drilling rig checklist rev1
Post on 31-Dec-2015
179 Views
Preview:
DESCRIPTION
TRANSCRIPT
Operating Company:
Company Man:
Rig #: Inspection #:
Date/Time of Inspection:
Drilling/ServicingCompany Name & Address:
Phone : E-mail :
Location:Field: Well #: Well Name:
Inspected By:
Toolpusher: Driller: Number of employees:
Site: Total:Ton Miles Logged: BOP Test:
Depth of Well: Days on Location: Rig Operation During Inspection:
Start Date:
Completion Date:
Other employers on site:
DRILLING RIG INSPECTION CHECKLIST FOR
DRILLING & WELL SERVICING OPERATIONS
1. DRILL SITE/LOCATION
# Condition YES NO N/A REMARKS
1 Authorized Personnel Sign Posted at entrance to site
1a Visible rig identification sign erected at entrance to site road and at all directional changes on site road
2 Hard Hat/Safety Glasses/Steel Toe Shoe Signs Posted at entrance to site and other prominent locations on site
3 No Smoking Area’s Designated & Posted
4 No Parking within 50 ft of the rig or within the guywire perimeter
6 Escape & Guy wires flagged with visible material
7 Capacity of guywire anchors verified□ Base Beam Anchor □ Screw-type Anchor□ Permanent (Cement) Anchor □ Other Verification Method:
8 Outhouse/restroom facility provided or in close proximity to the site. (LT 10 min travel time or 2 miles, whichever is less)(Facility in close proximity only applies if the site is active for less than 1 day)
9 Outhouse clean and sanitary, if provided.
10 Hard hats & Safety glasses available for visitors
11 Housekeeping in order
12 Toolpusher at rig location
13 Muster area designated
14 Muster area posted
15 Warning signs clean and visible
16 All vessels labeled as to their contents
17 Store is kept clean
18 Work area’s are maintained clean and free of debris and tripping hazards
19 Evacuation/All-clear alarms
20 Hazardous locations identified
21 Rig substructure, Derrick mast, and other equipment, as appropriate, are grounded to prevent the build up of staticcharge
2. TRAINING, PPE & GENERAL SAFETY
# Condition YES NO N/A REMARKS
1 First Aid/CPR Training provided
2 Regularly scheduled and impromptu meetings of the crew in which probable hazards, problems of the job, and related safepractices are emphasized and discussed3a Pre-Job safety meeting held
3b Pre-tour safety meetings conducted
3c Weekly safety meeting being conducted
3e Safety meetings properly documented
3f Accidents, if any, are discussed during safety meetings
4 HSE poster posted
5 Safety equipment available
6 Proper clothing worn by crew (No loose clothing).
7 Hard hats used by crew
8 Appropriate eye protection for the work being done is worn by personnel
9 Hard toed shoes used by crew
10 Jewelry or other adornments subject to snagging or hanging not worn in the work area
11 Fall protection used, when required
12 No Smoking rules observed
13 HSE Log available on location. accidents during current year
13a Injuries reported and documented immediately
14 First Aid Kit available on site
15 Adequate communications on site
16 Emergency phone numbers posted
16a Provisions made for prompt medical attention for serious injuries
17 Adequate communication w/other contractors on site
18 Emergency response plan is posted at work location
19 Designated rig personnel have an adequate understanding of, and are able to operate the BOP system
20 Written safety program
21 Respiratory Protection Program
22 Hearing protection use required in area’s where needed
23 Job Safety Analysis (JSA) conducted for each task
24 All incidents resulting in injuries to employees investigated and documented to prevent recurrence
25 Smoking or open flames not permitted within 20 ft of compressed gases are used or stored
26 Flammable liquids not stored within 50 ft (15.2m) of wellbore
27 Critical Equipment periodically inspected & tested
Comments:
3A. MUD PUMP & MUP PUMP AREA
# Condition YES NO N/A REMARKS1 All belts, drive chains, gears, shafts and drives guarded
2 Poney rods guarded
3 Rotating parts guarded
4 Mud pump head and valve covers fully bolted
5 Shear pin pop-off valve properly covered
6 Ends of relief lines, high pressure lines, etc secured
7 Ends of mud vibrator hose snubbed
8 Pressure relief valves installed
9 General housekeeping of the area
10 Adequate lighting provided
11 Approved lighting for the location available
12 High pressure fitting used in high pressure system
13 Discharge lines from relief valves are anchored
14 Pumps, piping, hoses, valves and other fittings are maintained in good operating condition
15 Pumps, piping, hoses, valves and other fittings not operated at pressures greater than working pressures
16 Preventive Maintenance is performed as per schedule
17 Critical spares are available at site
Comments:
