February 21
ASTRODOME SITE STUDY
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
2/37
Project Goals - A plan that pays tribute to the Astrodomes history and acts asthe outdoor fulcrum of Reliant Park
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
3/37
The Astrodome impedes circulation flow along two major axes of Reliant Park.
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
4/37
Removal of the Astrodome leaves an open green space that
will be an amenity for the citizens of Harris County.
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
5/37
Case Study:
Discovery Green Programmed urban park
Regional Attraction Transformed Downtown
Successful open spaces are a catalyst for
development of surrounding properties
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
6/37
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
7/37
February 21
Discovery Gre
Capacity: 52,3estimate 1 person/
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
8/37
February 21
Cynthia Woods Mitchell Pavili
Capacity: 16,5
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
9/37
February 21
Sam Houston Race Pa
Capacity: 15,0
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
10/37
February 21
International Festiv
Capacity: 50,0
Open Area:385,000sf Open Area: 385,000sf
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
11/37
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
12/37
30 0
28 0
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
13/37
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
14/37
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
15/37
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
16/37
Astrodome History Walking Tour
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
17/37
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
18/37
I
I
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
19/37
I
I
Master PlanReliants Backyard
Phase II
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
20/37
I
I
Phase II
LIGHT RAIL STATION
CirculationVehicle and Pedestrian
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
21/37
I
I
534,600sf
316,800sf
27,500sf
39,600sf
Current CarnTotal Area: 918
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
22/37
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
23/37
February 21
Dome GreArea: 385,0
8.8 a
Capacity: 38(estimate 1 perso
Astrodo
Hallof Fa
Area: 25,Contains serv
storage area for the
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
24/37
February 21
Carnival and RodeoHall of Fame Centered on Green
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
25/37
February 21
Outdoor ConcertHall of Fame Centered on Green
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
26/37
February 21
Outdoor ConcertHall of Fame Centered on Green
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
27/37
February 21
Game Day TailgateHall of Fame Centered on Green
Parking Count: 45
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
28/37
February 21
2017 Superbowl
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
29/37
2017 Superbowl
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
30/37
February 21
Tensile Structure
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
31/37
Tensile Structure
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
32/37
May 3Astrodome Hall of Fame
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
33/37
February 21Astrodome Hall of Fame
MEN'S
VESTIBULE
VESTIBULE
ENTRY
GIFT SHOP
STORAGE
WMN'S
EXHIBITS
FLEXIBLE SPACE
CAFE
KITCHEN
ENTRY
Overall sf: 25,000
Schematic Plan
Dinning sf: 7,850
Seating Capacity: 300-500
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
34/37
L I N B E C K Astrodome Hall of Fame L I N B E C K Astrodome Ha
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
35/37
February 21
L I N B E C K Astrodome Hall of FameConcept Construction Budget Summary
February 20, 2014
Construction Cost Summary -Site Study
Summary $/SF Total $
1 Phase 1 - Demo / Backfill / Utilities 1,151,300 GSF $17.74/SF $20,426,211
2 Phase 2 - Museum / Hardscape & Landscape 605,000 GSF $29.78/SF $18,018,884
3 Phase 3 - Columns / Structural 385,000 GSF $45.35/SF $17,458,747
Total Construction Costs 1,756,300 GSF $31.83/SF $55,903,841
General Clarifications1. Budget pricing is based upon "Astrodome Site Study" dated January 22, 2014 & "Narratives and Exhibits" document prepared by Walter P Moore dated January 18, 2013.2. All pricing is based on February 2014 material and/or labor costs. Any future escalation costs are specifically excluded.
. This pricing assumes that all work will be per ormed concurrently.4. Demolition Costs include Implosion. Asbestos costs not included, assumed complete.5. An Allowance (2% of the Sitework cost) has been included for traffic signal timing, revisions to concrete and revisions to gate
structures in order to accommodate the extra traffic.6. This pricing excludes stages and temporary exhibits.
Based on ROM Estimate of $56M we suggest a $53M to $58M Budget.
