cpd report mack surveillance panel june 2004. cpd report mack surveillance panel june 2004

Post on 04-Jan-2016

215 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

CPD ReportMack Surveillance Panel

June 2004

12718 CIM ARRON PATH

SAN A NT ON IO , TEXAS 78 249-3423 USA

VX 210 � 690 � 1958 FX 2 10 � 690 � 1959

w ww . TEI-n et .com

Part Description Batch Reject RateQty on Hand

(builds)Estimated

Monthly Use Rate (builds)

Estimated Inventory

Life (months)

Cylinder Kits: T9/T10 J 12% 60 4 15+

T11 H 9% 12 2 6+Main Bearings (Tin Flashed) G 5% 195 2 50 +

(No Flash Coat) - 30% 3 - -

Con Rod Bearings (T-11 Tin Flashed) H 5% 100 2 24+

(No Flash Coat) - 10% 6 - -

(Special Batch) - - 193 - -

Part Description Qty on Hand

T10 EGR Coolers (19GBX52) 19

T10 Injectors (736GB49BM3) 162

T11 Injectors (736GB411M2) 6

T10 Oil Pumps (315GC465BM) 13

T10 Cylinder Heads (732GB5341M) 2

T11 Cylinder Heads (732GB3494M2) 11

T10 Venturi (Stainless) 1

T10 Exhaust Mnfld Assembly 3

T10 Turbo (small 631GC5145M3) 10

T10 Turbo (large 3801847R) 1

T10 Fuel Inj Lines (HL69-151) 14

T10 Fuel Inj Lines (HL69-152) 26

Comments

See attached

See attached

See attached

See attached

0

10

20

30

40

50

60

70

80

90

100

Perc

ent

Part Number

Mack Parts Percent Rejected

% Rejected

% Rejected 9 12 1 13 14 5 7

Cylinder Liner Pistons Top Ring 2nd Ring Oil Ring Main Bearings Rod Bearings

CPD ReportMack Surveillance Panel

June 200412718 CIM ARRON PATH

SAN A NT ON IO , TEXAS 78 249-3423 USA

VX 210 � 690 � 1958 FX 2 10 � 690 � 1959

w ww . TEI-n et .com

Item Reason(s) for Rejection

Cylinder Liner R.A. too lowPistons surface defects

Top Ring surface defects2nd Ring chrome flaking, surface nicksOil Ring Rails too wide / Nicks / Ring Gap

Main Bearings nicks, scratches, inconsistent finishRod Bearings nicks, scratches, inconsistent finish

12718 CIM ARRON PATH

SAN A NT ON IO , TEXAS 78 249-3423 USA

VX 210 � 690 � 1958 FX 2 10 � 690 � 1959

w ww . TEI-n et .com

• Received shipment of small turbos– Two External differences

– Internal the same

CPD ReportMack Surveillance Panel

June 2004

OldNew

Old

New

12718 CIM ARRON PATH

SAN A NT ON IO , TEXAS 78 249-3423 USA

VX 210 � 690 � 1958 FX 2 10 � 690 � 1959

w ww . TEI-n et .com

• New supply of fuel injection lines received and distributed– Uses current Mack production fittings

CPD ReportMack Surveillance Panel

June 2004

Old New

• T-11 Cylinder Heads– 732GB3494M2 replaced by 732GB3499M2– New head uses 714GB3113 valve guide designed

to reduce valve guide wear– TEI located and purchased as many of the

original heads we could find– Currently 11 in inventory at TEI

12718 CIM ARRON PATH

SAN A NT ON IO , TEXAS 78 249-3423 USA

VX 210 � 690 � 1958 FX 2 10 � 690 � 1959

w ww . TEI-n et .com

CPD ReportMack Surveillance Panel

June 2004

• Received 10 sets non-flashed rod bearing sets and main bearing sets– 1 set rod bearings rejected due to surface defect– 3 sets main bearings rejected due to surface

defect on one bearing each set – Shipped bearings to SwRI, PE, Ethyl

12718 CIM ARRON PATH

SAN A NT ON IO , TEXAS 78 249-3423 USA

VX 210 � 690 � 1958 FX 2 10 � 690 � 1959

w ww . TEI-n et .com

CPD ReportMack Surveillance Panel

June 2004

top related