovalpermit.ThenationwidepermitisenforcedbytheUnitedStatesArmyCorpsofEngineers,andbothpermitsdealwithsitewaterqualityunderthe1992CleanWaterAct.

3.0 EnvironmentalConditions

3.1Earth

3.1.1ExistingConditionsOnSeptember15,2015,aWhatcomCountySoilSurveywasconductedattheproposedFeverCreekbridgereplacementsite.ThesurveyrevealedthatonesoiltypeexistednearorwithintheproposedsiteparcelandwasclassifiedatWhatcomSiltyLoamconsistingof3to8percentslopes(ElementSolutionsetal.,2016).

Furthermore,theElementalSolutionssoilsurveyindicatedthathydricsoilsarefoundthroughouttheparametersofthestudysiteandarethoughttobeassociatedwiththedepressionalfeaturesofthesite.ThetexturesofthesoilwerenotdiscoveredtobeconsistentwiththatoftheonlineNaturalResourceConservationService(NRCS)date,andthesoilsinstead,whichweregenerallydisturbed,couldbepotentiallyclassifiedasacombinationsoiltype:WhatcomSiltyLoamandWhatcomSandyLoam.

ElementalSolutionsobservessoilstohavehydricindicators.Multipletimesofsoilswerefoundatthesiteincludingsandyloam,siltyloam,andotherloamysoils.Furthermore,WashingtonStateDepartmentofNaturalResourcesdesignatedthesoilsasglaciomarinedrift.(ElementSolutionsetal.,2016).InformationonexistingsurfacegeologicconditionswascompiledbytheWashingtonState

Figure4TestPitLocationMapoftheFeverCreekBridgeRH2EngineeringIncAugust23,2016.COBFigure4:TestpitlocationmapoftheFeverCreekBridge(RH2Engineering,Inc.2016;COB)

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

16

DepartmentofNaturalResources(WADNR). Thecurrentexistingpathleadingtotheformerbridgeconsistsof4to6inchesindepthofcrushedlimestonebase.Nativesandyclay,whichhasbeenidentifiedasglaciomarinedriftandincludesvariableorganicsthatreduceincontinuationasdepthincreases,werealsofound.(Burwell,D.,2016)

Thetestpits,detailedintheGeotechnicalreport,indicatedthatthesiteisunderlainbyglaciomarinedriftofvaryingdensities(softtoverystiff),withatendencytobemedium-stifftoverystiffintheareasuplandfromsurfaceto10feetto1footbelowgroundsurface.Theglaciomarinedrift,itself,consistsofvaryingamountsofsand,gravel,silt,andtheoccasionalboulderclusterorstandaloneboulder.Observedvariationoftheglaciomarinestiffnesscanbeattributedtothedryingprocessofthesurface.GroundwaterelevationsandsoilsaturationlevelswillvarywiththeseasonandprecipitationeventsinadditiontotheproximitytotheFeverCreekstreamandadjacentwetlands(Burwell,D.,2016).

Intheentiretyoftheproposedproject,excavationtothesubgradewillbemandatoryandrequiretheremovalofexistingnativeearthandfillcomposites.Thiswilllikelyentailtheuseofheavyearth-movingmachinery.(Burwell,D.,2016)Whenexcavatingearthfortheretainingwallandbridgefoundation,theexcavationmustoccurdeepenoughtoensurethattheexistingnativesubgradeisconsistentincompositionofin-situsoilsthataresuitable.Thein-situsoilsmusthaveacompositionthatwillnotallowforbearingonthesoftlayersorlocationsthatlackshearstrength.(Burwell,D.,2016)

Topsoilzonesincludebioturbated,whichisazoneofweatheredand/ororganictopsoil.Thiszonehasdepthsvaryingfrom1.5to3.0feet,whichisdependentuponadjacenttreelocationsandpreviousconstructionactivity.Thistopsoilmaybelaterusedforlandscapingpurposes.

Earthmaterialorfillexposedatthebaseofexcavationthatisdeemedunsuitablebythegeotechnicalstandards(seegeotechnicalreport)istobeover-excavatedandreplacedwithcrushedsurfacingbasecourse(CSBC)pertheWashingtonStateDepartmentofTransportation(WSDOT)2016Specifications(Burwell,D.,2016).

Asinrelationtosoils,footingsforretainingwallsandstructuresaretobeplaceddirectlyona6-inchsurfaceofunyieldingandfirmCSBC.Additionally,thechosenareamustbefreeofallloosematerial.SubgradebelowtheCSBC,ifnative,shouldbecomprisedofstiffglaciomarinedriftandfreeoforganicmaterials.Thefootingsforthestructures,toprovideprotectionfromwinterfrostpenetration,aretobeatleast18inchesbelowgroundsurface.(Burwell,D.,2016).

Theprojectedprojectdoesnothavereasontoexcavatemorethan3.5feettoreachthefoundationofthebridgeabutment;however,thiswillnonethelessresultindisruptionofnativesubgrade.ThiswillleavetheNativesubgradewillbesusceptibleto

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

17

degradationwhichwillincludethelossofshearstrengthifexposedtoconstructionequipmentand/orweather.

Intheeventofaprecipitationeventpriortosubgradeimprovementsandthein-situearthbecomesaturated,thesaidnativesubgradewilllikelybecomeunsuitableforsupportingastructuralfoundation.Ifnativesoilishighlymoisturesensitiveitwillnoteffectivelycompact,andbecomesevenmoresooncedisturbed.Shouldnativesoilsbeingsoft,theremustbeanadditional12-inchlayerofquarryspallsaddedandcompactedwiththedriftintothesoftareas.Thisallowsforanincreaseinshearstrength.Thiscompositemustbeallowedtoset,protectedfromrain,foraperiodof24-48hours,thiswillallowthecompositeto“heal”andallowthepourwaterpressuretodissipate.