L I N B E C K Astrodome Ha Concept Construct
Febru
Ground Level 385,000 SFBelow Ground 766,300 SF
Hardscape/Landscape 605,000 SFLinbeck Category: New construction GB Area: 1,756,300 SF
Estimator: DJ Story Height: 1 FL
Description Quantity Unit $ Total Cost Cost/GSF % Total Commen
A. Demolition1. Pre-Demolition Survey 1 LS $13,117.98 $13,118 $0.01 0.02%2. Asbestos Removal $0 $0.00 0.00% Not Required3. MEP Disconnect / Make Safe 1 LS $327,949.62 $327,950 $0.19 0.59%4 . I mp lo si on o f B ui ld in g 1 ,1 51 ,3 00 S F $ 3. 94 $ 4, 53 0, 82 1 $ 2. 58 8 .1 0% I nc lu de s P ro te ct io n t o E5 . Tem po ra ry S ho ri ng 1 L S $ 19 6,7 69 .7 7 $ 19 6,7 70 $ 0.11 0 .3 5% E xt g Co nc F lo or Fr ami
Subtotal Demolition $5,068,658 $2.89 9.07%
B. Foundation1. Excavation $0 $0.00 0.00% Not Required2. Backfill 397,500 CY $26.24 $10,428,798 $5.94 18.65% Place Select Fill3. Cathodic Protection $0 $0.00 0.00% Not Required4. Spread Footings 72 EA $ 13,385.18 $963,733 $0.55 1.72%5. Continuous Footings 2,100 LF $214.79 $451,054 $0.26 0.81%6. Tower Crane Foundation 4 EA $45,912.95 $183,652 $0.10 0.33%
Subtotal Foundation $12,027,237 $6.85 21.51%
C. Structure1. Columns 72 EA $191,442.53 $13,783,862 $7.85 24.66%2. Miscellaneous Steel 385,000 SF $1.31 $505,042 $0.29 0.90%3. Tower Crane - 4 Each $0 $0.00 0.01% Not Required4. Truck Crane - 3 Hyrdos 20 MO $29,515.47 $590,309 $0.34 0.01%5. Erect / Remove Tower Crane $0 $0.00 0.01% Not Required6. Tower Crane Operators $0 $0.00 0.01% Not Required7. Truck Crane Operators 277 WK $3,541.86 $981,094 $0.56 1.75%
Subtotal Structure $15,860,308 $9.03 28.37%
D. Enclosure Not Required
Subtotal Enclosure $0 $0.00 0.00%
E. Finishes / Specialties Not RequiredSubtotal Finishes $0 $0.00 0.00%
F.MEP1. Plumbing, Drainage 385,000 SF $0.66 $252,521 $0.14 0.45%Subtotal MEP $252,521 $0.14 0.45%
G. Conveying Systems & Equipment Not RequiredSubtotal Conveyors & Equipment $0 $0.00 0.00%
H. Sitework1. Utilities2. Sanitary Sewer Cut & Plugs 7 EA $3,279.50 $22,956 $0.01 0.04%3. Waterline Cut & Plugs 5 EA $3,279.50 $16,397 $0.01 0.03%4. Storm Sewer Cut & Plugs 27 EA $3,279.50 $88,546 $0.05 0.16%5. Grease Trap Abandonment 2 EA $6,558.99 $13,118 $0.01 0.02%6. Gas System 1 LS $ 65,589.92 $65,590 $0.04 0.12%7. Electrical8. Sub Station 385,000 SF $6.56 $2,525,212 $1.44 4.52%9. R e-Feed Reliant Arena 385,000 SF $3.28 $1,262,606 $0.72 2.26%
10. Re-Route Conduit 385,000 SF $1.05 $404,034 $0.23 0.72%11. Lighting w/ Poles 385,000 SF $0.52 $202,017 $0.12 0.36%12. Temporary Power 385,000 SF $0.20 $75,756 $0.04 0.14%13. Telephone Service - AT&T $0 $0.00 0.00% By Others14. Plaza - Renovate / Rework / Landscape15. Museum & Visi tor Center 210,000 SF $10.49 $2,203,821 $1.25 3.94%16. Carruth Plaza 150,000 SF $10.49 $1,574,158 $0.90 2.82%17. Retail Promenade 220,000 SF $10.49 $2,308,765 $1.31 4.13%18. Dome Museum 25,000 SF $459.13 $11,478,237 $6.54 20.53%19. Tra ff ic S igna l/Conc re te /Gate R evis ions 1 LS $453, 902. 35 $453, 902 $0. 26 0 .81% Allowance