3B. MUD MIXING AREA
# Condition YES NO N/A REMARKS
1 Bagged material properly stacked
2 Assessment for respirator use conducted, documented and available.
2a Adequate personal protective equipment available:□ Rubber Gloves □ Apron □ Face Shield □ Goggles□ Respirator: □ ½ mask □ Full Face □ Other:
2b Employees using all required PPE
3 Personal protective equipment properly stored
3a “PPE Required” warning signs erected(Grouped or individual signs)
3b Chemical hazard warning signs erected4 Personal protective equipment properly maintained and in
a clean & sanitary condition.5-1 Eye wash station available in close proximity (10 seconds
walking distance from hazard)
5-2 Emergency Shower* available in close proximity (10 seconds walking distance from hazard).(* especially when caustic is used, but not limited to)
5a-1 Eye wash provides a minimum continuous flow of 0.4 gallons of water/solution per minute for 15 minutes
5a-2 Emergency Shower provides a minimum continuous flow of 20 gallons of water per minute for 15 minutes.
5b Eye wash/emergency shower location identified with visible sign
5c Eye wash/emergency shower access free from obstructions6 Eye wash station/emergency shower in working order7 Eye wash station/emergency shower in a clean &
sanitary condition8 Eye wash station/emergency shower providing clean
water supply9 Adequate ventilation in the area10 Elevated loading door opening protected11 Approved lighting for the location available
12 Adequate lighting provided13 General housekeeping
Comments:
3C. MUD TANKS & PITS
# Condition YES NO N/A REMARKS
1 Adequate stairs with handrails
2 Adequate walkways and guardrails3 Guardrails installed on all raised platforms, walkways, etc
above 48”4 Walkways free from obstruction and/or damage
5 Guardrails provided on crossovers6 “PPE Required” warning signs erected
(grouped or individual signs)6a Chemical hazard warning signs erected7 Shale shaker properly guarded8 Explosion proof equipment, fixtures and wiring used in the
vicinity of the shale shaker.Class 1 Div 1/2 Location
9 Agitator shafts & couplings properly guarded10 Mud guns properly secured11 Jetting hoses properly secured12 Desander Unit in good condition12a Explosion proof equipment, fixtures and wiring used in the
vicinity of the Desander.Class 1 Div 2 Location
13 Desilter Unit in good condition13a Explosion proof equipment, fixtures and wiring used in the
vicinity of the DesilterClass 1 Div 2 Location
14 Degasser Unit in good condition14a Drive belts and shafts guarded
15 Approved lighting for the location installed16 Adequate lighting provided17 Assessment for respirator use conducted, documented
and available.17a Adequate personal protective equipment available:
□ Rubber Gloves □ Apron □ Face Shield □ Goggles□ Respirator: □ ½ mask □ Full Face□ Other:
17b Employees using all required PPE
18 Personal protective equipment properly stored
19 Personal protective equipment properly maintained and in a clean & sanitary condition.
20 Stairways and ladders secured
21-1 Eye wash station in close proximity (10 seconds walking distance from hazard)
21-2 Emergency Shower* available in close proximity (10 seconds walking distance from hazard).(* especially when caustic is used, but not limited to)
21a-1 Eye wash provides a minimum continuous flow of 0.4 gallons of water/solution per minute for 15 minutes
21a-2 Emergency Shower provides a minimum continuous flow of20 gallons of water per minute for 15 minutes.
21b Eye wash/emergency shower location identified with visible sign
21c Eye wash/emergency shower access free from obstructions
22 Eye wash station/emergency shower in working order23 Eye wash station/emergency shower in a clean &
sanitary condition24 Eye wash station/emergency shower providing a clean
water supply25 General Housekeeping
26 All unused floor holes covered
27 Electric wiring in good condition
28 Data plates on equipment legible
Comments:
4. MATERIAL HANDLING EQUIPMENT
# Condition YES NO N/A REMARKS
1 Material Handling Equipment (fork lift) operators trained and certified.
1a Training & Certification documents available on site2 Correct type of Fork Lift, etc in use for the location
3 Personnel basket securely attached to forks, if applicable
4 Personnel wearing proper fall protection while in basket5 Backup alarm operational
6 Fork Lift equipped with seat belts7 Seat belts in use by operators8 Fork Lift inspected prior to use (daily)
9 Fork lift stability during movement or lifting
Comments:
# Condition YES NO N/A REMARKS
1 Generators properly located 100ft + from wellhead2 Moving parts guarded3 Generators properly grounded4 Cover panels on electrical control boxes installed and closed.
