entitlement process - rail~volution

Post on 12-Sep-2021

14 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

CODE STUDIO | Rail-Volution 2008 Miami Beach 1

Entitlement Process:The Importance of Transparency and Certainty in Development Regulations

Lee D. Einsweiler, AICPC O D E S T U D I O

Austin TX

CODE STUDIO | Rail-Volution 2008 Miami Beach 2

Transparency and Certainty

Doesn’t Exist !Many Politician’s Feel an Obligation to be “Hand’s On” in their Decision-MakingOften Missing Political, Management and/or Technical (Planning) Leadership

As Nancy Reagan Taught Us –Sometimes Ya Gotta “Just Say No!”

CODE STUDIO | Rail-Volution 2008 Miami Beach 3

Typical Conflicts

Zoning and SubdivisionPublic Realm Improvements

Planning and Public WorksThe “Silo” Effect

Short Term and Long TermPhasing, Changing Uses Over Time, Intensification

CODE STUDIO | Rail-Volution 2008 Miami Beach 4

UrbanAdvantage

CODE STUDIO | Rail-Volution 2008 Miami Beach 5

UrbanAdvantage

CODE STUDIO | Rail-Volution 2008 Miami Beach 6

UrbanAdvantage

CODE STUDIO | Rail-Volution 2008 Miami Beach 7

UrbanAdvantage

CODE STUDIO | Rail-Volution 2008 Miami Beach 8

UrbanAdvantage

CODE STUDIO | Rail-Volution 2008 Miami Beach 9

UrbanAdvantage

CODE STUDIO | Rail-Volution 2008 Miami Beach 10

Is Walkability Enough?

CODE STUDIO | Rail-Volution 2008 Miami Beach 11

Urban? Suburban?

PS – this is a town center!

CODE STUDIO | Rail-Volution 2008 Miami Beach 12

A Common Problem

Reliance on One-Time Negotiated Solutions

Planned Development“Waivers and conditions”Variances (especially ones without “hardship”)

CODE STUDIO | Rail-Volution 2008 Miami Beach 13

A Common Problem

If you’re not happy with the results of your Code . . .

REVISE THE CODE !

CODE STUDIO | Rail-Volution 2008 Miami Beach 14

Customized Zoning

Planned DevelopmentIntended to be higher quality, innovative projects that don’t fit existing districtsNOT intended for circumventing requirements or reducing quality of development

Developer Gets What They NeedNeighborhood Has a Hand in Crafting the Solution

CODE STUDIO | Rail-Volution 2008 Miami Beach 15

Customized Zoning

How Could This Possibly be Bad?Fairness and equity questionsConsistent treatment of applicants, situationsDifficulty in enforcement, trackingHard-won compromise not available for all

Street cross-sectionsParking reductions

CODE STUDIO | Rail-Volution 2008 Miami Beach 16

Some Better Examples

DenverMain Street zoning

Dallas Cherokee multi-station agreementTrinity River planned development

Sarasota CountyRedevelopment area planned development

CODE STUDIO | Rail-Volution 2008 Miami Beach 17

Main Street Zoning

Placement Height

Transparency Screening

CODE STUDIO | Rail-Volution 2008 Miami Beach 18

Planned Mixed Use Infill

CODE STUDIO | Rail-Volution 2008 Miami Beach 19

The Problem

Balancing neighborhood interest in protection of perceived character with the need for reinvestment, intensification

CODE STUDIO | Rail-Volution 2008 Miami Beach 20

Planning at 30,000 Feet

CODE STUDIO | Rail-Volution 2008 Miami Beach 21

Planning at 20,000 Feet

CODE STUDIO | Rail-Volution 2008 Miami Beach 22

Planning at 10,000 Feet

CODE STUDIO | Rail-Volution 2008 Miami Beach 23

Code Approaches

USE SEPARATIONOriginal Euclidean Codes

PERFORMANCEImpact mitigation

FORMLong-term view of mixed use

ARCHITECTUREDesign guidelines, pattern books

CODE STUDIO | Rail-Volution 2008 Miami Beach 24

Coded Outcome

CODE STUDIO | Rail-Volution 2008 Miami Beach 25

Form Standards

CODE STUDIO | Rail-Volution 2008 Miami Beach 26

Public Realm Improvements

CODE STUDIO | Rail-Volution 2008 Miami Beach 27

Floor Area Ratio

“Pat of Butter”

CODE STUDIO | Rail-Volution 2008 Miami Beach 28

Form versus Incentives

CODE STUDIO | Rail-Volution 2008 Miami Beach 29

Theory versus Reality

Plans Often Cover Too Large an AreaPlans (and even Codes) Sometimes Do Not Include Adequate Public InvolvementSimple Planning Concepts Often Get Complex When Forced to Deal With:

Property rightsState and federal legislation

CODE STUDIO | Rail-Volution 2008 Miami Beach 30

Theory versus Reality

CODE STUDIO | Rail-Volution 2008 Miami Beach 31

Zoning “Value”

DownzoningAppearance versus reality

Zoning can create value while protecting character

Historic districtsMcMansion ordinances

CODE STUDIO | Rail-Volution 2008 Miami Beach 32

Timing/Extent of Involvement

Neighbors?Up front during planning

Policy-makersConfirmation of planning

Technical StaffThroughout, including application approval following planning stage

CODE STUDIO | Rail-Volution 2008 Miami Beach 33

Preparing New Zoning

Need to Model Outcomes: in 3-D, if possible

Height, building placement, bulk planesFinancial pro formaParking

One Reason All Sides Like Form-Based Codes is Their Detailed Planning of Results – With Codes That Match

CODE STUDIO | Rail-Volution 2008 Miami Beach 34

Pro Forma Testing

CODE STUDIO | Rail-Volution 2008 Miami Beach 35

Pro Forma Testing

CODE STUDIO | Rail-Volution 2008 Miami Beach 36

Pro Forma Testing

CODE STUDIO | Rail-Volution 2008 Miami Beach 37

Common Mistakes

Expecting a Miracle . . .Montgomery County TOD and mixed use zones established in the 70’/80’s – 20+ years ago

Planning Through ZoningZoning should IMPLEMENT plans, not make them

Borrowing Code From OthersGood Code is PLACE-SPECIFIC

CODE STUDIO | Rail-Volution 2008 Miami Beach 38

Contact Information

Lee D. Einsweiler, AICPC O D E S T U D I O

(512) 478-2200lee@code-studio.com

top related