Thereexistsahighlevelofvariabilityforthedriftandweatherconditionsdependingonthetimeofyearinwhichtheconstructiontakesplace.Itisforthisreasonthatitisoftheutmostimportancethatproperinspectionofthenativesubgradeoccurs(tobecompletedbyacertifiedP.EorL.E.G)beforeanyconstructionbegin.

Inregardstobearingcapacityandthestrengthoftheearth,theglaciomarinedriftwithpreparationcansupportevenlyspreadloadsupto3,000poundspersquarefoot(PSF)-Thisallowsforthenetallowableweightbearingcapacity.Thiscapacitymaybeincreasedbyone-thirdforshorttermwindorseismicevents,thusallowingthenewbearingcapacitytobe4,000PSFforashortamountoftime.Again,footingsshouldbeaminimumof18incheswidetoallowforanevenspreadloadtothedrift.(Burwell,D.,2016)

3.1.2 ProposedActionImpactsThetemporaryfootbridgeistoberootedassoonaspossible,duringthewintermonths.Thiswilltakeplaceduringthewetseasonduringatimeofpeak,ornearpeakflowsofFeverCreek;duringthistimeframesoils,willbethemostsaturated.Becausethesoilislesssaturatedduringthesummermonths,thegroundwillbebetterequippedtobearaload,especiallyduringtheconstructionphase.Itisimportanttonotethatwithoutsoilbanksupportsimplemented,theseasonablyhigherflowsofFeverCreekwillcontinuetowashawaysoilsoftheembankmentwhichwillleadtoalossofbankstability.

Duringthesummerof2017,asecondconstructioneventwilloccurwhereinthetemporarybridgewillberemoved,andapermanentbridgewillbeconstructedinitsplace.ThisactionistobecompletedinthesummerwhenFeverCreek’sflowsareattheirlowestandwhentherehashistoricallybeentheleastamountofsoilsaturationoftheyear.Becausesoilswouldbeimpactedwhentheyweremorearid,andthereforemoredry,therewouldbetheleastamountofcalculatedimpactsforaconstructionprojectto

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

18

occur.Becauseofthepreviousconstructionmonthsbefore,thesoilwillbecompromisedandlikelynotstructurallysoundwithoutaddedmaterials.

MitigationsOncenativesoilisdisturbed,itwillnotbefittouseasstructuralfillasthenativesoilwillnotcompacteffectivelyduetoitshighmoisturesensitivity.Nativesoilistobememovedoffsitesoasnottomixwiththestructurally-soundfill.Additionally,specialmeasuresmayneedtobetakentoensurethestabilityofthebankfromfurtherdegradation.Temporaryfootbridgemitigations:Toaccommodateforthewetseason,duringtheproject’sconstructionallworkingsurfacesthatundergorepeatedorregularfoottrafficshouldbecoveredwithageotechnical fabric.Thisistoensuretheseparationofthedriftandtoaideintheassistanceofspreadingthenewloadoutonthealreadypresentnativesoils.Afterthegeotechnicalfabric,hasbeenplaced,itisoftheutmostimportancethataCSBClayerbeplaced,thiswillallowfortheprotectionofthenativein-situsoilsfrombecomingdisturbedorloosefromthecommencingconstruction.(Burwell,D.,2016)

CommonlyobservedwetseasonpracticesinconjunctionwiththeBestManagementPracticesshouldbeimplemented,theseincludeconstructionandtruckwash-downareastoreducetheamountoferosionandotheroff-siteimpacts.(Burwell,D.,2016)

PermanentreplacementbridgeMitigations:DuringthedrysummerseasonFeverCreekflowrates,willbeseasonallylowandthereforethegroundwillbetheleastsaturatedandmoststable.Despitethis,wetseasonprotocolshouldbefollowedduringthedryseasonaswell,howeverwilllikelynotbeasdrastic.Itisadvisedthataconstructioneventoccurduringatimeofnorainsothatsoilswillbetheleastsaturatedandmoststabletosupportconstructionequipment.

Priortoeachconstructionevent,alicensedP.EorL.E.Gmustevaluatetheconditionofthesoilsimpactedanddecideifthesoilsandsurroundingeartharestableenoughtosupportaconstructionevent.Onceapprovalisobtained,constructionmaybeginwithadditionalmitigationsasassignedbytheevaluatingP.E.orL.E.G.

3.1.3 AlternativeActionImpactscompletedinwinterImpactswillbethesameasaboveforthewetseasonandthealternativeaction.MitigationMitigationmeasureswillbethesameasaboveforthewetseason.

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

19

3.1.4 NoActionImpactsAnoactiondecisionwouldresultinnoadditionalnetimpactstotheearthandearthsoils.Theseelementswillcontinuetohaveanaturalseasonalvariabilityhastheyhavedoneforcenturies.