□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
5 All electrical controls marked as to their function and legible.6 “HIGH VOLTAGE” warning signs erected
7 Insulating mats available at electrical panels8 All electrical tools grounded9 Condition of electrical wiring
□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
10 Electrical wires properly strung□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
10a Electrical wiring properly secured□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
10b Overload protection installed on all generators
11 Unused electrical outlets covered□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
12 Air compressors properly guarded13 Air storage tanks equipped with pop-off valve14 Lockout/Tagout devices available
15 “Hearing Protection Required” warning signs erected.16 Hearing protection available17 Adequate lighting installed
18 Approved lighting for the location provided.(Class 1 Div 2 Location under worst case condition)
19 General Housekeeping20 S.C.R. House, if available, in good condition21 Equipment properly classified for the location
22 Electrical wiring/fixtures/etc approved for the location (Cl 1Div 1 or 2 location) (Based on worst condition scenario)
23 Wires not running along the ground
5. GENERATOR AREA & ELECTRICAL SYSTEMS
24 Cords less than #12 are not spliced□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
24a Splices on hard service cords #12 or larger retain outer insulation, outer sheath protection properties and usagecharacteristics of the original cords.□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:25 All light fixtures properly protected from damage
26 Receptacles and plugs in good condition□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
27 Water hose used for washing area kept away from generator skid
28 Generator skid door props properly pinned29 Fire extinguishers rated for electrical fires (B-C)30 Fire extinguishers located properly and not obstructed
31a Electrical extension cords properly insulated□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
31b Plugs of electrical extension cords in good condition□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
32 Electrical cords, fixed or extension, not run through doorways
33 Electric cord and cable strain relief□ Mud □ Gen/SCR house □ Stor Tanks □ Sub Struct.□ Drill Floor □ Derrick □ Other:
Comments:
6. FIRE PROTECTION
# Condition YES NO N/A REMARKS
1 B/C class fire extinguishers available
2 Adequate number of fire extinguishers available
3a Fire extinguishers properly charged3b Fire extinguishers with equipped with gauges4 Fire extinguishers properly located and in/at their
assigned locations.
4a Employees properly trained to operate fire extinguishers
5 Open pit burning not permitted6 Flammables stored in UL listed safety cans
7 No Smoking rules enforced8 Flare lines are as long as practical and as straight as
possible and securely anchored
8a Space around flares and burn pits should be cleared of brush and grass.
9 Welding work performed safely10 Engines located within 100 ft of the well have spark and
heat arrester, or water, on all engine exhausts11 All engines located approx 100 ft from the well or gas source, if
possible12 Fire extinguishers tagged and/or inspection data recorded
13 Fire extinguisher location easily identified
Comments:
7. FUEL & OTHER FLAMMABLE LIQUID STORAGE TANKS
# Condition YES NO N/A REMARKS
1 Fuel storage tanks properly located
1a H2S precautions enacted
2 All storage valve connections identified as to their function3 Discharge nozzles in good condition4 Discharge hoses in good condition5 Discharge valves in good condition6 LPG storage tanks and compressed gas cylinders in good
condition7 Piping and fuel lines in good condition8 Stationary ladders on storage tanks in good condition9 Adequate lighting provided10 Approved lighting for the location installed
11 Fuel tanks properly labeled on all sides
12 “Flammable” warning signs erected on all sides
13 “No Smoking” signs erected on all sides
14 “No Open Flame” signs erected on all sides
15 Vapor release vents elevated & away from ignition sources
16 General housekeeping
17 Grass & debris kept away from area18 B/C Class fire extinguisher available and identified
19 Protective caps on all fuel cylinders20 Fuel & Flammable Storage tanks ESD protected:
□ Splash Filling Prohibited□ Fill Line & Discharge Velocity Limited□ Grounded
