Introductions

•Downtown Master Plan

•Project Overview

•Main Street, Elm Street, and 7th Street

•4th Street Plaza

•Next Steps and Timeline

Presentation Overview

Overview

Main Street

Main Street

Main Street

Main Street

Elm Street

7th Street

4th Street Plaza

Overview

Stakeholder feedback includes….

• Now and ongoing: Stakeholder Engagement

• Q1 2020: Develop Conceptual Design, Costs, Phasing Options

• Q2 2020: Conceptual Design Milestone

• Q2 2020 – Q1 2021: Construction Plans

• Q1 2021: Construction Begins

Next Steps and Timeline