3.2Water3.2.1ExistingConditionsTheproposedsiteofthenewpedestrianbridgehasmanyconcernssurroundingmanipulationofexistingwaterconditions,mainlysurroundingFeverCreek,andwetlands.TheApril2016wetlanddelineationsurveyhighlightedtwodistinctwetlands,WetlandAandBasshowninFigure5fromElementSolution,intheareaproposedforthenewbridge.ThewetlandsareclassifiedascategoryIIandIII,andbothgettheirwaterfrompuddlingrainwaterandaredryinsummer.Thetotalareathatthewetlandcoversisover4,550ft2,whichismostthesite.ThedirectionofthewaterflowisfromthewetlandsonsiteintoFeverCreek.Wetlandsarenotexpectedtobeinfluenceddirectlybytheriverinesystem.(ElementSolutionsetal.,2016)FeverCreekisafirstorderstreamandoneofthetributariestoWhatcomCreek.TheheadwatersstartinFeverCreekNatureAreaandflowthroughRooseveltNatureAreaandprivateresidencesbeforeitreachestheproposedsite.Waterqualityduetoincreasedurbanizationisimpaired,includinghighlevelsofturbidity,fecalcoliform,etc.(Shannahan,J.,LaCroix,R.,Cusimano,B.,&Hood,S.,2004).Streamflowinthewinterishigherthaninthesummer,duetotheseasonalnatureofthewetlandsfromwhichthewaterflows(ElementSolutionset.al,2016).

BellinghamHabitatRestorationreviewtherestorationofthewetlandsalongFeverCreekwereconsideredahighpriority,whileFeverCreekitselfhasalowpriorityforrestorationduetoitsverylowexistinghabitatfunctions(LaCroix,R.,2015).AnotherwatersourceisthestormwaterdraincomingfromRooseveltElementarySchool.Thelocationthattheelementaryschoolwaspreviouslyawetland.Thewater

Figure5:MapoflocationofWetlandAandBlocatedonandneartheworksite(ElementalSolutions2016).

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

20

drainingfromthatoldwetlandflowsthroughthestormwaterpipesundertheproposedsiteandintothecreek.(ElementSolutionsetal.,2016)

3.2.2ProposedAction Impacts

Thetemporaryfootbridgewillbeinstalledinthewinterwhenthepeakflowseasonbegins.Thiswillmostlikelyaffectthesedimentreleaseintothestream,aswellaspossiblefishhabitatdisruption(M.JRobertson,D.A.Scruton,R.S.Gregory,andKeithD.Clarke,2006).

Duringthesummermonths,bothwetlandsonthesitewouldbeseasonallydry,andsurfacewaterinthewetlandareaisdry.Subsurface/Groundwaterflowintothestreamwouldbeatitsminimum,andthuswouldcauseFeverCreektobeatitslowestflowoftheyear(ElementSolutionsetal.,2016).Therefore,duringconstruction,thewaterinFeverCreekwouldbeminimallyimpactedfromincreasedturbidityfromtheincreaseoferosionoftheriverbanks.ThereisalsominimalriskofPolyaromatichydrocarbons(PAH)fromtheheavymachineryusedenteringthewatertablenowduetonosurfaceflow.

Mitigation

Tofurtherminimizeerosionandincreasedturbidityduringthereplacementbridgeconstruction,theCOBParksDepartmenthasaprocedurethatisusedinallsmallbridgereplacements.Thisprocedureincludesusingdamsandpumpstodivertthewateraroundtheconstructionsite,thenplacingmeshcatchscreentoreduceerosionwithintheworkarea.Ifanyfishweretobeneartheworkarea,theywouldbetransferredupordownstreamoftheworkareabytrainedbiologists(GinaAustin).

Impactstothewetlandmustbemitigatedatarateofthreetoonefortotalimpactedarea.Theymustimprovetheotherexistingwetlandsalongthesite,andsurroundingarea(WSDOT,2008).

3.2.3AlternativeAction Impacts

Duringthewintermonths,bothwetlandsatthesitewillbewet,andsurfacewaterisexpected.Subsurfaceandgroundwaterflowintothestreamisexpectedtobeatmaximumflowrates,andthusFeverCreekwouldbehighalongitsbanks(ElementSolutionsetal.,2016).Theriskofsedimentsenteringthewaterwouldbehigh.ThereisahighpotentialforchemicalssuchasPAH’sfromheavymachinerythatwouldbewashedintothestreamorpoolinthewetlandduetohighsurfaceflow.

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

21

MitigationSmallbridgereplacementmitigationproceduresoutlinedbytheCityofBellinghamParksDepartmentwillbethesameasabove,howevermoredifficulttoimplementduringthewinterduetotheincreasedstreamflowthroughthearea.Mitigationfortheareaofthewetlandsimpactedbythebridgelocationmovingarethesameasabove.

3.2.4NoAction

ImpactNotreplacingorplacingatemporarybridgewillcausemorefoottrafficthroughFeverCreekandWetlandA,erodingthebanksfurtherandharmingthewetland.Fishhabitatsuchaspebblecountandsedimentationmaybeimpacted.Fecalcoliformlevelscouldalsoincreaseifthetemporaryfootbridgeisnotinstalled(ElementSolutionetal.,2016).

MitigationRecommendedwetlandrestoration(LaCroixR.,2015),andclosureofthewalkwayissuggested.

