coseners meeting sept 10-11 2008 future of european isol peter butler
Post on 18-Jan-2016
213 Views
Preview:
TRANSCRIPT
Coseners meeting Sept 10-11 2008
Future of European ISOL
Peter Butler
Coseners meeting Sept 10-11 2008
ISOL in Europe
CRC, Louvain-la-Neuve( 1989-2008)
REX-ISOLDE, CERN( 2001)
EXCYT, Catania(2006)
SPIRAL, GANIL (2001)
DRIBS, Dubna
Coseners meeting Sept 10-11 2008
World ISOL
Peter Butler
World ISOL accelerated beams
Nuclear structure, Condensed matter, Astrophysics
0.3 - 3 MeV/ulinac
8,9,11Li, 10-12Be,17F, 24-29Na, 28-32Mg, 68Ni, 67-71,73Cu, 74,76,78,80Zn, 70Se, 88,92Kr,96Sr, 108In, 106,108,110Sn,122,124,126Cd138,140,142,144Xe, 140,142,148Ba,148Pm, 153Sm, 156Eu, 184,186,188Hg, 202,204Rn
3 kW1.4 GeVprotons
REX ISOLDE(CERN)2001
Nuclear structure, Astrophysics
2 - 25 MeV/ucyclotron
6,8He, 14,15,19-21O,18F, 17-19,23-26Ne, 33-35, 44,46Ar, 74-77Kr
6 kW100 MeV/uheavy ions
SPIRALGANIL(FRANCE) 2001
Astrophysics,Condensed matter, Nuclear Structure
1.5 - 5 MeV/ulinac
8,9,11Li, 11Be, 18F, 20-22, 24-29Na,23Mg, 26Al
50 kW500 MeVprotons
ISACTRIUMF(CANADA) 2000
Nuclear Structure, Astrophysics
2 - 10 MeV/utandem
7Be,17,18F, 69As, 76-79Cu, 67,83-85Ga, 78,82-86Ge,69As,83,84Se,92Sr, 117,118Ag, 126,128,132-136Sn, 129Sb,129,132,134,136Te
1 kW100 MeVp, d, (-ve ion source)
HRIBFOak Ridge(USA) 1997
Astrophysics, Nuclear structure
10 MeV/ucyclotron
6He, 7Be, 10,11C, 13N, 15O, 18F, 18,19Ne, 35Ar
6 kW30 MeVprotons
LOUVAINE-LA-NEUVE(BELGIUM) 1989
PHYSICSREACH
ENERGYUSER BEAMSACCELERATED
POWER DRIVERFACILITY
Coseners meeting Sept 10-11 2008
Next generation ISOL facilities in Europe
SPIRAL II
HIE-ISOLDE
EURISOL SPES
Coseners meeting Sept 10-11 2008
Existing IH-structure
Existing7 & 9-gap
high- high- high- high-
low-
1.2 MeV/u 2.8 MeV/u 4.5 MeV/u 6 MeV/u 8 MeV/u 10 MeV/u
RFQ
300 keV
low-
low-
cavity
solenoid
diagnostic box
high-
HIE-ISOLDE CERN
HIE-LINAC
Coseners meeting Sept 10-11 2008
Solid state RILIS is now installed
RFQ cooler (ISCOOL) ready for exploitation
SC LINAC 10 MeV/u construction 2009-2013
EBIS, new RFQ Cooler, HRS upgrade 2011-2013
HIGH-POWER TARGET UPGRADE 2011-2015
HIE-ISOLDE timeline
A/q=6 Injectoroption
A/q=6 Injectoroption
AEL High intensity stable HI beams up to 14.5 A MeVAEL High intensity stable HI beams up to 14.5 A MeV
DESIR Facility low energy RIBDESIR Facility low energy RIB
Production Cave for other beamsTransfer, fusion-evap,
Production Cave for other beamsTransfer, fusion-evap,
HRS+RFQ CoolerHRS+RFQ Cooler
Fission Production CaveUp to 1014 fiss./sec.
Fission Production CaveUp to 1014 fiss./sec.
A/q=3 HI sourceUp to 1mAA/q=3 HI sourceUp to 1mA
A/q=2 sourcep, d, 3,4He 5mAA/q=2 sourcep, d, 3,4He 5mA
LINACLINAC
GANIL/SPIRAL 1 today
GANIL/SPIRAL 1 today
CIME cyclotron RIB at 1-20 AMeV (up to 9 AMeV for ff)CIME cyclotron RIB at 1-20 AMeV (up to 9 AMeV for ff)
Phase 1
Phase 2
SPIRAL-2 GANIL
Coseners meeting Sept 10-11 2008
RIB production SPIRAL-2
DESIR
Coseners meeting Sept 10-11 2008
Coseners meeting Sept 10-11 2008
SPES LEGNARO
Coseners meeting Sept 10-11 2008
SPES
40 MeV p driverUCx target
EURISOL: GANIL?
CIME would be replaced by a 100 MeV/u postaccelerator
Coseners meeting Sept 10-11 2008
EURISOL: CERN?
Coseners meeting Sept 10-11 2008
Low Power SPL (CERN)(1.4 GeV 50 kW to HIE-ISOLDE)
High Power SPL (CERN)(1.4 GeV 3 MW to EUR-ISOLDE)
Earliest 2020
Coseners meeting Sept 10-11 2008
EURISOL SITE COMPARISON COMMITTEE
Alan Shotter (chair)Alex Mueller (IN2P3)Giacomo Cottone (INFN)Don Geesaman (ANL)Steve Myers (CERN)
CERN, RAL, Legnaro, GANIL
EURISOL Users Group
Angela Bonacorrso (Italy, chair)Dieter Ackermann (Germany),Bertram Blank (France),Giacomo De Angelis (Italy),Ari Jokinen (Finland),Marek Lewitowicz (France),Robert Page (UK),Berta Rubio (Spain),Michael Thoennessen (USA)
Coseners meeting Sept 10-11 2008
FINIS
top related