Convert Taco John's to Arby's Lackland AFB, Texas QAI# 16064 ESPN#3722-15-000001 ADDENDUM 02 19January 2017 PART I – SPECIFICATIONS N/A
PART II – DRAWINGS 1. Sheet G001-
a. Added AS/AI- AAFES Supplied/AAFES Installed’ to the Abbreviations table. b. Revised the issue dates for sheets G001, A202,A301, A801 to 19JAN2017
2. Sheet- A202 a. Added Paint color P2, Sherwin Williams SW6601 Tanager to the Arby’s Finish
Material Legend. b. Detail 1- Revised Food Court Interior Elevation to remove WC-CB1 from the sign
bulkhead and revise to P-2. c. Detail 1- Clarified the ‘Arby’s’ sign is to be white and Supplied and installed by
AAFES. d. Detail 6-Revised the Elevation/section to indicate removal of WC-CB1 from the
sign bulkhead and revise to P-2. 3. Sheet A301
a. Detail 3- Revised Food Court Interior Elevation to remove WC-CB1 from the sign bulkhead and revise to P-2. P-2 is to be installed on the bottom of the bulkhead and FRP is to installed on the serving side of the bulkhead.
b. Detail #-Clarified that FRP is to be the finish on the bottom and rear side of the Menu board bulkhead.
4. Sheet A801 a. Added Note #3 “G.C. to use Base Roof Warranty Contractor for all for roof-
related work’ to the Equipment Schedule notes. END OF DRAWINGS ITEMS
PART III – Questions and Answers
N/A
AT
TS
XETE
FO
SA
10 9 8 9
REG
IS
TERED ARCH
ITEC
TDAV
ID J . L
EE
HAVAC HEATING, VENTILATING ANDAIR CONDITIONING
HW HOT WATERID INSIDE DIAMETERIF INSIDE/INTERIOR FACEINSUL INSULATIONINFO INFORMATIONJC JOB CAPTAINLC LICENSEELEED LEADERSHIP IN ENERGY AND
ENVIRONMENTAL DESIGNLL LANDLORDMAX MAXIMUMMECH MECHANICALMC MECHANICAL CONTRACTORMEP MECHANICAL, ELECTRICAL,
AND PLUMBINGMFR MANUFACTURERMIN MINIMUMMLDG MOLDINGMTL METALNAT NATURALNIC NOT IN CONTRACTNL NIGHT LIGHTNTS NOT TO SCALEOA OVER ALLOC ON CENTEROD OUTSIDE DIAMETEROF OUTSIDE FACEOPNG OPENINGPC PLUMBING CONTRACTORPLAM PLASTIC LAMINATEPLC PLACEPLYWD PLYWOODPM PROJECT MANAGERPT PAINTQT QUARRY TILER RADIUSREF REFERENCEREQ(‘D) REQUIRE(D)REV REVISED/ REVISIONRND ROUNDSC SOLID CORESF SQUARE FEETSHT SHEETSIM SIMILARSOL SOLIDSPECS SPECIFICATION(S)SQ SQUARESS STAINLESS STEELSTL STEELSTG STORAGESUSP SUSPENDEDTEL TELEPHONETEMP TEMPORARY3PY THIRD PARTY LOGISTICSTYP TYPICALUNO UNLESS NOTED OTHERWISEVCT VINYL COMPOSITE TILEVD VENDOR DIRECTVERT VERTICALVIF VERIFY IN FIELDWH WATER HEATERWD WOODWMV WHITE MAPLE VENEER