3.3 Air

3.3.1ExistingConditionsAirpollutantsofconcernasexpressedbyfederalagenciessuchastheEnvironmentalProtectionAgency(EPA,2015)aredescribedbelow.ThesecoincidewiththoseprioritizedbylocaldepartmentssuchastheNorthwestCleanAirAgency(NWCAA)(NWCAA,2016)andorganizationsliketheAmericanLungAssociation(AmericanLungAssociationetal.,2016);andsoarethefocusofairqualityconcernsofavarietyofprojecttypes.Monitoredpollutantsare:Lead(Pb),CarbonMonoxide(CO),variousNitrogenOxides(generalizedtotheformulaNOx),SulfurDioxide(SO2),Ozone(O3),andParticulateMatter10(PM10)andParticulateMatter2.5(PM2.5)whichrefertoaparticlesizeof10microns(micrometers)and2.5micronsrespectively.TheNWCAAoverseesahandfulofairqualitymonitoringstationsthroughoutWhatcomCounty,includingonelocatedinBellinghamthatmonitorssomeofthesedifferentpollutants(DepartmentofEcology,2016).LeadLeadisanaturallyoccurringmetalandhasbeendeemedtoxicbythescientificcommunity.Sincetheeliminationofleadfromgasoline,paints,andmanyotherproducts,leadisgenerallynotmonitoredfromambientairunlessindustrialprocessesthatutilizethismaterialmakeitnecessarytodoso(NWCAA,2016).LeadasapollutantisnotregularlymonitoredwithinthecityofBellinghamorWhatcomCountyandthusnodataisavailableforexistingairleadlevels(PortofBellingham,2010July;EPA,2015).

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

22

CarbonMonoxideThebiggestsourceofCOisusuallyvehiclesandothercombustionprocesses(e.g.,heatingandindustrialprocesses).TheonlycontributingfactorsofCOemissionswithintheproposedprojectareaarethoseduetolocaltrafficfromthestreetsofSuperior,Michigan,EastIllinois,andNewHavenPlace.Duetothelowtrafficlevelsinthisresidentialareaandthelackofthroughstreets,COemissionsarelowandarethereforenotmonitoredatthislocationorwithinthecityofBellingham(PortofBellingham,2010July;EPA,2015).NitrogenOxidesNitrogenOxidesareveryreactiveandtendtohaveaveryhighglobalwarmingpotential,alongwithpotentialadversehealtheffects,forinstanceforminghazardouscompoundssuchasperoxyacylnitrates(O'Neil,G.,2016October).NitrousOxide(N2O)isaproductofreactionswithNOxcompoundsthat,pertheIntergovernmentalPanelonClimateChange(IPCC),hasaroughly300xglobalwarmingpotentialtothatofcarbondioxide(IPCC,2007).DuetoalackofindustrialsourcesintheBellinghamarea,therearenoNOxmonitoringstationsandthusalackofdataforcreatingabaselineofNOxpollutants(EPA,2015).However,peranEIScompletedbythePortofBellinghaminregardstotheoldGeorgiaPacificsiteandwaterfrontdistrict,BellinghamcurrentlymeetslocalandfederalstandardsonNOxemissions(PortofBellingham,2010July).SulfurDioxideSimilartoNOx’s,SO2comesfromvariousformsofSulfurOxides(SOx),mostofwhichcomefromelectricgeneratingfacilitiesthatburnfuelswithhighersulfurcontents(typicallycoal).SO2isamajorcontributortoacidrainduetoitsabilitytodissolveinwater.ThereisoneSO2monitoringfacilityinWhatcomCounty,butnostationlocatedwithinthecityofBellingham(NWCAA,2016).Asof2015theEPAreportednoavailabledataformeasuringSO2levelsinBellingham(EPA,2015).OzoneOftheselectedairpollutants,ozoneisamoreregionallybasedandwidespreadtypeasopposedtoapointsourceemission.Bellinghamcontainsamonitoringstationcapableofmeasuringthispollutant,andper2015EPAdatathehighestreachedlevelofozonewas0.048ppmforan8-hourconcentrationreading(EPA,2015).ThisfallsbelowthecurrentU.S.NationalAmbientAirQualityStandards(NAAQS)of0.070ppm(EPA,2016September16).PM2.5andPM10Alongwithozone,BellinghamalsohasanairmonitoringstationoperatedbytheNWCAAforparticulatematter.ThisstationislocatedonYewStreetneartheintersectionofYewStreetandAlabamaStreet,veryclosetotheproposedactionsite(DepartmentofEcology,2016).Asof2015theEPAlistedBellinghamashavinginsufficientdatatodecideonambientairparticulatematterlevels(EPA,2015);however,inthe2008PortofBellinghamEIStheyreportbothPM2.5andPM10levelsfor

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

23

the2005year.Bothweremeasuredin24-hourranges,withPM2.5levelsreachingamaximumof21microgramspercubicmeterwhiletheconcentrationofPM10reachedamaximumof26microgramspercubicmeter(PortofBellingham,2010July).BothofthesefallwithinacceptablelevelsaccordingtotheU.S.NAAQS(EPA,2016September16).AccordingtothedatacollectedbytheEPAusingairmonitoringstationswithinBellinghamandlocatedthroughWhatcomCounty,theairqualityisdeterminedonascaleknownastheAirQualityIndex(AQI).ForbothozoneandshorttermPM2.5Bellinghamranksasoneofonly8citiesthatmaintainedastandingof"good"ontheAQIfortheyear2015.Thisisthehighestairqualityratingavailableandindicatesthattheregionneverexperiencedanydaysofunhealthyairquality(AmericanLungAssociationetal.,2016).Thisstandingmeetsandexceedsbothfederalandlocalregulationsforambientairquality.TheacceptablelevelsaccordingtotheNAAQSforeachpreviouslydiscussedpollutantroughlycorrespondtoanumericalvalueof100ontheAQI(AirQualityIndex,n.d.).

Table3.TheEPA'sAirQualityIndex.Numericalvaluesareastandardizationbasedonactualconcentrationsandareappliedtoeachairhazardindividually(AirNow,n.d.).

