ENERGY AUDITon New University of Plovdiv Building - Block A
Case studies work by STE Expert team in collaboration with Bulgarian EEA
Phare twinning project BG/2004/IB/EY/01
Institutional Building at the Energy Efficiency Agency
A
Block A ( wing on left side ) :
1. Individual heating sub-station ( database )
2. Utilization ( representative )
Phare twinning project BG/2004/IB/EY/01
entrata
Blocco A
Institutional Building at the Energy Efficiency Agency
Plant ground areaPlant ground area LBALBA Heated floorHeated floor Gross VolumeGross Volume Net heated VolumeNet heated Volume
m²m² m²m² m²m² m³m³ m³m³
5.4675.467 3.1153.115 5.2935.293 22.19822.198 15.538,615.538,6
Phare twinning project BG/2004/IB/EY/01
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
1. Intonaco
2. Pannello cemento
3. Pannello pietra
1. vetro
2. camera
3. vetro1,60
2,42
Parete verticale
Vetrate
Institutional Building at the Energy Efficiency Agency
Cornice verticale
1. ponte termico:
2. teoria delle alette
3. Keq. = 1,91 W/ mq*K
Phare twinning project BG/2004/IB/EY/01
Institutional Building at the Energy Efficiency Agency
1. Solaio cemento
2. Camera d’aria
3. Basamento
1. Solaio cemento
2. Camera d’aria
3. Isolante in fibra
4. Solaio cemento
Phare twinning project BG/2004/IB/EY/01
Solaio interrato
Solaio a cielo
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
LT
A2
A1
A4
A3
R2
Rs
e3 R3
Rs
i3
R1
Rs
i2
Rs
i4
R4 Applicazione del modello resistivo:
1. Analoghi risultati della EEA in Mladost
2. Risultati in linea con riferimenti generali
R3, A3
R2, A2
θe
R1, A1
θsi
2
θse
1
Rs
e3δвс
Rsi
2
Rsi
3Rsi
1
Rs
e2
Rs
e1
θ
i
θu
Institutional Building at the Energy Efficiency Agency
Centrale termica:
1. Bassa temperatura entrata
( 60 °C contro i 80 °C)
1. Cattive condizioni dello scambiatore
Phare twinning project BG/2004/IB/EY/01
Institutional Building at the Energy Efficiency Agency
Radiatori:
1. Con copertura in legno si abbassa l’efficienza di emissione
Phare twinning project BG/2004/IB/EY/01
Institutional Building at the Energy Efficiency Agency
Sistema di condizionamento:
1. Tipologie differenti di potenza e vetustà
2. Presenti solo in alcuni ambienti
3. ( studi dei professori )
Phare twinning project BG/2004/IB/EY/01
Institutional Building at the Energy Efficiency Agency
Sistema di illuminazione
1. Lampade a medio consumo
2. Utilizzo consistente degli apparati dato l’ombreggiamento degli edifici a corte
Phare twinning project BG/2004/IB/EY/01
Institutional Building at the Energy Efficiency Agency
Distribution of Electricity demands
10% 12%
61%
17%
Lighting
Climatization
Power station
Office appliances
Phare twinning project BG/2004/IB/EY/01
Distribution of Energy expenses
31%
69%
Electricity
Heating
distribuzione dei consumi per tipologia
Institutional Building at the Energy Efficiency Agency
0
100.000
200.000
300.000
400.000
2003 2004 2005 2006
Electricity consumption
0
20.000
40.000
60.000
2003 2004 2005 2006
Electricity expenses (BGN) 2003-2006
Phare twinning project BG/2004/IB/EY/01
Consumi reali nel periodo 2003-2006
Institutional Building at the Energy Efficiency Agency
MonthMonth
Average Average monthly monthly temperattemperat
ure of ure of external external
airair
Electric Energy (1)Electric Energy (1)
2003-20062003-2006Central heatingCentral heating
Water supplyWater supplySubstation “A” Substation “A”
consumptioconsumption from D.H. n from D.H.
