enovia smarteam

Post on 18-Nov-2014

308 Views

Category:

Documents

11 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

N/C SYED HASSAN MAHMOOD WASTI 060901

N/C BILAL AHMED 060907

2

SEQUENCE1. Scope2. Product lifecycle management3. Integration with modeling softwares4. Editorial options5. Program management5. Program management6. BOM Management7. Multi-site8. Community workspace9. Workflow10. User interface11. SMARTEAM in aerospace industry12. Use in PAKISTAN’s defense sector13. Conclusion14. Recommendations

3

Scope

Understanding the different features and tools available in ENOVIA

SMARTEAM® and implementing them.SMARTEAM® and implementing them.

4

ENOVIA SMARTEAM IS A PRODUCT

LIFECYCLE MANAGEMENT LIFECYCLE MANAGEMENT

SOLUTION SOFTWARE

5

PRODUCTLIFE CYCLE

MANAGEMENT� Managing the entire lifecycle of a product from its

conception, through design and manufacture, to service and disposal.

� PLM integrates people, data, processes and business � PLM integrates people, data, processes and business systems

� Provides a product information backbone for companies and their extended enterprise.

6

Production processConception

ApprovalCustomer feedback/ after sales services

New concept introducedCustomer

feedback needs to be recorded

Design

Cost benefit analysis

Manufacturing

Marketing

7

Different dept. need of

more info sharing

Accounts dept, needs lots of

info

Raw material. Acquisition of machines, technology etc

Need up to date info for better

marketing campaign

8

INTEGRATION WITH MODELING

SOFTWARESPROBLEMS

� PLM solution softwaresnot easily integrate able with CAD softwareswith CAD softwares

� Different softwares usage created problems

� Difficulties for Engineering based product design

� E.g. A-380 delay

9

INTEGRATION WITH MODELING

SOFTWARESSOLUTION

� Easily integrated with CATIA, SOLID EDGE ETCETC

� Allows easy check in and check out from CATIA directly

� Saves time

� Files are directly opened in CATIA

10

INTEGRATION WITH MODELING

SOFTWARES� Promotes

standardization

� Also integrate able with MS officeMS office

� So it provides a one click solution to PLM problem

11

EDITORIAL OPTIONSProblems

� Product manager (editor) has little control over the security of database.

� No or little control over the level of access given to � No or little control over the level of access given to different actors.

� Under qualified personnel might make changes in the design.

� E.g. a junior analyst might work on and change a vital part.

12

EDITORIAL OPTIONSSolution

� Full access to editor at all levels

� Notification before every � Notification before every major task

� Decide the level of access

� Part can’t be released without his approval

� Create different vaults

13

ExampleEditor

Aerodynamics Structures

Full access

Full access to structural

parts

Full access to aerodynamic

parts

Head of Dept.

Senior designer

Junior designer

Head of Dept

Senior designer

Junior designer

14

parts parts

Limited access

More access but not full access to

aero parts

More access but not full

access to struc parts

Limited access

PROGRAM MANAGEMENTProblems

� One of the most difficult parts of production process

� Multiple projects� Multiple projects

� Misinformation can cause serious errors

� High cost associated with manual PM.

� Low program development efficiency

� Low rate of production

15

PROGRAM MANAGEMENTSOLUTION

� Multiple projects

� Timelines and tasks

Resource management� Resource management

� Bottlenecks identified and remove

� Tracking and monitoring of multiple concurrent projects

16

PROGRAM MANAGEMENT� Provides information using various charts like Gantt

charts etc.

� Helps in decision making

� Allows us to use existing project knowledge and � Allows us to use existing project knowledge and database

� Provides project update like Draft, Initiated, In Work, Completed, Approved, On Hold, Canceled.

17

EXAMPLE

18

BOM (BILL OF MATERIAL)

MANAGEMENTPROBLEMS

� Non availability of BOM at any specific time

� Over stocking

Under stocking� Under stocking

� Difficulty in decision making

19

BOM (BILL OF MATERIAL)

MANAGEMENT� A bill is generated at the

completion of each part.� Shows the maturity of product

at any given time which ensures appropriate stocking

� Accelerates production process� Accelerates production process� Saves time and reduces errors� Allows comparison of BOM of

two parts� Shares information with

suppliers� Ensures up to date collaboration

with suppliers

20

BOM (BILL OF MATERIAL)

MANAGEMENT

21

MULTI-SITEProblem

� Managing data at several remote sites simultaneously, without compromising data compromising data integrity

� Secure data transfer

� Need to transfer large chunks of data, but the connection is too slow, especially when large CAD assemblies are involved

22

MULTI-SITE� Need to have

information available and accessible all the time, but the WAN time, but the WAN connection is highly unreliable