3.3.2ProposedActionImpacts

Dependingontheconstructionmethodsusedtoinstallthepermanentbridgereplacement,airqualityimpactsmayvary.Adrysummerseasonwillmeanstagnantairandlessrain.Dustfromtrailmaintenanceandremovalofexistingfootingswillbeofgreatestconcern.Thismayleadtoreducedairqualityintheimmediateareabecauseofincreasedparticulatematter.Additionally,windpatternsduringtheprojecttimeframe

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

24

mayhaveanimpactonthelocationofdustandparticulatematteraccumulation.Exactestimatesareproblematictodeterminequantitativelyhoweverbecauseofdifficultieswithlongtermweatherpredictability.Longdistancesofparticulatedistributionareunlikelyastheproximityofnaturalandman-madebarriers(e.g.treesandhouses)preventthis.

Thefoundationsofthenewpermanentbridgewillbeofconcrete(Austin,G.,2016October)anditiswellestablishedthatthecementmanufactureindustryreleasesalotofairpollutants;however,theseareassociatedwithcementproductionwhichwillhappenoffsite.Thecuringofthecementattheproposedactionsitewillnotcontributetoanyairqualityissues(Wilson,A.,1993March/April).

Table4.Engineemissionlevelsforvariouscompounds.*HCindicationtotalhydrocarbons.Tablederivedfromoriginalsource(Helmer,K.,etal.,n.d.).

EngineModel

horsepower(hp)

EmissionsLevels(g/hp-hr)

HC CO CO2 NOx PMYanmar2TNE68

14 0.328-0.534 2.878-5.648 825-843 4.167-4.320 0.460-0.929

YanmarL100AE-DE

9 1.512-1.556 8.305-9.344 706-719 6.159-6.407 1.263-1.587

LombardiniLDW903

20 0.242-0.619 2.766-3.072 767-798 3.004-3.355 0.609-0.636

KubotaV2203B

49 0.075-0.090 1.053-1.234 668-671 4.253-4.272 0.600-0.615

Hatz1B30 7 0.628-0.633 4.025-4.220 758-783 5.126-5.347 0.510-0.523

Otherairpollutantswillbedependentonwhetherheavymachineryisusedfortheproposedaction.Withoutanymachinery(excavatorsordiggers), dustwillbetheprimaryairhazard.Nootheremissionsasreferredtoabovewillbeofconcern(Section3.3.1).Combustionemissionsaremeasuredbasedonenginetypeandsize.Ifanexcavatorisuseditwillbesmall,becausetheinstallationisnotcomplex,andit'soccurringinaconfinedright-of-way.ForthepurposesofthisEIAitisassumedanyenginewouldbelessthan50horsepower.Table4showsfivedifferentenginestestedforavarietyofemissions(Helmer,K.,etal.,n.d.).Theseareprovidedonagramofpollutantperhorsepowerperhourofusage(g/hp-hr).Dependingonthelengthoftimeofuseandsizeoftheengine,totalemissionsforconstructioncanbeestimatedgiventhisbaselinedata.ThiscanthenbeextrapolatedtooverallsiteairqualityusingtheparameterswithintheAQIandsizeoftheproposedsite.

Inadditiontotheabove-mentionedemissions,PAH'sarereleasedaspartofdieselenginecombustionandaredirectlyrelatedtoparticulatematter(specificallyPM2.5)

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

25

levels.ItcanbedifficulttodetermineexactPAHemissionratesasPAHconcentrationsareduetodieselfueltypeandaromatichydrocarboncontent.IthasbeendeterminedthoughthatPAHcontentindieselemissionsisnogreaterthan1%ofthePMmassofdieselengineexhaust(NCEA,2002May).Morespecifically,onlyPAHcompoundscomposedof3-5aromatichydrocarbonringshavetheappropriatevaporpressuretovolatizeandremainintheambientair(NCEA,2002May).

Methodsofinstallationofatemporarypedestrianbridgemayaddadditionalimpactstoairqualityattheproposedactionsite.Ifnotemporarybridgeistobeaddedornomachineryistobeused,thennoadditionalairqualityimpactsexistfortheproposedaction.Ifmachineryisusedinitsinstallationand/orremoval,thenadditionalemissionswillbeaccruedperthedatainTable4.TheaspectofatemporarybridgeexistingoverFeverCreekwillnotinitselfcauseanyadditionalairqualityissues.

MitigationIfheavymachineryistobeusedfortheproposedaction,generallythereisnostandardmethodtominimizeexhaustemissionsandparticulatesotherthanthestandardcomponentsthatalreadyexistinstalled.Howeveritmaybepossibletochooseaspecificmachinewithasmallerengineorabetteremissionsprofile.Thiswillbedeterminedorhinderedbytheexacttypeand/orseverityofgroundworknecessary.

Withrespecttodustfromphysicalconstructionand/orwindthereareseveralmitigationtechniquesthatcanbeemployed.Layeringmaterialoverthesoiloftheworksitewillalleviatedustupliftintotheair.Gravel,mulch,straw,orphysicallysprayingwatercanbeused.MinimizingtheareaofvegetationclearingandutilizingtimeofoperationsaftervegetationclearingalsoacttodecreasePM(dust)release(DOE,2016July).

3.3.3AlternativeActionImpactsEmissionsfromconstructionequipmentforthealternativeactionwillmirrorthatoftheproposedaction(Section3.3.2.1).Thetimeofyearwillhavenoeffectontypeofemissionsthatarereleasedatthesitefromoperatingmachinery.Dependingonweatherandhowthisaffectsthescheduledlengthofconstruction,emissiontotalsmaychangeifoperatingtimesincrease.ThesewillstillbeestablishedfrombaselinefactorsfromTable4.