networknetwork
Room heatingRoom heating UHW (2)UHW (2)
оо
СС
Day Day DegrDegreeee
МWhМWh BGNBGN MWhMWh BGNBGN MWhMWhBB
GGNN
MMWWhhWWhh
BGNBGN mm33 BGNBGN
20062006 2.4832.483 297,73297,73 36.91836.918 348,04348,04 27.49527.495 66 430430
20032003 2.5512.551 317,45317,45 39.36339.363 366,65366,65 28.96528.965 66 474474
20052005 2.6642.664 350,56350,56 45.27445.274 394,24394,24 31.14531.145 66 474474
20042004 2.4162.416 369.14369.14 51.67051.670 393,54393,54 34.66634.666 66 528528
Phare twinning project BG/2004/IB/EY/01
Valori medi 2003-2006
gradigiorno 2500;energia elettrica 333 MWh; termica 376 MWh
Institutional Building at the Energy Efficiency Agency
Provincia autonoma di Bolzano
Phare twinning project BG/2004/IB/EY/01
Software casaclima
1. Semplicità di confronto con altri software
2. Open source quindi confrontabile assieme a terzi ( EEA )
3. Aggiornato su fabbisogni di raffrescamento ed energia primaria ( forma semplificata )
Institutional Building at the Energy Efficiency Agency
Provincia autonoma di Bolzano
Phare twinning project BG/2004/IB/EY/01
Software casaclima
1. Inserimento dati dimensionali 2. dati climatici a databaseInstitutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Inserimento di
1. Tipologie costruttive 2. superfici di scambio termico
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Inserimento di
1. Dettagli caratteristiche tecniche ( spessori- trasmittanze termiche )Institutional Building at the Energy Efficiency Agency
Provincia autonoma di Bolzano
Phare twinning project BG/2004/IB/EY/01
Output
1. Fabbisogni specifici
2. Potenze specifiche
3. Classificazione su protocollo casaclima
( Bolzano e località riferita )
Provincia autonoma di Bolzano
Phare twinning project BG/2004/IB/EY/01
Input
1. Caratteristiche impianti elettrici
2. raffrescamento
Correzione
1. Su dati reali i calcoli sono stati integrati
Institutional Building at the Energy Efficiency Agency
Provincia autonoma di Bolzano
Phare twinning project BG/2004/IB/EY/01
Output
1. Fabbisogni specifici
2. Potenze specifiche
3. Classificazione su protocollo casaclima
( Bolzano e località riferita )
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Energy Efficiency Measures
Existing situation
Proposed situation
Savings
Profitability analysis (1)
Costs savings Pay-backtime
kWh kWh kWh % BGN BGN
Wall insulation (heat) 683.371 414.627 268.774 39,3 138.900,00 23.649,00 5,95,9
Replacement of woodwork (heat)
683.371 577.615 105.756 15,5 253.678,00 9.306,00 27,327,3
TOTAL (heat) 374.530374.530 54,854,8 392.578392.578 32.95532.955 11,911,9
Misure correttive di efficienza energetica proposte
1
2
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Energy Efficiency Measures
Existing situation
Proposed situation
Savings
Profitability analysis
Costs savings Pay-backtime
kWh kWh kWh % BGN BGN
Heat exch. Station refurbishing (heat)
375.600 300.480 75.121 20
25.75025.750
6.610,00
3,83,8Heat exch. Station refurbishing (electric)
13.140 11.856 1.284 9,7 180,00
Dismantling of radiator’s wooden case (heat)
165.000 156.750 8.250 5 2.8002.800 726,00 3,93,9
Thermostatic valves installation (heat)
168.000 142.800 25.200 15 6.3006.300 2.218,00 2,82,8
Lighting plant refurbishing(electric)
117.383 54.057 63.326 54 48.31548.315 8.866,00 5,45,4
TOTAL (heat) 108.571 n.d. n.d. 9.554,00 n.d.
TOTAL (electric) 64.610 n.d. n.d. 9.046,00 n.d.
Misure correttive di efficienza energetica proposte
3
4
5
6
7
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Conclusioni e suggerimenti
1. Sul profilo tecnico la conoscenza e il potenziale utilizzo di più software aumentano la qualità del risultato finale riducendo la probabilità di errore umano che nel caso di raccolta ed elaborazione dati è significativo
2. Gli interventi di efficienza energetica, contestualizzati nell’ambito territoriale ( costi energetici della Bulgaria ) si evidenziano comunque come interessanti sul profilo economico finanziario oltre che ambientale ( isolamento a cappotto, valvole termostatiche,..)
3. La competenza in materia energetica dovrebbe essere vincolante in fase progettuale poiché ai casi come questo, concorrente alle aspettative architettoniche ( in cui la EEA è in grado di svolgere un ruolo di riferimento istituzionale )
Institutional Building at the Energy Efficiency Agency