21 Contents of NON-FLAMMABLE storage tanks identified on all sides of tank(s)
Comments:
8. PIPE RACK AREA
# Condition YES NO N/A REMARKS
1 Ends of pipe racks properly chocked
2 Spacers used to separate layers of pipe
3 Layers of pipe properly chocked
4 Pipe racks are level and stable5 Pipe rack catwalk in good condition6 Pipe rack and catwalk at same height7 Stairs with handrails provided8 V-door slide in good condition9 Pipe stops used on V-door slide in good condition10 Pipe tubs and bridles in good condition11 Derrick stand and ladder in good condition12 Dead end of drilling line anchored13 Employees not permitted on top of pipe14 Adequate lighting provided15 Approved lighting installed
16 General housekeeping
Comments:
9. BLOW-OUT PREVENTERS
# Condition YES NO N/A REMARKS
1 BOP properly installed2 BOP properly tested
Input date and results on cover page3 BOP functional3a All lines, valves, check valves, flow fittings, etc have a
working pressure ET/GT the rated working pressure of therams in use4 Wheels and stems in place, if automatic device is not available
5 BOP stack properly stabilized6 All hydraulic lines connected7 All unused hydraulic lines capped and secured
8 Accumulator unit properly located8a Accumulator bottles labeled with contents8b Accumulator operational warning signs erected9 Accumulator valves in appropriate position, open or closed9a Accumulator valves identified as to purpose and position
10 Gauges properly installed & located11 Choke manifold and line secured11a Choke manifold accessible12 Adequate lighting provided13 Approved lighting for the location installed
14 Warning signs erected□ Flammable □ H2S □ Hard Hat □ Eye Protection□ Confined Space □ Auth. Personnel □ Ear Protection
15 Proper drainage provided16 General housekeeping
17 Safety (stabbing) valve and handle for tubing installed18 Choke manifold hydraulic controls accessible19 Choke manifold gauges in working order
20 Hydraulic lines protected21 BOP Control Lines & Valves identified
22 Preventor work boards secure23 Daily inspections of the BOP’s conducted24 Complete set of spare parts maintained & readily available25 Kill line system connected and functional
Comments:
10. DERRICK & SUBSTRUCTURE
# Condition YES NO N/A REMARKS
1 Derrick/A-Frame assembly pins in place2 Assembly pins secured with keepers3 Substructure assembly pins in place4 Substructure assembly pins secured with keepers5 Derrick properly guyed, if applicable5a Guy wires properly tensioned prior to loading
CROWN TO GROUND GUY LINES5b Number of guy lines utilized as per the mast
manufacturers recommendations5c Condition of guy lines5d Diameter of guy lines5e 3 clamp minimum, 4 clamp minimum with sheave5f Clamps properly attached5g Ground anchors5h Type of anchor:5i Anchor pull test performed5j Anchors positioned IAW rig manufacturer’s specifications
TUBING BOARD GUYS5j Strung and crossed for racking5k 3 clamp minimum5l Clamps properly attached
INTERNAL LOAD GUYS5m Properly adjusted for tension5n 4 clamps minimum5o Clamps properly attached5p ¾” diameter line or larger6 Fall lane of derrick clear7 Vehicles out of guy pattern8 Manufacturer’s specification/operation plate attached
to derrick9 Derrick/mast substructure inspected9a Damage and/or corrosion to derrick (waste metal)
9b Damage and/or corrosion to substructure (waste metal)
9c Condition of derrick ladder
10 Climb assist device available11 Climb assist device used by derrickman.12 Climb assist device in good condition13 Full body harness with lanyard available
14 Full body harness w/ lanyard in good condition
15 Fall protection devices in use
15a “Fall Protection Required” warning signs erected16 Derrick/Tubing boards in good condition
17 Guardrails installed on outside of derrick board
18 Pipe fingers in good condition
19 Derrick board walk around platform in good condition, if available
20 Finger board in good condition
21 Finger board safety cable attached22 Crown guardrails installed
23 Rod basket24 Manual latch dog extension/retraction device in
operating condition25 Latch dog visually inspected prior to loading derrick26 Scoping ram stabilizers in good condition
27 Crown sheave guards in place28 Cracks, metal fatigue or wear evident at hinge points29 Safety retainers in use on hinge pins30 Derrick locking pins in place with safety pins31 Derrick hydraulic system free of leaks32 Dead line properly anchored
33 Booms and boom lines in good condition34 Adequate lighting provided35 Approved lighting for the location installed