Dependingonweatherpatterns,airqualityfromdustmayvaryfromthatoftheproposedaction.Increasedwindduringthewinterseasonmayhelptoremovedustfromthesite,howeverthispresentstheimplicationofmovingthisPMintoadjacentresidentialareas,affectingthoseclosesttothesite.Similarly,anincreaseinrainwillhelptoreducedustaccumulationintheairaltogetherduringconstruction.

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

26

MitigationSincetheimpactsforthealternativeactionarethesameasthatoftheproposedaction,themitigationsforthealternativeactionremainthesameaswell(Section3.3.2.2).However,typicalwinterweatherpatternsleadtoincreasedrainwithinthealternativeactiontimeframe,thuskeepingthegroundandsoilsinandaroundtheproposedactionsitewettedviaphysicalmeanswillnotbenecessary.

3.3.4NoActionImpactsHavingnofutureactionwiththesitewillresultinnochangestothecurrentairqualityatthecurrentproposedactionlocation.Foottrafficwillremainasis,butwillstillbelowerthanitwaswhenabridgewasinplace.AnydustupliftedbyfoottrafficcrossingFeverCreekwillbeofequalorlowervaluethanwhenabridgewasonthislocation.Ifnobridgereplacementshouldoccur,itislikelythatvehicletrafficwillincreaseduetosomechildrenbeingdriventoandfromschoolwhichwillincreaseairpollutants.Thesepollutantsarenothowevercontainedwithintheimmediatelocationoftheproposedactionsiteanditisdifficulttoconcludeadirectcorrelationbetweenairqualityofthesiteandincreasedvehiculartraffic.

3.4 Flora&Fauna3.4.1ExistingEnvironmentThefloraandfaunapresentatthesiteoftheFeverCreekpedestrianbridgeiscomposedofamixtureofnativeandinvasivespecies.

CommonflorathatispresentincludesDouglas-fir,Westernhemlock,andvinemaple,allofwhicharenativetotheregion(WashingtonNativePlantSociety2006).Someofthesespeciesareconsideredobligatewetlandspecies,meaningtheyareonlyfoundinwetlands,andthushelpwetlanddelineationinthearea.Theprimaryconcernforfloraintheareaistheabundanceofinvasivespecies,anddetrimentaleffectstowetlandflora.ThereigninginvasivespeciesareHimalayanblackberryandEnglishivy.FeverCreekisnotlistedasaprojectrestorationsitefor2017bytheCOB(COB2017),butareplacementofthepedestrianbridgewouldpromptremovalofinvasivespeciesandareintroductionofnativespecies.

Theprimaryfaunathatvisittheareaarelocalblack-taileddeerandraccoonspassingthroughandeatingsomeoftheflora(Relyea2007).FeverCreekisatributaryofWhatcomCreek,whichisafishbearingandspawningstream,butFeverCreekisnotastreamthathostssalmonspawningorotherfishpopulations(NSEA2016).Despitethelackofpresenceoffishinthecreek,thereispotentialforsalmonandotherfishpopulationstoswimupstreamduringpeakflows,makingitanareaofconcern.Takingthisintoaccount,reconstructionofthepedestrianbridgewouldneedtoensurethatpotentialfishhabitatisnotdegraded.

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

27

3.4.2ProposedActionImpactsImpactsonfloraandfaunabypursuingtheproposedactionofwouldbelargelybeneficialbecauseinstallingatemporarybridgeimmediatelywoulddecreasethenumberofpeoplewhocontinuetocrossthebridgeillegally.Florawouldseelessfoottraffic,thereforepromotinggrowthandfaunahabitatwouldnolongerseedegradationfromthefoottrafficitexperienceswithoutabridge.Limitedflowswouldinsurelesssedimententeringthestreamaffectingsalmonandfishpopulationfurtherdownstream.

MitigationsTheCOBParksandRecreationDepartmentwouldberesponsibleforremovingandmanaginginvasivespeciesinthearea,inaccordancewiththethreetoonemitigationrequiredbyBellingham'sCityComprehensivePlan.InvasivespeciessuchasHimalayanblackberryandEnglishivyarecurrentlyoverwhelmingnativespecieswouldneedtobetakenout.ThismanagementcouldcomeintheformofapartnershipwithRooseveltElementarySchoolineffortstoinvolvestudentsandspreadawarenessoflocalecosystems.

3.4.3AlternativeActionImpactsImpactsonfloraandfaunawouldbelikethosedescribedinsection3.4.2.1,butthereismoreofapotentialforhabitatdestructionasconstructionwouldcommenceassoonaspossible.Potentialhabitatdestructionwouldbeacceleratedbyerosionspurredbyhighamountsofwaterpresentintheformsofstreamflowandprecipitation.PeakflowswitherosionwouldcauseincreasedimpactdownstreamtofishpopulationsinWhatcomCreek.

MitigationMitigationeffortswouldbelikethosedescribedinsection2.4.2.2.RemovalofinvasivespeciesandareintroductionofnativeflorabytheCOBParksandRecreationDepartmentwouldenhancethehabitatforfauna.Withconstructionofthenewpedestrianbridgetakingplaceduringthewetseason,anyeffortstoremoveinvasivespecieswouldbepostponeduntillaterinthedryseasontominimizeerosioncausedbyhigherstreamflowrates.3.4.4NoActionImpacts TakingnoactionandleavingtheFeverCreekpedestrianbridgesiteasiswouldallowinvasivespeciestogrowunregulatedandwoulddetractfromnativespecies'abilitiestothrive.Illegalcrossingofthestreamthatoccurshaspotentialtodegradepotentialhabitatsforfloraandfaunaalike.