Subtotal Sitework $22,695,117 $12.92 40.60%
Total $55,903,841 $31.83 100.00%
L I N B E C K Astrodome Hall of FL I N B E C K Astrodome Hall of Fame
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
36/37
February 21
L I N B E C K Astrodome Hall of F
Project Schedule Summ
February 20, 2
Start Finis
Owner release team to proceed 6/2/14 6/2/1
Center Point Substation
Center Point agreement 6/2/14 6/27/
Relocate Substation (12 months) 6/30/14 6/26/
Design Work (8 months)
Schematic Design Phase 6/2/14 8/1/1
Design Development Phase 8/4/14 10/3/
Construction Document Phase 10/6/14 2/6/1
Develop GMP 2/9/15 3/6/1
Owner Approval 3/9/15 3/20/
Construction (32 months)
Notice to Proceed w/ Construction 6/2/14
Mobilize 6/2/14 6/20/
Phase 1 - Underground Utilities 6/23/14 1/2/1
Phase 1 - Demolition and Backfill of Astrodome 4/17/15 4/14/
Phase 2 - Plaza and Astrodome Hall of Fame 4/15/16 2/2/1
Phase 3 - Commemorative Columns 4/1/16 10/4/
Sitework & Completion 6/15/16 11/1/
Substantial Completion 2/3/1Super Bowl 2/5/1
L I N B E C K Astrodome Hall of Fame
Concept Project Budget
February 20, 2014
Construction $55,903,841
Hazardous Material & Abatement (not included)
FF&E items - Allowance $500,000
Security Cameras - Allowance $200,000
A/E team Consultant Fees $3,000,000
Architect
Structural Engineer
MEP Engineer
Civil Engineer
Landscape
Lighting
Graphics
Code
IT/AV
Specifiations
Traffic
3D Renderings $7,500
Survey $75,000
Geotechnical Report $50,000
Permit Fees (not included)
CenterPoint Fees - Allowance $100,000
Materials Testing $200,000
Reimbursables $75,000
Subtotal $60,036,341
Owner Contingency (10%) $6,003,634
TOTAL PROJECT COSTS $66,039,975
ID Name Duration Start Finish
Jan 2014Apr Jul Oct
Jan 2015Apr Jul Oct
Jan 2016Apr Jul Oct
Jan 2017Apr Jul Oct
Jan 2018Apr Jul
Nov 2013
-
5/22/2018 Documents: Rodeo, Texans have $66M plan to demolish dome
37/37
ID Name Duration Start Finish
1 ST00110 Commissioner's Court Decision 0 Days 5/15/2014 (*)
2 ST00087 Release Design Team to Proceed 0 Days 6/2/2014 (*)
3 ST00065 CenterPoint Agreement 20d 6/2/2014 6/27/2014
4 ST00020 Design Work 220d 6/2/2014 4/3/2015
5 ST00220 Prepare SD Drawings 45d 6/2/2014 8/1/2014
6 ST00100 SD Drawing Budget 10d 8/4/2014 8/15/2014
7 ST00180 Prepare DD Drawings 45d 8/4/2014 10/3/2014
8 ST00230 DD Drawing Budget 15d 10/6/2014 10/24/2014
9 ST00211 Submit for Demo Permit 20d 10/6/2014 10/31/2014
10 ST00192 Prepare CDs 90d 10/6/2014 2/6/2015
11 ST00155 Submit for Permit 40d 2/9/2015 4/3/2015
