Energy Economics

http://www.economist.com/news/briefing/21587782-europes-electricity-providers-face-existential-threat-how-lose-half-trillion-euros

• Commercial and industrial customers are increasingly separating from the grid to avoid the tax to pay for renewable energy expansion.

• Wall Street Journal, 2014.03.02:– 16 percent of German companies are now

energy self-sufficient – Another 23 percent of businesses say they

plan to become energy self-sufficient in the near future.

• companies that avoid the surcharge and receive subsidies can cut their electricity bills by around 50%.

Michael Salcher, head of the energy and natural-resources practice at consultancy KPMG Germany

http://webcache.googleusercontent.com/search?q=cache%3Aonline.wsj.com%2Fnews%2Farticles%2FSB10001424052702304899704579390871434033460&rlz=1C1MSIM_enCZ567CZ567&oq=cache%3Aonline.wsj.com%2Fnews%2Farticles%2FSB10001424052702304899704579390871434033460&aqs=chrome..69i57j69i58.2983j0j4&sourceid=chrome&espv=210&es_sm=93&ie=UTF-8

• Electrical self-reliance has its share of drawbacks.– requires large initial investments – manage equipment unrelated to core

business

• Organization of electricity markets1. Liberalization

2. Transmission pricing

• Nodal and zonal dispatch in meshed networks

• Peak-load pricing

900MW@20$/MWh

800MW@50$/MWh

900MW@20$/MWh

800MW@50$/MWh

Nodal pricing Zonal pricing

A B

400MW 300MW 400MW 300MW

A B

A B

900MW@20$/MWh

+ @35$/MWh- (@-10$/MWh

400MW 300MW

@20$/MWh @20$/MWh

300MW400MW 300MW

@20$/MWh @20$/MWh

300MW

Nodal pricing Zonal pricing

800MW@50$/MWh

+ @70$/MWh- (@-20$/MWh

A B

Bids for ancillary market (balancing market)

900MW@20$/MWh

+ @35$/MWh- (@-10$/MWh

800MW@50$/MWh

+ @70$/MWh- (@-20$/MWh

A B

900MW@20$/MWh

+ @35$/MWh- (@-10$/MWh

400MW 300MW

@20$/MWh @50$/MWh

200MW400MW 300MW

@20$/MWh @20$/MWh

300MW

Nodal pricing Zonal pricing

800MW@50$/MWh

+ @70$/MWh- (@-20$/MWh

A B

900MW@20$/MWh

+ @35$/MWh- (@-10$/MWh

800MW@50$/MWh

+ @70$/MWh- (@-20$/MWh

Max: 200MWMax: 200MW

@30$/MWh

Price of transmission?

20

50

900 1700700

1st dispatch

Cost of $20x600+$50x100 =17.000

A B

900MW@20$/MWh

+ @35$/MWh- (@-10$/MWh

400MW 300MW

@20$/MWh @50$/MWh

200MW400MW 300MW

@20$/MWh @20$/MWh

200MW

Nodal pricing Zonal pricing

800MW@50$/MWh

+ @70$/MWh- (@-20$/MWh

A B

900MW@20$/MWh

+ @35$/MWh- (@-10$/MWh

800MW@50$/MWh

+ @70$/MWh- (@-20$/MWh

Max: 200MWMax: 200MW

@30$/MWh

Price of transmission?

20

50

900 1700700

-100MW @-10$= +1.000$

+100MW @70$= -7.000$

Cost of 6.000

1st dispatch

2nd dispatch

Cost of 14.000

A B

900MW@20$/MWh

+ @35$/MWh- (@-10$/MWh

400MW 300MW

@20$/MWh @50$/MWh

200MW400MW 300MW

@30$/MWh @30$/MWh

200MW

Nodal pricing Zonal pricing

800MW@50$/MWh

+ @70$/MWh- (@-20$/MWh

A B

900MW@20$/MWh

+ @35$/MWh- (@-10$/MWh

800MW@50$/MWh

+ @70$/MWh- (@-20$/MWh

Max: 200MWMax: 200MW

@30$/MWh

Price of transmission?