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

28

4.0BuiltEnvironmentElement

4.1Transportation4.1.1ExistingConditionsTheFeverCreekpedestrianandbikebridgeisahigh-volumebridge.Numberofpeoplepassingoverthebridgeaveragearoundonehundredandfifty.Trendsshowhigherusageinspringandwinterandlowerusageinwinterandthelowestinsummer(CityofBellingham,2015).Evenafterthebridgeremovedthesitestilllooksused.Thesitehastrampledvegetationandhumangarbage.Soildisturbanceslookedlikepeoplehadbeencrossingthroughthestream.Therewasamakeshiftbridgebuilt.TheCityofBellingham’srecommendedalternativeofwaitingtillsummertostartconstructionleavesthecreekvulnerableforanextendedperiodoftimes.Safetyisaconcernasflowratesrisewithchildrentryingtopassthroughthecreek,andalternativerouteslackingsidewalks.

Figure6.FeverCreekPedestrianCounts-GraphdisplaysnumberofpedestrianpassingovertheFeverCreekBridgeduringtheseasonsoftheyear.Trendsshowthatspringhavethehighestcrossingcountswhilesummerhasthelowestcrossingcounts(CityofBellingham,2015;CreatedbyNovellaRandall).

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

29

4.1.2 ProposedActionImpactsTheproposedactionwouldleavethecreekvulnerabletohumanintrusionformultiplemonths before summer 2017. Human traffic through the stream will cause erosion,vegetation disturbance, and possible stream contamination. Effects of this will beadverse.

MitigationsAtemporarybridgecouldalleviatesomeoftheissuesandkeeppeopleonthepath.Anotheroptioncouldbebetterbarricadestokeepthepublicfromcrossingthestream.Theseeffortswouldalleviatenegativeinteractionsbetweenthepublicandthecreek.

4.1.3AlternativeActionImpactsFeverCreekwouldbenefitfromhavingconstructionstartassoonaspossible.Withacrewonthesite,thetrailwouldbeclosedoffmoreofficiallyandthemovementofpedestriansandbikerswouldstop,thusreducingtheimpactonthesurroundingenvironment.

MitigationsNomitigationstepswouldbeneededbecauseofaneutraleffectofnothavingpeoplepassthroughthesite.

4.1.4NoActionImpactsImpactsofnoactionwouldbelikethosediscussedin6.1.1,butindefinitely.Schoolchildrenandthoseusingthebridgewouldintrudethroughthecreekcausingadverseeffects.

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

30

5.0ImpactMatrixTable5showsthedecisionmatrix,whichoutlinesthesignificantimpactstoenvironmentalelementsanalyzedfortheproposed,alternative,andnoactionalternatives.

Table5:DecisionMatrix

SEPAElements ProposedAction AlternativeAction NoAction

Earth -2 -1 -1

Water +1 -2 -1

Air -1 -1 0

Flora&Fauna +2 +1 -2

Transportation -1 +1 -2

Total -1 -2 -6

Table6:DecisionMatrixKey

1.6RecommendationsWerecommendthattheproposedactionispursuedasitwouldreduceenvironmentalimpactswhencomparedtothealternativeandnoactionplans.ReplacingtheFeverCreekpedestrianbridgewouldhelpprovideasafepathforelementaryschoolstudentstocommuteonfoottoandfromschooleachdaybyminimizingtimespentawayfrommotorizedtraffic.

6.0ConclusionandRecommendationReplacementofFeverCreekpedestrianbridgeisimportantforthecommunitytoprovideasafe,reliable,andenvironmentallyresponsiblebridgerunningeasttowestbetweenSuperiorStreetandMichiganStreet.Theformerbridgewasremovedprimarilyduetopublicsafetyconcerns.Throughreplacingthebridge,wehopetopreserveformermethodsoftravelwithintheRooseveltneighborhood,especiallyforstudentsofRooseveltElementarySchool.Aprimary

Score Impact

+1to+2 PositiveImpact(2beingsignificant)

-1to-2NegativeImpact

(2beingsignificant)

0 ZeroImpact

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

31

concernforreplacementischildrenforcedtowalktoRooseveltElementarySchoolandsharestreetswithmotorizedtrafficwithoutsidewalks.

Weoutlinedthreeactionsforthissite:proposedaction,alternativeaction,andnoaction.TheproposedactionisputtingatemporarybridgeaccordingtostandardsoftheCOBParksandRecreationDepartmentimmediatelyuponapproval,andtheconstructionofapermanentbridgebasedoffofCOBdesignstandardsfollowingtheendoftheacademicyearstartingJune16,2016.Thealternativeactionistoinstallapermanentbridgeimmediately,butmitigateforenvironmentalconditionspresentduringthewinter.Thelastoption,noaction,istoleavethesiteofFeverCreekpedestrianbridgeasitisinitscurrentstate.Afterlookingatenvironmentalelementsincludingearth,water,air,floraandfauna,andtransportation,wedeterminedtheproposedactiontobethebestoptionforthislocation.Weconcludethatatemporarybridgeshouldbeplacedimmediatelyinthesite,theninstallapermanentbridgeinJune.