� Users find themselves unable to work when the connection between sites fails

23

MULTI-SITESolution

� provides us Safe product data management solution solution

� Maintains Database Data integrity by using Oracle Replication functionality

� Maintains Vault Data integrity by using RepliWeb functionality

24

MULTI-SITE� Periodic DB synchronization which ensures that all

sites are identical

� Object ownership mechanism within the data modelmodel

� Password encryption

� Data transfer encryption

� Allows multi tasking

� Faster data transfer

� Allows working even when the system is down

25

MULTI-SITE� Periodic file & meta-data

replication

� Lifecycle permitted on local sitelocal site

� Users can view files from a remote site

� Lifecycle on object from a remote site is permitted if given ownership

26

MULTI-SITE� All objects owned by the

site can be freely used

� Users can view or copy only those objects that only those objects that are not owned by their site

� Replication will update remote sites with changes after connection is re-established

27

COMMUNITY WORKSPACEPROBLEM

� Customers are integral part of production cycle.

� Customer feedback

� Involving customers in product development

� Limited access to customers

� Feedback needed to reduce cost of changes

28

COMMUNITY WORKSPACESOLUTION

� Allows Project-oriented, product information sharing across the supply chain

� No compromise on technical inegrity� No compromise on technical inegrity

� Viewer option

� Through e-mail

� Link provided on SMARTEAM

� Creates organized database regarding customer feedback

29

COMMUNITY WORKSPACE� Publishes data from

SMARTEAM which then generates an e-mail invitation

� Receives e-mail invitation� Receives e-mail invitation

� Accesses community folder from invitation

� Makes changes in the product

� Reviews changes

� The process continues

30

WORK FLOWPROBLEMS

� Production processes are usually linked to each other

� Usually processes are interlinked with one another

Delay in one process might cause delay in another� Delay in one process might cause delay in another

� The workers are often unaware of the previous and following process

� Work flow is difficult to analyze and change

31

WORKFLOWSolution

� Provides easy to use flow chart graphical designer

� Provides alternative work � Provides alternative work path

� Tracks the workflow

� System alerts for work delay

� Provides worker with information on forthcoming processes.

32

Example (Engineering change

order)

33

Example (Engineering change

order)

Reject

34

Example (Engineering change

order)

Reject

Reject

35

36

IMPORTING CATIA FILE IN

SMARTEAMI. Toolbar>SMARTEAM>

Save

II. SMARTEAM ® interface now opensinterface now opens

III. Name and catalogue number

IV. Comments

37

EDITING PARTSI. Right click on the part

II. Select Check Out

III. Carry out changes

IV. Toolbar>Smarteam>CheckINIV. Toolbar>Smarteam>CheckIN

V. Comments

38

RELEASING A DOCUMENTI. Supervisor checks the

part

II. Tool bar>SmarTeam>Lifecycle > Release>Lifecycle > Release

III. Part is now ready for manufacturing

39

USER AUTHORIZATIONI. User

maintenance>administrative dialogue box

II. Create a new projectII. Create a new project

III. In the user authorization window select the system operation that each

40

USER AUTHORIZATIONDifferent groups

41

One click authorization

solution

PROGRAM MANAGEMENT

Pie chart

42

Pie chart depicts

program status

Project’s associated information

Project’s Details

BOM Different level of product maturity

43

COMMUNITY WORKSPACEEasy to use

menu

44

Picture shows no technical

details

WORK FLOWBlocks can be

picked and inserted

45

Click and drag to draw a path

SMARTEAM IN AROSPACE

INDUSTRY� Currently used by:

1. BOEING

2. DASSAULT AVIATION

3. Aircraft Engineering 3. Aircraft Engineering Corp. (AEC) suppliers of LOCKHEED MARTIN and BOEING

46

SMARTEAM IN AROSPACE

INDUSTRY� MICROTURBO , one of

the world’s leading producers of turbines used in airplanes, used in airplanes, helicopters as well as for missile and target propulsion

� BELL Industry

� ENAER, a major supplier to Embraer Brazil

47

USE IN PAKISTAN’S DEFENCE

SECTOR� Given the huge setup of

different defense sectors SMARTEAM can be used in:

Pakistan Aeronautical 1. Pakistan Aeronautical Complex (PAC), Kamra

2. National Defense Complex (NDC)

3. Air Weapon Complex (AWC)

48

CONCLUSION� ENOVIA SMARTEAM is a complete PLM solution

software whose benefits are innumerable and therefore it should be used by all major producers in PAKISTAN.PAKISTAN.

49

RECOMMENDATIONS� Currently demo version of SMARTEAM is installed a

full version should be installed

� SMARTEAM and CATIA should be installed in more computers. Currently they are installed in only 2 PCscomputers. Currently they are installed in only 2 PCs

� Future students should be encouraged to continue work on SMARTEAM and learn more about it.

� An online course is available. To learn more about SMARTEAM this course may be taken.

50

QUESTIONS?QUESTIONS?

51

top related