NORTH ARROW
BENCH MARK
X
X' XX"
X
XXXX AFF
SCALE BAR
DATUM POINT
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION
DETAIL BUBBLE
REVISION TAG
APPLIED WALLTREATMENT TAG
AFF HEIGHT TAGS
DIMENSION
REVISION CLOUD
SHEET NUMBER
SECTION NUMBER
SHEET NUMBER
DETAIL NUMBER
CENTER LINE
0 1 8 102 3 4
PXXXX FINISH SCHEDULE
DXXX DOOR NUMBER
0' - 0"
X WALL TYPE TAG
XXXX EQUIPMENT TAG
ACC ACCESSIBLEA/C AIR CONDITIONINGACT ACOUSTICAL CEILING TILEADJ ADJUSTABLEAFF ABOVE FINISHED FLOORAMP AMPEREARCH ARCHITECTAS/AI AAFES SUPPLIED/ AAFES INSTALLEDBLK BLOCKINGBOB BOTTOM OF BEAMBOH BACK OF HOUSEBLDG BUILDINGCAB CABINETCLG CEILINGCLR CLEAR/CLEARANCECMU CONCRETE MASONRY UNITCTR CENTERC.L. CENTER LINECOL COLUMNCONC CONCRETECONT CONTINUOUSCONST CONSTRUCTIONCT CERAMIC TILECW COLD WATERDEG DEGREEDET DETAILDIA DIAMETERDIM DIMENSIONDISP DISPENSERDN DOWNDWG(S)DRAWING(S)EA EACHEL ELEVATIONELEC ELECTRICALEQUIP EQUIPMENTEQ EQUALEXIST EXISTINGEXPEXPOSEDEXT EXTERIORFC FIXTURE CONTRACTORFFE FINISH FLOOR ELEVATIONFF&E FURNITURE, FIXTURE, AND EQUIPMENTFOC FACE OF CABINETFOG FACE OF GLAZINGFOS FACE OF STUDFRP FIBERGLASS REINFORCED PANELFIO FURNISHED & INSTALLED BY OWNERFOIC FURNISHED BY OWNER
INSTALLED BY CONTRACTORFLRFLOORFS FLOOR SINKFOH FRONT OF HOUSEFT FOOT/FEETGA GAUGEGALV GALVANIZEDG GROUNDGC GENERAL CONTRACTORGWB GYPSUM WALL BOARDHC HOLLOW COREHDR HEADERHDW HARDWAREHDWD HARDWOODHM HOLLOW METALHORIZ HORIZONTALHR HOURHT HEIGHT
AT
TS
XETE
FO
SA
10 9 8 9
RE
GIS
TE
RED ARCH
ITE
CTD
AV
IDJ .
LE
E
SCALE:
AAFES Project Number:
DATE:
SHEET:
PROJECT NUMBER
DRAWING TITLE:
D es ig n . Sp aces . Peo p le .
7 0 7 W . V ickery B lvd . # 1 0 1
Fort W orth , T exas 7 6 1 0 4
p h . (8 1 7 ) 7 3 8 -8 0 9 5
fx . (8 1 7 ) 7 3 8 - 9 5 2 4
w w w .q arch .com
DRAWN BY:
CHECKED BY:
1 2 3 4 5
1 2 3 4 5
A
B
C
D
PROJECT:
EXCHANGE
EXCHANGE
CONSTRUCTION TYPE:
STORE TYPE:
CONVERT:
A
B
C
D
As indicated
1/1
9/2
01
7 3
:08
:33
PM -G-0001
COVER SHEET
28 NOVEMBER 2016
LWL
AGL
16064
ISSUE FORSOLICITATION
TACO JOHN TO ARBY'S
LACKLAND AFB, TEXAS
THE EXCHANGE (ARMY & AIR FORCEEXCHANGE SERVICE)
TENANT REMODEL
3722-15-000001
CONVERT:
PROJECT NO.