36 Derrick emergency escape line installed37 Derrick escape device on-line and ready for immediate
access and use.38 Emergency escape line adequately anchored, per
manufacturers specifications, in a clear area away from the rig.39 Tools secured at elevated levels39a Rods, Tubulars, Drill Pipe, etc racked or hung in derrick are
secured to prevent them from falling40 Mud standpipe secured41 Mudhose snubbed at both ends42 All air purged from hydraulic raising cylinder
43 Lower and upper substructures properly bolted together44 Rotary beams and all braces are in good condition45 Drilling line installed properly on anchor and keyed46 Data plates installed on derrick that provide information
on guying, derrick, etc inst
Comments:
11. DRILL FLOOR AREA
# Condition YES NO N/A REMARKS
1 Rotary floor in good condition2 Kelly bushing of a smooth design, or a guard is used, to prevent
catching or snagging of personnel, clothing or material2a Controls adequate if guard not used
3 Rotary chain drive guarded
4 All unused floor holes covered
5 Drawworks Operator at or near controls while in operation
5a Weight indicator installed
5b Weight indicator visible to brake operator
6 Operator’s drawworks controls properly labeled/identified
7 Pipe slips & Dies in good condition
8 Racking floor area in good condition
9 V-door gate or chain provided and in place
10 Air/Hydraulic hoist line in good condition□ near driller □ opposite driller
11 Air/Hydraulic hoist line guide in operating condition□ near driller □ opposite driller
12 Air/Hydraulic hoist line properly layed/wound on drum□ near driller □ opposite driller
13 Air/Hydraulic hoist line properly guarded□ near driller □ opposite driller
14 Cathead friction surface in good condition
15 Cathead line divider/grip in good condition
16 Catline not worn or kinked, if available
17 Kelly cock wrench and safety valve accessible
18 Spinning chain in good condition
18a Automatic spinner in use
19 Headache post in good condition
20 Crown Saver device installed and operational
21 Drawworks hoisting line in good condition
22 Drawworks shut down switches installed
23 Drawworks properly guarded
24 Sufficient wraps left on drum with blocks in down position
25 Proper lay of drill line on reel
26 Drawworks Hydraulic or Hydromatic brakes
27 Drawworks brake linkage
28 Tubing and sand line brakes
29 Road gear lockout
30 Handling winch & tail chain grade 8 & tagged
31 Overrunning clutch in good condition
32 Adequate lighting provided
33 Appropriate lighting installed
34 General housekeeping
35 Suspension cables or chains are grade 8 and tagged36 Rig floor and other work platforms, including derrick board &
stabbing board are supported and secured against dislodging37 Sliding section equipped with stops or pins
38 Minimum 2 exits from drill floor doghouse
39 Drill floor doghouse doors installed properly
40 First aid kit available in drill floor doghouse
41 Non skid material used around rotary
42 Guardrails installed along open edges of drill floor
Comments:
12.POWER AND HAND TOOLS
# Condition YES NO N/A REMARKS
1 Makeup and breakout tongs in good condition2 Tong snubbing lines in good condition
3 Tong snubbing line clamps in good condition and installed properly
3a Tong vertical support line clamps in good condition and installed properly
4 Tong counterweights installed
5 Tong counterweights operational
6 Tong body & jaws in good condition
7 Tong safety handle pins secured
8 Tong dies sharp
9 Tong die keeper used
10 Tongs securely fastened to a suitable fixed structure using a wire rope or a stiff arm
11 Tong positioner in good condition
11a Tong motion controlled
12 Condition of tong jerk line(s)
13 Condition of hand tools
14 Cleanliness of hand tools
15 Hand tools stored properly
16 Bench grinder in good condition
17 Bench grinder wheels properly guarded
18 Bench grinder rest spacing – 1/8” from wheel
19 Face shield available when using bench grinder
20 “Iron Roughneck” used
21 IR dies sharp
22 IR die keeper used
23 IR body & jaws in good condition
24 IR hydraulic system leaks
25 “Foster” Power Tongs used
26 Power Tong/Pipe Spinner doors/safety gate
27 PT body & jaws in good condition
28 PT hydraulic system leaks
29 Electric hand tools double insulated or grounded
30 Electrical extension cords properly insulated
31 Plugs of electrical extension cords in good condition
32 “Dead man” switch installed on all Electric and Pneumatic tools
Comments:
