dult 28 march nmt

Post on 13-Jun-2015

683 Views

Category:

Design

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

CBD Bicycle infrastructure presentation to DULT Bangalore from Praja.in

TRANSCRIPT

For the NMT task force

NMT enablement of the MG road area & surroundings

8 kilometers of pedestrian + bicycle tracks

many more NMT friendly kilometers

Safe route to public transport

Network map

Separated Track

Lane/Mixed traffic

Distance – 3 kmJunctions - 6Metro stations - 3 Bus stands - 1

MG Road Segment

Sidewalk fairly well defined in most stretches except near webbs jn & metro construction areas, utility & bus stand obstructions

Define zebra Xing & align sidewalk to xing

Move zebra xing left of pillar

Straight traffic lane definition +Pelican Zebra Crossing

Junctions

Trinity Circle

Mayo Hall Jn

Webbs Jn

Sidewalk width – Between 2 & 3 meters

Non existent near metro station

Church street to connect st marks road track & lavelle road to cubbon park

Obstructions

SBI/India Garage jn has very good traffic island, sidewalk good too

Distance – 2 kmJunctions - 9TTMC - 1

St Marks Road Segment

NMT friendly jn3 meter Concrete sidewalkNeed small ramps at corners

Bollard seperated cycle track

Residency Road Segment

Distance – 1.5 kmJunctions - 7Bus stands - 3

Sidewalk width uneven & junctions badly formed

Ashirvadam jn

- Redundant island- People forced to walk on the street

4 meters

Brigade road jn

Mayo hall jn

Open the access inside the mayo hall compound for NMT

Richmond Road Segment

Distance – 1.5 kmJunctions - 7Bus stands - 3Very wide road with very bad sidewalks

Try Honge

Narrower than rain trees

Cross Section

MG RoadSt Marks Road

Markings

Seperators

Before metro opensMonth 1

Month 2Residency RoadRichmond Road

Next steps

top related