TACO JOHN TO ARBY'SLACKLAND AFB, TEXAS
THE EXCHANGE (ARMY & AIR FORCE EXCHANGE SERVICE)
28 NOVEMBER 2016
ISSUE FOR SOLICITATION
3722-15-000001
SHEET SHEET TITLE
Sheet
Issue Date
Current
Revision
Date
GENERAL
-G-0001 COVER SHEET 11/28/16 01/19/2017
-G-0002 ACCESSIBILITY STANDARDS 11/28/16
-G-0003 ACCESSIBILITY STANDARDS 11/28/16
DEMOLITION
.D101 DEMOLITION FLOOR PLAN 11/28/16
.D102 DEMOLITION REFLECTED CEILING PLAN 11/28/16 11/28/2016
ARCHITECTURAL
A101 FLOOR PLAN 11/28/16
A102 FINISH FLOOR PLAN 11/28/16
A201 REFLECTED CEILING PLAN 11/28/16
A202 INTERIOR ELEVATIONS 11/28/16 01/19/2017
A203 PERSPECTIVE VIEWS 11/28/16
A301 ARBY'S DETAILS 11/28/16 01/19/2017
A801 EQUIPMENT SCHEDULE 11/28/16 01/19/2017
MECHANICAL
M101 HVAC PLAN 11/08/16
M201 HVAC SCHEDULES & DETAILS 11/08/16
PLUMBING
P101 PLUMBING PLANS 11/08/16
P201 PLUMBING SCHEDULES & DETAILS 11/08/16
ELECTRICAL
E101 ELECTRICAL PLANS 11/08/16
E201 ELECTRICAL SCHEDULES & DETAILS 11/08/16
GENERAL NOTES
1. GENERAL CONTRACTOR SHALL FIELD SURVEY THE LOCATION AND VERIFY ALLEXISTING CONDITIONS AND DIMENSIONS PRIOR TO CONSTRUCTION. ANYDISCREPANCIES SHALL BE REPORTED TO THE OWNER AND ARCHITECT. A SITE VISITDATE AND TIME WILL BE SCHEDULED TO AFFORD ALL PROSPECTIVE GENERALCONTRACTORS THE OPPORTUNITY TO VISIT THE SITE PRIOR TO BIDDING.
2. GENERAL CONTRACTOR SHALL COMPLETE ALL WORK AS INDICATED ON THESEPLANS, UNLESS OTHERWISE NOTED. CONTACT CIVIL ENGINEERING AND OBTAIN ALLAVAILABLE AS-BUILT DRAWINGS BEFORE THE BEGINNING OF CONSTRUCTION.
3. GENERAL CONTRACTOR SHALL OBTAIN PERMITS, APPROVALS, INSPECTIONS,CERTIFICATE FOR COMPLIANCE AND CERTIFICATE OF OCCUPANCY AS REQUIRED,UNLESS OTHERWISE NOTED. SEE NOTE 18.
4. GENERAL CONTRACTOR SHALL CHECK IN WITH AND COORDINATE ALL WORK WITHTHE BASE CIVIL ENGINEERING PROJECT MANAGER.
MEP ENGINEER
5. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION BARRICADESAND TEMPORARY POWER, LIGHT AND TELEPHONE IN ACCORDANCE WITH ALLREQUIREMENTS OF BASE / POST. GENERAL CONTRACTOR SHALL REMOVE ALL OFTHESE ITEMS AT THE COMPLETION OF WORK.
6. GENERAL CONTRACTOR SHALL HAVE ENTIRE PROJECT SITE CLEANED UPONCOMPLETION OF WORK BY A PROFESSIONAL CLEANING SERVICE. CONTRACTORSHALL CLEAN AND SECURE ENTIRE PROJECT SITE ON A DAILY BASIS.
7. GENERAL CONTRACTOR SHALL MAINTAIN ON SITE AT ALL TIMES, ALL APPROVED &AS-BUILT DRAWINGS INCLUDING REVISIONS AND ADDENDA.
8. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY & OSHAPRECAUTIONS AND BASE SAFETY REQUIREMENTS DURING CONSTRUCTION.
9. GENERAL CONTRACTOR SHALL COMPLETE ALL WORK IN A NEAT AND PROFESSIONALMANNER.
10. GENERAL CONTRACTOR SHALL PROVIDE A ONE (1) YEAR WARRANTY ON ALL WORKAND MATERIALS FROM DATE OF ACCEPTANCE BY OWNER. (ALSO SEE OWNER'SMECHANICAL PLANS FOR ADDITIONAL WARRANTY REQUIREMENTS.) GENERALCONTRACTOR'S WARRANTY MUST ALSO INCLUDE LABOR WHEN MANUFACTURER'SWARRANTY IS "PARTS ONLY."
11. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE RECEIPT, UNLOADING,AND STORAGE OF ALL OWNER SUPPLIED MATERIALS AND EQUIPMENT. GENERALCONTRACTOR SHALL NOTIFY OWNER IF ANY MATERIALS OR EQUIPMENT HAS NOTARRIVED AT THE JOB SITE IN A TIMELY MANNER. ALL SHIPMENTS SHALL BEINSPECTED UPON ARRIVAL FOR DAMAGES, SHORTAGES AND INCORRECTMATERIALS. ALL PROBLEMS SHALL BE REPORTED TO OWNER'S PURCHASINGDEPARTMENT IMMEDIATELY. GENERAL CONTRACTOR SHALL NOTIFY THE CARRIERIMMEDIATELY OF ALL DAMAGES AND/OR SHORTAGES AND OBTAIN A RECEIPT FORSUCH. AT THE COMPLETION OF THE PROJECT, GENERAL CONTRACTOR SHALLNOTIFY OWNER'S PURCHASING DEPARTMENT OF ANY SURPLUS EQUIPMENT FORPROPER DISPOSITION.
12. CONTRACTOR PERSONNEL SHALL HAVE VALID, CURRENT I.D.'s. EVERY VEHICLE OFTHE CONTRACTOR SHALL OBTAIN A BASE PASS AND ALL GC PERSONEL TO OBTAINA PERSONAL PASS.
13. GENERAL CONTRACTOR SHALL COORDINATE ALL TRADES NECESSARY TOCOMPLETE THE WORK OUTLINED IN THESE DOCUMENTS.
14. AT THE COMPLETION OF THE PROJECT, GENERAL CONTRACTOR SHALL PROVIDEONE (1) EXTRA CARTON OF EACH CEILING TILE AND CERAMIC TILE USED.
15. IT IS STRONGLY RECOMMENDED THAT NO CONTRACTUAL AGREEMENTS OF ANYKIND BE SIGNED PRIOR TO RECEIVING AND THOROUGHLY REVIEWING ALLAPPROVALS FROM ALL OF THE REGULATORY AUTHORITIES HAVING JURISDICTIONOVER THIS PROJECT & BASE FIRE DEPARTMENT.
16. DUE TO THE NATURE OF THE WORK, ALL DIMENSIONS SHOWN SHALL BECONSIDERED APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONSPRIOR TO BEGINNING CONSTRUCTION. SHOP DRAWINGS SHALL BE SUBMITTED TOARCHITECT FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION OF ANY ITEM.FAILURE TO ADHERE TO THIS PROCEDURE SHALL PLACE FULL RESPONSIBILITY FORANY ERRORS DIRECTLY UPON THE CONTRACTOR.
17. ARCHITECT WILL NOT HAVE CONTROL OVER OR CHARGE OF AND WILL NOT BERESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCESOR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTIONWITH THE WORK, SINCE THESE ARE SOLELY THE CONTRACTOR'S RESPONSIBILITY.ARCHITECT WILL NOT BE RESPONSIBLE FOR CONTRACTOR'S FAILURE TO CARRYOUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE ARCHITECTWILL NOT HAVE CONTROL OR CHARGE OF AND WILL NOT BE RESPONSIBLE FOR ACTSOR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTORS OR THEIR AGENTS OREMPLOYEES, OR OF ANY OTHER PERSONS PERFORMING PORTIONS OF THE WORK.
18. THERE ARE UNDERGROUND UTILITIES ON THE SITE NEAR OR IN THE AREA OF NEWCONSTRUCTION. CONTRACTOR TO OBTAIN AN APPROVED DIGGING PERMIT (AFFORM 103) PRIOR TO ANY SITE WORK.
19. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED TO EXISTINGCOMMUNICATIONS FACILITIES AND WILL BE RESPONSIBLE FOR REPAIR OF DAMAGEDFACILITIES AT NO COST TO THE GOVERNMENT. IF ANY COMMUNICATIONS CABLESSHOULD BE DAMAGED, CALL THE BASE COMMUNICATION SQUADRON.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING THEIR OWN TELEPHONESERVICE DURING CONSTRUCTION AT NO COST TO THE GOVERNMENT.
EXCHANGE PROJECT MANAGER
NAME T. A. JONESADDRESS 3911 S. WALTON WALKER BLVD.
DALLAS, TEXAS 75236-1509PHONE (214) 312-2312MOBILE (469) 515-6865
ARCHITECT
NAME QUORUM ARCHITECTS, INC.ADDRESS 707 W. VICKERY BLVD.