13. HOISTING TOOLS, HOOKS, BAILS, ELEVATORS AND OTHER RELATED EQUIPMENT
# Condition YES NO N/A REMARKS
1 Traveling blocks in good condition2 Traveling blocks properly guarded
3 Sheave guards in good condition
4 Bales and/or links in good condition
5 Elevators in good condition
6 Rod hook in good condition
7 Hoisting hook equipped with safety latch or equiv.
8 Crown block assembly secured
9 Transfer elevators in good condition
10 Crew members not permitted to ride traveling block
11 Circulating hose secured to gooseneck and swivel
12 Power swivel secured
13 Hoisting line inspected daily
Comments:
14. STAIRS, LADDERS, HANDRAILS & GUARDRAILS
# Condition YES NO N/A REMARKS
1 Adequate stairs provided off rig2 Stairs level
3 Minimum of 2 stairways to drill floor
4 Stairs secure
5 No obstructions
6 Adequate handrails provided on stairs with 4 or more risers.
7 Stair treads of uniform size
8 Non-skid type stair treads
9 Stair treads not damaged
10 Guardrails, Midrails, & Toeboards installed along all open side edges of floors, platforms, etc, 4ft above ground level11 Ladders extend 3.5 ft above platform
Comments:
15. HOTWORK, WELDING & FLAME CUTTING OPERATIONS
# Condition YES NO N/A REMARKS
1 Written safety work permit system covering welding and flame cutting operations observed
2 Certified welders3 Welding and flame cutting not permitted near explosives,
flammables, accumulation of oil, escaping gas or near sourcesof ignition4 Helmets with face shields used during welding or arc cutting operations
5 Goggles with proper shade selection used during gas cutting operations
6 Helpers/attendants supplied with and using proper eye protection.
7 Appropriate protective attire worn for welding and cutting ops.
8 Moveable fire hazards in vicinity of welding operations should be moved
9 Guards used to confine heat, sparks & slag to protect fire hazards that cannot be moved
10 Fire extinguishing equipment available
11 Fire watch required
12 Area inspected by individual responsible for authorizing cutting or welding
13 Welding equipment in good condition14 Approve Oxygen & Acetylene bottle used15 Oxygen & Acetylene torches equipped with flash back
arrestors16 Cylinders stored in assigned places and secured in place
17 Oxygen & Acetylene bottles labeled18
Comments:
16. CONFINED SPACES, EXCAVATIONS & HAZARDOUS ENVIRONMENTS
# Condition YES NO N/A REMARKS
1 All site personnel notified of the presence H2S, SO2, or other hazardous gases
1a Employees trained for H2S, SO2 in confined spaces
2 Site evaluated to determine the presence of confined spaces/permit required confined spaces
3 Confined Space location warning signs erected
4 Atmospheric testing of confined space prior to entry
5 Confined Space Permit Entry System & Procedures
6 Excavations, including trenches, deeper than 4 ft or containing hazardous gases tested prior to entry
7 Emergency Rescue equipment readily available
8 Employees protected from cave-ins while in excavations9 Water in excavation10 A means of egress from excavation provided
□ Stairway □ Ladder □ Ramp □ Other11
Comments:
17. PERFORATING OPERATIONS AND USE OF EXPLOSIVES
# Condition YES NO N/A REMARKS
1 Non-essential engines, motors, and other sources of ignition are shut down during perforating operations
1a Smoking not permitted near explosives and/or no one near explosives shall possess matches, open light, or other fire orflame.1b No person allowed to handle explosives under the influence of intoxicating liquors, narcotics or other dangerous drugs.
2 Explosive devices moved by service contractor personnel
3 Electrical grounding of wellhead, service unit and rig made prior to operating tools using explosives4 Perforating guns, etc assembled in a designated restricted area
5 Unnecessary personnel kept clear of perforating operations
6 Warning signs erected near perforating operations stating that all radios, cell phones, etc must be turned off.
7 Radio transmitters, cell phones, etc turned off during blasting operations
8 Warning signal sounded prior to blast9 Perforating operations weather policy
10 Perforating operations conducted during daylight hours11 Instruments for testing blasting devices specifically designed
for the purpose
12 Conductor wire and armor of perforating gun temporarily shorted prior to use
13 Detonating cord and blasting caps kept apart until assembly on location.
14 Blasting caps and boosters transported in approved cap boxes
15 During checking and/or arming, electrical blasting caps, detonators or other initiation devices contained in safety tube16 Deteriorated or damaged explosives and/or blasting equipment not used.