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

32

7.0GlossaryHydric-characterizedby,relatingto,orrequiringanabundanceofmoistureIn-situ-inthenaturalororiginalpositionorplaceNoxious-physicallyharmfulordestructivetolivingbeingsLoam-asoilconsistingofafriablemixtureofvaryingproportionsofclay,silt,andsandSiltLoam-soilcontainingnotlessthan70percentsiltandclayandnotlessthan20percentsandSubgrade-asurfaceofearthorrockleveledofftoreceiveafoundation(asofaroad)Wetland-landorareas(asmarshesorswamps)thatarecoveredoftenintermittentlywithshallowwaterorhavesoilsaturatedwithmoisture

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

33

8.0ReferencesAirNow.(n.d.).AirQualityIndex.Retrievedfrom

https://airnow.gov/index.cfm?action=aqibasics.aqiAustin,G.(2016,October).FeverCreekbridgereplacementinfosession.[PowerPointandlive

lecture].Retrievedfromprivatenotes.AmericanLungAssociation.(2016).StateoftheAir2016.Chicago,IL.Burwell,D.(2016).BellinghamFeverCreekPedestrianBridge:GeotechnicalInformation.

Bellingham,WA:RH2Engineering,Inc.September.CityofBellingham.(2016).RestorationProjectSites2017[Map].Bellingham,WA:Cityof

Bellingham.CityofBellingham.(2015).PedestrianandBicycleTrailUserCounts.InCityofBellingham.

Retrievedfromhttps://www.cob.org/documents/parks/parks-trails/trail-user-count/fever-creek-bridge-09-01-15-to-09-20-15.pdf

Coronado,C.(2016).NSEASpawningGroundsSurveys2015.Retrievedfromhttps://static1.squarespace.com/static/552eaedce4b0dc86eeb1cddd/t/5798edc5725e25f85fd4b699/1469640156394/Report+2015+Final.pdf

ElementSolutions,G.Austin,&CityofBellinghamParksandRecreation.(2016).CityofBellinghamCriticalAreasReportWetlandDelineation.

Harris,M.(2016).CityclosespedestrianbridgeatFeverCreek.Retrievedfromhttps://www.cob.org/news/Pages/features/City-closes-pedestrian-bridge-at-Fever-Creek.aspx

Helmer,K.,etal.(n.d.)RegulatedandAirToxicExhaustEmissionsfromNonroadDieselEnginesandEquipment.Washington,DC:UnitedStatesEnvironmentalProtectionAgency.

IntergovernmentalPanelonClimateChange.(2007).IPCCFourthAssessmentReport:ClimateChange2007.Retrievedfromhttps://www.ipcc.ch/publications_and_data/ar4/wg1/en/ch2s2-10-2.html

Klungland,M.W.andM.McArthur.(1989).SoilSurveyofSkagitCountyArea,Washington,SoilConservationService,U.S.D.A.,WashingtonStateDepartmentofNaturalResources,andWashingtonStateUniversity,AgricultureResearchCenter.

NationalCenterforEnvironmentalAssessment:DieselTeam.(2002).HealthAssessmentDocumentforDieselEngineExhaust.Washington,DC:UnitedStatesEnvironmentalProtectionAgency.

NorthwestCleanAirAgency.(2016).AirQualityCenter.Retrievedfromhttp://nwcleanairwa.gov/air-quality-center/

O'Neil,G.(2016).Biofuels:EmissionsandAirQuality.[Powerpointandlivelecture].Retrievedfromprivatenotes.

PortofBellingham.(2010).TheWaterfrontDistrictRedevelopmentProject(FormerlyKnownasNewWhatcomRedevelopmentProject)FinalEnvironmentalImpactStatement.(FinalDraft).Bellingham,WA.

Relyea,K.(2007).Black-taileddeereasytospotlocally.TheBellinghamHerald.Retrievedfromhttp://www.bellinghamherald.com/sports/outdoors/article22195617.html

EnvironmentalImpactAssessment FeverCreekBridgeReplacement

34

Robertson,M.J.,Scruton,D.A.,Gregory,R.S.,&Clarke,K.D.(2006).Effectofsuspendedsedimentonfreshwaterfishandfishhabitat(Canada,FisheriesandOceansCanada,ScienceBranch).St.Johns,NL:ScienceBranch,FisheriesandOceans.

Shannahan,J.,LaCroix,R.,Cusimano,B.,&Hood,S.(2004).WhatcomCreekFecalColiformTotalMaximumDailyLoadStudy.RetrievedOctober23,2016,fromhttps://fortress.wa.gov/ecy/publications/documents/0403015.pdf

UnitedStatesEnvironmentalProtectionAgency.(2015).AirQuality–CitiesandCounties[Datafile].Retrievedfromhttps://www.epa.gov/air-trends/air-quality-cities-and-counties

UnitedStatesEnvironmentalProtectionAgency.(2016).NAAQSTable.Washington,D.C.Retreivedfromhttps://www.epa.gov/criteria-air-pollutants/naaqs-table

WashingtonNativePlantSociety.(2006).NativePlantsofWesternWashington:TheNaturalWaytoGrow[Brochure].Seattle,WA:WashingtonNativePlantSociety.

WashingtonStateDepartmentofEcology.(2016).AirMonitoringSites.Retrievedfromhttps://fortress.wa.gov/ecy/enviwa/.

WashingtonStateDepartmentofEcology.(2016).MethodsforDustControl.Olympia,WA.Retrievedfromhttps://fortress.wa.gov/ecy/publications/summarypages/96433.html

WashingtonStateDepartmentofTransportation(WSDOT).(2008).WSDOTGuidanceonCompensatoryMitigationAreaCalculation(USA,DOT,WSDOT).Washington.

Wilson,A.(1993March/April).CementandConcrete:EnvironmentalConsiderations.EnvironmentalBuildingNews,2(2),1-11.