FORT WORTH, TX 76104CONTACT DAVID LEE, AIAPHONE (817) 738-8095 x 6318FAX (817) 738-9524EMAIL info@qarch.com
PROJECT LOCATION
SITE LOCATION NO SCALE
LACKLAND AFB, TEXAS
GENERAL MANAGER
ABBREVIATIONS INDEX OF DRAWINGS
21. THIS SPACE IS PROTECTED BY A BUILDING-WIDE FIRE SPRINKLER SYSTEM ANDMODIFICATION WILL BE REQUIRED IN THIS SPACE. MODIFICATIONS WILLREQUIRE WORKING DRAWINGS AND CALCULATIONS TO BE PREPARED ANDSUBMITTED BY A REGISTERED PROFESSIONAL FIRE PROTECTION ENGINEER.
22. GENERAL CONTRACTOR TO PROVIDE WALL BLOCKING FOR ALL CASEWORK,EQUIPMENT, SHELVING, ETC.
PROJECT TEAM VICINITY MAP
SITE LOCATION
PROJECT LOCATION
SITE LOCATION NO SCALE
LACKLAND AFB, TEXAS
NAME CONWAY DUNCANADDRESS 3015 SOUTH FORT AVENUE, SUITE D
SPRINGFIELD, MISSOURI 65807CONTACT MP ENGINEER - CHRIS DUNCAN, PE
E ENGINEER - KEVIN CONWAYPHONE (417) 881-1586FAX (417) 881-8390
NAME JBSA-LCK AFB EXCHADDRESS 2180 KENLY AVE BLDG 1251
LACKLAND AFB, TEXAS 78236CONTACT LORENZO SALGADOPHONE (210) 674-8917FAXEMAIL salgado@aafes.com
SYMBOL LEGEND
APPLICABLE CODES-
USE THE LATEST
EDITION
DOD UFC (UNIFIED FACILITY CRITERIA)
INTERNATIONAL BUILDING CODE
INTERNATIONAL EXISTING BUILDING CODE
INTERNATIONAL PLUMBING CODE
INTERNATIONAL MECHANICAL CODE
NFPA 90A, NFPA 90B
NATIONAL ELECTRIC CODE
NFPA 70
INTERNATIONAL FUEL GAS CODE
NFPA 54
ADDAAG
NFPA 101-2001
LIFE SAFETY CODE
IES/ASHRAE STANDARD 62
IES/ASHRAE STANDARD 90.1.89
EXCHANGE DESIGN CRITERIA MANUAL
LACKLAND INSTALLATION DESIGN GUIDELINES
23. GENERAL CONTRACTOR IS TO OBTAIN A COPY OF AS-BUILT DRAWINGS FOR THEEXISTING BUILDING. HE IS TO BE RESPONSIBLE FOR HAVING KNOWLEDGE OFEXISTING CONDITIONS AND MAKE ALLOWANCES FOR NEW CONSTRUCTION ASREQUIRED. THIS INCLUDES HIDDEN/BURIED STRUCTURE, UTILITIES,EQUIPMENT, FITTINGS, FIXTURES, UTILITIES, ETC.
DATE
REVISION NO. &
DESCRIPTION BY
01/19/2017 ADDENDUM NO. 2 LWL
1
1
1
ELEVATION NOTES
NEW FRP PANELS ON NEW WALLS.FRP TO MATCH EXISTING.
NEW BASE TILE. TILE AND GROUT TOMATCH EXISTING
REFER TO SHEET A301 FOR FINISHES
1.
2.
3.
