Paas Consulting P/L
Edward Paas Director/Civil Engineer
Qualifications
1992 Bachelor of Engineering (Civil), University of Sydney
2001 Graduate Diploma of Project Management
Justice of the Peace
Membership
Chartered Professional Engineer No. 494215
Member Institute of Engineers Australia (NPER Registered)
Experience
2015 – Current Paas Consulting P/L Director
Providing civil engineering, project management, contract supervision, infrastructure maintenance and
consulting services to government, contractors, developers and the mining/energy sectors.
2010 – 2015 Daracon Group Project Manager
Responsible for all facets of project management, supervision, tendering, contract administration,
OH&S, quality, traffic and environmental management.
Projects include:
� McCloys – Lampada Estate subdivision stage 3 & 4, Tamworth – ($1M)
� D&S Mingay – Mornington Estate subdivision stage 3 and 22KV high voltage powerline relocation,
Gunnedah – ($1M)
� Maules Ck Coal – Rangari Rd upgrade, Narrabri – ($2.5M)
� Santos Ltd – Leewood phase 1 water pump station, ponds and Newell Hwy intersection upgrade –
($15M)
� Mac Village Narrabri – Civil works for mine worker village ($1.4M)
� Highfield Development Estates, Narrabri – Newell Hwy intersection and internal roads ($568k)
� Santos Ltd – Wilga Park Gas Power Station – P&A drill rig civil works ($0.2M)
� Boggabri Coal Pty Ltd – Haul Road reconstruction ($5.25M)
� Boggabri Coal Pty Ltd – Rail Loading Terminal, civil/concrete works ($5.2M)
� Boggabri Coal Pty Ltd – Environmental Rehabilitation works
� Eastern Star Gas – Wellsite rehabilitation works ($260K)
� Boggabri Coal Pty Ltd – MIA Expansion and ROM construction ($10.5M)
� Whitehaven Coal Pty Ltd – Werris Creek Coal Mine Void Water Dam ($1M)
� Santos Limited – Boheena Brine Water Ponds and dieback area rehabilitation ($2.2M)
2002 - 2010 RTA Narrabri District Office Project Engineer
Responsible for project management including OH&S, quality and environmental management,
contracts administration, planning, implementing and supervising the following projects:
� RTA / RSTM - H17 Newell Highway - Various intersection and rest area construction works ($2.5M)
� NPWS - Mt Kaputar Road reconstruction, Narrabri ($200K)
� RTA – H17 Newell Highway maintenance 09/10 Alliance ($8M)
� RTA – H12 Gwydir Highway Slaughterhouse Creek Bridge Alliance ($4.3M)
� Whitehaven Coal – H29 Kamilaroi Highway Coal Mine Intersection ($800K)
Edward Paas
Paas Consulting P/L
� RTA – H17 Moree Bypass Stage 1 ($10.3M)
� Moree Shire Council – Moree Industrial Estate reconstruction ($3.2M)
� RTA – H11 Oxley Hwy Borah Ck bridge replacement ($1.4M)
� RTA – H29 Kamilaroi Hwy Collins and Gunidgera Bridge replacement Wee Waa ($6.3M)
� RTA – H17 Newell Hwy /Kamilaroi Hwy/Francis St, Doctors Ck Bridge intersection reconstruction
($1.8M)
2001 – 2002 RTA Western Region Parkes Senior Estimator
Duties included bid management, estimating and tender preparation for projects up to $6M in value.
1999 – 2001 RTA Western Region Maintenance Engineer
Civil Engineer in various roles involving maintenance and construction projects, including:
� H6 Dicks and McLean Creek Bridge Construction, Bathurst ($1.1M)
� Broken Hill and Tibooburra minor drainage works and flood damage repairs
1993 - 1999 Narrabri Shire Council various positions
Civil Engineer in various roles including design, survey, construction and maintenance of roads,
streets, bridges, drainage and other local government infrastructure.
REFEREES Mr Mark Griffin
Divisional Manager, Daracon Group
Ph: 0409 364 140
Mr Rod Scholes
Construction Manager, Whitehaven Coal, Maules Ck mine
Ph: 0428 683 367
Mr Kym Bailey
Manager Narrabri Operations, Santos Ltd
Ph: 0439 972 887
Mr Jim Purcell
Director, Aquatech Consulting Engineers
Ph: 0429 902 584
top related