20

50

900 1700700

2nd dispatch

-100MW @-10$= +1.000$

+100MW @70$= -7.000$

1st dispatch

Cost of 14.000

Total costs 1st +2nd dispatch=20.000

• The difference between the cost of 20.000 in the zonal system and the 17.000 in the nodal system is $3.000

• This is:1. the cost of dispatching the cheap generator for 300MW and

then reducing him for 100MW: this costs 100MW * $10=$1000• The $10 is the difference between what the generator charges if

dispatched ahead and what he gives for a decrease in the balancing period (real-time).

2. the cost of not dispatching the expensive generator and then increasing him for 100MW: this costs 100MW * $20=$1000

• The $20 is the difference between what the generator charges if dispatched ahead and what he charges in the balancing period (real-time).

• When– A can inject maximally 90MW? – And B increases demand with 10MW

• what is then the MC and AC?

Adverse flows

• Nodal & Zonal

• Peak-load pricing

Peak-load pricingExample: Transmission interconnector line

ST-MC

Off-peak

Peak

LT-MCPpeak

POff-peak=0

25

Peak-load pricingGives clear economic signals!

ST-MC

Off-peak

Peak

LT-MCPpeak

POff-peak=0

26

ST-MC

Off-peak

Peak

LT-MC

Ppeak

POff-peak=0

Invest in expansion of transmission capacity on the line

Do not invest in expansion

(wait or even remove a line)

Zonal pricing -> averaging

(EU)

Nodal pricing (also Locational Marginal Pricing) -> peak-load pricing

(USA)

Peak-load pricingExample: Transmission interconnector line

ST-MC

Off-peak

Peak

LT-MC

POff-peak

Ppeak

PAVERAGE

28

3 node network

40MW

A B

40MW

Limit: 50MW

Limit: 50MW

Net Withdraw: 80MW

Net Injection:80MW

A

B

Injection: 120MW

С

Demand: 120MWWithdrawal: 120MW

70$/MWh

40MW80MW

40MW

Marginal Cost?

Dispatch with 3 nodes

30$/MWh

30$/MWh

A

B

Injection: 120MW

С

Demand: 120MWWithdrawal: 120MW

70$/MWh

40MW80MW

40MW

Dispatch with 3 nodes

30$/MWh

Limit: 500MWLimit: 20MW

Limits

Demand: 120MWWithdrawal: 120MW

A

B

Injection: 120MW

С

Limit: 500MWLimit: 20MW

40MW80MW

40MW

Injection: 60MW

20MW

20MW

60MW30$/MWh 60MWh is shed!

Solution 1?: lower injection

40MW

70$/MWh

30$/MWhLimits

Demand: 120MWWithdrawal: 120MW

A: 40MW

A

B

Injection: 120MW30$/MWh

С

Limit: 500MWLimit: 20MW

70$/MWh

A: 80M

W

A: 40MW

Solution 2?: Add counter flow

Inject 60 MW

B: 20MWB: 2

0MW

B: 40MW180MW

A NET: 20MW

Limits

A: 40MW

A

B

Injection: 120MW30$/MWh

С

Limit: 500MWLimit: 20MW

70$/MWh

A: 80M

W

A: 40MW

Solution 3: Counter flow & proportional downturning

Inject 60 MW

B: 20MWB: 2

0MW

B: 40MW

Injection: 80MW30$/MWh

A: 53.33 M

W A: 26.67 MW

A: 26.67 MW

Inject 40 MW

B: 13.33 MW

B: 13.3

3 MW

B: 26.67 MWDemand: 120MW

Withdrawal: 180MW120MW

• Up till 60MW from A no problem

A

B

Injection: 60MW30$/MWh

С

Limit: 500MWLimit: 20MW

70$/MWh

A:20MWA:40MW

A: 20MW

Limits

Demand: 120MWWithdrawal: 60MW

A: +⅓ MW

A: 20MW

A

B

Injection: 60MW30$/MWh

С

Limit: 500MWLimit: 20MW

70$/MWh

A: 40MW

A: 20MW

Limits+1 MW

B: + ⅓ MW

+1 MWDemand: 120MW

Withdrawal: 60MW

A:+10 MW

A: 20MW

A

B

Injection: 60MW30$/MWh

С

Limit: 500MWLimit: 20MW

A: 40MW

A: 20MW

Limits+30 MW

B: +10 MW

+30 MW70$/MWhDemand: 120MW

Withdrawal: 60MW

A: 30MW

A: 60MW

B: 20MW

B: 10MW

90MW120MWMarginal Cost? 50$/MWh