2
SS-1
WT-1 PROVIDE 6" S.S.BASE PANEL
WP-1EXISTING FINISHTO REMAIN
BOTTOM OF EXIST.BULKHEAD
P-2
WP-1
OPENBEYOND
AS/AIARBY'S SIGN(WHITE)
1' -
10
"7
' - 1
1"
ARBY'S 'HAT'SIGN
EXISTINGDOOR TOREMAIN
CASHREGISTER
EXISTINGWALL TOREMAIN
SS-2
ON SIDEWALL
CG-1
P-2
2
QB-1
SS-1
P.O.S. BYOWNER
WC-CB1
FRP-1BOTTOM OF EXIST.BULKHEAD
CG-1CG-1
QUAD POS OUTLETS(RE: MEP DRAWINGS)
POS DATAOUTLETS
OPEN TO LOBBY
2' -
10
"5
' - 1
"1
' - 1
0"
STEEL FRAME TOSUPPORT COUNTER
CASHREGISTER
C
9 3/8" QB-1
FRP-1FRP
WP-1 CG-1
OPEN
ARBY'S MENUREFER TO A801
QB-1
FRP-1
QB-1
CG-1
OPEN
C
QB-1
CG-1 HOOD HOOD
CG-1
FRP-1
MENU BOARDSREFER TO A801
OPEN
QB-1
BOTTOMOF EXIST.BULKHEAD
FRP-1
MP-1
7
A102
7
A102 FIRE SUPPRESSIONSYSTEM MONITOR
QB-1
P-2
P-2
FRP-1
QB-1
CG-1CG-1
FRP-1
QB-1
CG-1
OPEN
2
P-1
FRP
QB-1
MENU BOARDSREFER TO A801
EXISTINGELECTRICALPANEL
2' -
3 1
/2"
+/-
LARGE CABINETSMALL CABINET(S)
6' -
8"
A.F
.F.
CG-1
3 1
/2"
OPEN
FIRE SUPPRESSIONSYSTEM MONITOR
ARBY'S FINISH MATERIAL LEGEND
REFERENCE ITEM MANUFACTURER/ PRODUCT
COLOR / SIZE FINISH / DESCRIPTION / PATTERN
SS-1 SOLID SURFACE CORIAN 1/2" X 30" X 276"VERIFY LENGTH IN FIELD
ARCTIC ICE FRONT SERVING CORIAN COUNTER TOP
CONTACTNAME
CONTACTPHONE
WP-1 SOLID WOOD WALL BOARDS APA COLOR GRAPHICS SIZE: 8'-0" X 6" PLANKS NOTE: GC TO STAGGER INSTALLATION OF THE MULTI-TONEWOOD PLANKS. EQUAL AMOUNTS OF EACH TYPE OF PLANKSHOULD BE ORDERED TO MEET DESIGN STANDARD.
PATTERN: CUSTOM / RANDOM STAIN
CHUCK BOGLE 404-355-1355
WT-1 SUBWAY WALL TILE CROSSVILLE TILE COLOR BY NUMBERS WT02 "TEAFOR TWO" GLOSS
SIZE: 4" X 8"
GROUT: CUSTOM BUILDING PRODUCTS #60 CHARCOAL DANIEL LOPEZ 770-570-9050
P-1 PAINT SHERWIN WILLIAMS MATCH SUBWAY WALL TILE MENU BOARD BULKHEAD
FRP-1 FIBERGLAS REINFORCED PANEL MARLITE / PANOLAM COLOR: WHITE EMBOSSED
B-1 4" VINYL COVE BASE MATCH EXISTING VINYL COVE BASE MATCH EXISTING FOR REPAIRS AND PATCHING
CLG-1 SUSPENDED ACOUSTIC CEILINGTILE AND SUPPORT GRID
ARMSTRONG 605 CERAMAGUARD SCRUBABLETILE AND GRID TO MATCH EXISTING
WHITE TO MATCH EXISTING,SIZE: 2'X2'
QB-1 QUARRY TILE BASE & GROUT MATCH EXISTING QUARRY TILE ANDGROUT IN ALL ASPECTS SEAL GROUT.
MATCH EXISTING AT BACK OF HOUSEMATCH EXISTING
MP-1 QUILTED 18 GA. STAINLESSSTEEL PANEL
STAINLESS SUPPLY, CO. 877.484.0088FAX:704.220.0208 307 NORTH SECRESTAVENUE, MONROE, NC 28110
FULL WALL HEIGHT-FROM QUARRY TILE BASETO BOTTOM OF CEILING
PATTERN D3B, POLISHED FINISH
WC-CB1 CUSTOM ACCENT WALL VINYL APA COLOR GRAPHICS CUSTOM "CHALKBOARD VINTAGE ARBY'SCUSTOM WIDTH: 50" CHUCK BOGLE 404-355-1355
SS-2 STAINLESS STEEL BASE SATIN/ BRUSHEDSTAINLESS STEEL BASE CONTRACTOR SUPPLIED/ INSTALLED
P-2 PAINT SHERWIN WILLIAMS SW 6601'TANAGER'
MALL/ FOOD COURTSIGN BULKHEAD
FRP-1
OPEN
C
CG-1 CG-1
OPEN
ARBY'S MENUREFER TO A801
FRP
OPEN
CG-1
FRP-1
QB-1
AT
TS
XETE
FO
SA
10 9 8 9
RE
GIS
TE
RED ARCH
ITE
CTD
AV
IDJ .