17 TRANSPORT VEHICLE
17a Fire extinguishers charged and in working order
17b Electrical wiring completely protected and securely fastened
17c Underside of vehicle free of excess oil & grease
17d Fuel tank and feedline secure and have no leaks
17e Brakes, lights, horn, windshield wipers and steering operate properly
17f Tires checked for inflation and defects
17g Vehicle in proper condition for all other aspects of handling explosives
18 Equipped with 2 (min.) 10-BC rated fire extinguisher
Comments:
18. SPECIAL SERVICES*
Special Services encompasses Wireline, Stripping & Snubbing, Drill Stem Testing, Acidizing, Fracturing, Hot Oil, Cementing, Gas Air or Mist Drilling, Coring, Coiled Tubing, Hot Tapping and Freezing and Hotwork Operations. Requirements set forth in Sections 1-19 will also apply to this section.
# Condition YES NO N/A REMARKS
A GENERAL REQUIREMENTS1 Pre-Job safety meeting held
2 Fire Extinguishers in accessible locations
3 Service unit located upwind of wellhead
4 Emergency escape air pack available
5 Emergency escape air pack charged and ready for use.
6 Personnel not permitted between wireline and wellhead when wireline operating.
7 Open ended flow line secured to the wellhead, at the end of the line and at intermediate locations.
8 Lubricators, Swages and Unions inspected for defects prior to use.
9 Lubricator equipment, swages, unions and valves pressure tested to max. anticipated pressure.
10 Lubricator equipped with 1 or more bleed valves.
11 Valves and gauges checked to determine if pressure is present in lubricator before removal.
12 Essential personnel only allowed near pressurized lubricators, flow lines and well head
13 Lubricator bleed valves cycled after pressure removed14 Service unit engines equipped with an emergency
shutdown device15 Welding operations not conducted near wellhead.
16 Discharge lines not place under mobile equipment.
17 Pressure fittings, unions & coupling threads, both internal and external, inspected prior to use and in good condition.
B WIRELINE SERVICE, SWABBING
1 Wireline unit located as far away as possible from fracturing and/or hot oil units
2 Wireline units, vehicles, portable houses placed outside the guywires of well service units.
3 Mobile, portable or skid-mounted wireline service units chocked or secured to prevent movement.
4 Gin pole attached to wellhead or Christmas tree with chain &ratchet load binder or equiv
5 Rope & Blocks of the correct size & strength
6 Rope inspected at beginning of the job.
7 Blocks inspected at the beginning of the job
8 Lower wireline sheave secured
9 Splices not used in the entire length of rope
10 Periodic (NTE 12 mo) drill, visual and pressure test of all sections on the lubricator
11 Wireline BOP tested in open and closed positioned
12 High pressure lubricators have 2 or more bleed valves installed
12a Minimum equipment available□ Wireline Valve (BOP) □ Lubricator (riser) Sections□ Pressure Bleed Valve □ Stuffing Box or Control Head
YES NO N/A REMARKS
13 High pressure lubricators, stuffing boxes, valves, connections and adapters inspected at intervals NTE 12 mo
14 Lubricator sections marked with permanent serial number
15 Non-essential engines, motors, and other sources of ignition are shut down during swabbing operations
16 Swabbing operations conducted during daylight hours16a Swabbing unit placed upwind from the wellbore, tanks & pits
17 Hydrostatic bailers secured prior to dumping.C STRIPPING AND SNUBBING1 Emergency escape line rigged and available for each person
on snubbing unit1a Only the minimum number of employees allowed in basket1b Employees provided and using proper protective equipment
2 Gasoline engines and other sources of ignition kept 100+ ft away
3 Snubbing work platform guyed, unless otherwise supported4 Pumps, power packs, tool boxes, doghouses, etc located
away from flow and/or bleed-off lines5 Pump units located so snubbing operator can see
pump operator6 Well pressure monitored at all times7 Backpressure valve or blanking plug installed in pipe string
(Min 1)8 Snubbing operations not conducted at same time as
welding operations in the vicinity9 Approved packer/drill string design used during snubbing.10 Snubbing operations conducted during daylight hours only
D DRILL STEM TESTING1 Engines located 100+ ft from wellhead2 Engines located within 100 ft not operated or equipped