12 ST00136 Develop GMP 20d 2/9/2015 3/6/2015
13 ST00117 Approvals 10d 3/9/2015 3/20/2015
14 ST00076 Contracts & Expediting 195d 10/27/2014 7/24/2015
15 ST00073 Demo Contr ac t & Submi ttal 45d 10/27/2014 12/26/2014
16 ST00067 Steel Contract & Submittals 80d 3/9/2015 6/26/2015
17 ST00055 Rebar Contract & Submittals 25d 3/9/2015 4/10/2015
18 S T0 00 53 M us eum Co nt ra ct s & E xpe di ti ng 10 0d 3/ 9/ 20 15 7 /2 4/ 20 15
19 ST00030 Phase 1-Demo/Backfill/Centerpoint 489d 6/2/2014 4/14/2016
20 ST00040 Secure Site 15d 6/2/2014 6/20/2014
21 S T0 00 50 R el oc at e Ce nt er Po int S ub st at io n 26 0d 6/ 30 /2 01 4 6 /2 6/ 20 15
22 ST00070 Trace, Cut & Cap Utilities 140d 6/23/2014 1/2/2015
23 ST00090 Demolition 160d 4/17/2015 11/26/2015
24 ST00075 Backfill 160d 9/4/2015 4/14/2016
25 Phase 2-Plaza & Dome Museum 210d 4/15/2016 2/2/2017
26 ST00376 Foundation 30d 4/15/2016 5/26/2016
27 ST00386 Structure 40d 5/27/2016 7/21/2016
28 ST00396 Enclosure 60d 7/22/2016 10/13/2016
29 ST00406 Interiors 40d 10/14/2016 12/8/2016
30 ST00416 Completion A ctivities 40d 12/9/2016 2/2/2017
31 ST0 01 20 Pha se 3 -Columns 1 33 d 4 /1 /2 01 6 1 0/4/20 16
32 S T0 01 30 D ri ll ed P ie r ( 4 p er c ol um n/ 28 8 e a) 25 d 4/ 1/ 20 16 5 /5 /2 01 6
33 ST00140 Pier Cap (72 ea) 60d 4/6/2016 6/28/2016
34 ST00150 Erect Columns 20d 6/15/2016 7/12/2016
35 ST00160 Detail Columns 40d 6/22/2016 8/16/2016
36 ST00170 Cladding 75d 6/22/2016 10/4/2016
37 ST00320 Sitework 75d 6/15/2016 9/27/2016
38 ST00330 Completion Activities 20d 10/5/2016 11/1/2016
39 ST00340 Substantial Completion 0 Days 2/3/2017
4 0 ST0 03 50 Sup er Bow l 0 Days 2/5/2017 (*)
wk -5Aprwk 9
Julwk 22
Octwk 35 wk 48
Aprwk 61
Julwk 74
Octwk 87 wk 100
Aprwk 113
Julwk 126
Octwk 139 wk 153
Aprwk 165
Julwk 178
Octwk 192 wk 205
Aprwk 218
Julwk 231wk -13
Commissioner's Court DecisionRelease Design Team to Proceed
CenterPoint AgreementDesign Work
Prepare SD DrawingsSD Drawing Budget
Prepare DD DrawingsDD Drawing BudgetSubmit for Demo Permit
Prepare CDsSubmit for Permit
Develop GMPApprovals
Contracts & ExpeditingDemo Contract & Submittal
Steel Contract & SubmittalsRebar Contract & Submittals
Museum Contracts & ExpeditingPhase 1-Demo/Backfill/Centerpoint
Secure SiteRelocate CenterPoint Substation
Trace, Cut & Cap UtilitiesDemolition
Backfill
Phase 2-Plaza & Dome MuseumFoundation
StructureEnclosure
InteriorsCompletion Activities
Phase 3-ColumnsDrilled Pier (4 per column/288 ea)
Pier Cap (72 ea)Erect Columns
Detail ColumnsCladdingSitework
Completion Activities
Substantial CompletionSuper BowlProjecttitle Astrodome Hall of FameProgrammetitle
Client Texans/Houston Rodeo
Dated 2/19/2014 Drawnby Mark Gore ProgrammeNo
Rev No Rev comments
Notes
: _ -
top related