with heat & spark arresting system3 Unauthorized personnel kept clear of area
4 Safety valve and wrench readily available
5 Casing fluid volume monitored
6 Rig floor attended at all times
E ACIDIZING, FRACTURING & HOT OIL OPS
1 Trucks & Tanks located 100 ft min from wellhead
2 Check valve installed on lines from pumping equipment to wellhead
3 Blending equipment grounded
4 Sand unloading equipment bonded to blending machine
5 Unauthorized personnel kept clear of area
6 Pre-treatment pressure test of pump ad discharge lines conducted.
7 Pump operators at controls while pumps in operation
F CEMENTING OPERATIONS
1 Unauthorized personnel kept clear of area
2 Pump & discharge lines tested prior to starting job
3 Pump operators at controls while pumps in operation
G GAS, AIR, or MIST DRILLING OPERATIONS1 Personnel trained in the use of emergency shutoff,
blowout preventer and fire fighting equipment2 Personnel familiar with air/gas supply
3 Personnel familiar with circulating system
4 Compressors located 100 ft away from wellbore
5 Compressors visible from driller’s position
6 Compressors equipped with:
6a Pressure relief valves
6b Discharge temperature and pressure gauges
6c Engine governors
6d Engine shut off valves
7 Drilling engines equipped with kill switches
8 Kill switches mounted near driller’s console
9 Compressor discharge lines equipped with check valve and block valve.
10 Blooey line used
10a Blooey and bleed-off lines 150 ft minimum
11 Blooey and bleed-off lines securely anchored
11a Pilot light used
12 Full-opening, quick closing valve installed on Kelly
13 Two valves installed on standpipe accessible from rig floor and ground level.
14 Shutoff valve installed on main feeder, 150 ft from the well head (Gas only)
15 (GAS Only) Spinning rope used instead of chain
17 Float valves inspected each time bit pulled out
18 Fuel and Oil storage tanks 50 ft min from compressor
19 LPG supply lines equipped with shut off valves at storage tanks and engines
20 Master safety valve located on main fuel line
21 One 150# Class BC dry chemical fire extinguisher available on site
22 Circulating head stripper rubber inspected each tour23 Pipe connections from wellbore leak free24 Well killing material and equipment on site and operational before drilling commences
25 Unauthorized personnel kept clear of area
26 Rig substructure adequately ventilated
27 Generator houses, bunk houses, and change houses kept 100+ft from well bore
28 Automobiles parked GT 100 ft from the wellbore
29 Rig engines equipped with heat and spark arresting systems
30 Gas or gasoline fueled engine equipped with low tension ignition system
31 Other possible ignition sources permitted in designated areas only
H HOT TAPPING & FREEZING OPERATIONS
1 Performed under the direct supervision of a qualified person
2 Hot tapping equipment pressure tested after rig-up
3 Frozen plugs allowed to thaw
4 Frozen plugs tested by staged reduction in pressure5 Equipment suitable for an H2S environment
6 Rated working pressure exceeds anticipated pressures
I CORING OPERATIONS
1 H2S precautions implemented prior to pulling cores
2 Positive pressure/pressure demand breathing apparatus with full face piece used while working in areas where atmosphericconcentrations exceed 10 ppm (H2S) or 2 ppm (SO2)3 H2S monitoring equipment available to check core barrel
4 Proper storage and transportation of H2S containing samples
J COILED TUBING OPS
1 Proper material of tubing used in H2S environment2 Coiled tubing unit placed upwind from the well3 Reel unit and its conveyance should be adequately
secured from movement4 Flanged type connection used on bottom connection of
the coiled tubing BOP5 Dedicated pump cross and a 2nd set of tubing ram
preventers located below the pump crossK WELL EVALUATION AND TESTING OPERATIONS
1 Performed with the minimum number of employees
2 Produced gases vented and/or flared to ensure personal safety
3 Gases from stored test fluids safely vented
4 Proper storage and transportation of H2S containing samples
5 H2S monitoring devices available and in use
6 Only H2S qualified personnel permitted
top related