LE
E
SCALE:
AAFES Project Number:
DATE:
SHEET:
PROJECT NUMBER
DRAWING TITLE:
D es ig n . Sp aces . Peo p le .
7 0 7 W . V ickery B lvd . # 1 0 1
Fort W orth , T exas 7 6 1 0 4
p h . (8 1 7 ) 7 3 8 -8 0 9 5
fx . (8 1 7 ) 7 3 8 - 9 5 2 4
w w w .q arch .com
DRAWN BY:
CHECKED BY:
1 2 3 4 5
1 2 3 4 5
A
B
C
D
PROJECT:
EXCHANGE
EXCHANGE
CONSTRUCTION TYPE:
STORE TYPE:
CONVERT:
A
B
C
D
As indicated
1/1
9/2
01
7 3
:08
:37
PM A202
INTERIOR ELEVATIONS
28 NOVEMBER 2016
LWL
AGL
16064
ISSUE FORSOLICITATION
TACO JOHN TO ARBY'S
LACKLAND AFB, TEXAS
THE EXCHANGE (ARMY & AIR FORCEEXCHANGE SERVICE)
TENANT REMODEL
3722-15-000001
1/4" = 1'-0"1
INTERIOR ELEVATION
1/4" = 1'-0"2
INTERIOR ELEVATION
1/4" = 1'-0"3
INTERIOR ELEVATION
1/4" = 1'-0"6
INTERIOR ELEVATION
1/4" = 1'-0"7
INTERIOR ELEVATION
1/4" = 1'-0"9
INTERIOR ELEVATION
1/4" = 1'-0"10
INTERIOR ELEVATION
1/4" = 1'-0"8
INTERIOR ELEVATION
1/4" = 1'-0"5
INTERIOR ELEVATION
1/4" = 1'-0"4
INTERIOR ELEVATION
1/4" = 1'-0"11
INTERIOR ELEVATION
DATE
REVISION NO. &
DESCRIPTION BY
01/19/2017 ADDENDUM NO. 2 LWL
1
1
1
1FRP
1WT
1QB
1SS
3/4" PLYWOOD UNDER SS-1
AN1.50X1.50X.25-304S.SANGLE FRAME ALL FOURSIDES-GRIND ALL WELDSSMOOTH
NEW KNEE WALLFOR NEW COUNTERDESIGN
6"
P.O.S. BY OWNER
3'-0"
2 1/2"
1 1
/2"
2'-10
"
2SS
A102
6
1FRP
1WT
1QB
1SS
3/4" PLYWOODUNDER SS-1
NEW KNEE WALLFOR NEW COUNTERDESIGN
6"
5/8" CEMENT BOARD BOTHSIDES AS SUBSTRATE FORFINISHES
ARBY'S CONDIMENTTOPPER #111 WITH THEARBY'S SAUCEDISPENSER #95 ON THEFRONT COUNTER. THECONDIMENT TOPPER ISRECESSED BY THEKES.
AN1.50X1.50X.25-304S.SANGLE FRAME ALL FOURSIDES-GRIND ALL WELDSSMOOTH
INCLUDES: - TWO SOUFFLE CUP DISPENSERS #91 INTEGRATED INTO THE TOPPER - TWO NAPKIN DISPENSER #94 INTEGRATED INTO THE TOPPER - THE ARBY'S SAUCE DISPENSER #95 INTEGRATED INTO THE TOPPER
3'-0"
2 1/2"
1 1
/2"
2'-10
"
2SS
A102
6
CD
A301
1
MENUBOARDS
"ARBY'S"SIGNAGE
1FRP
1WP
1P
1QB
1QB
2P
1FRP
S.SCORNERGUARD
OPENBEYOND
3/4" PLYWOOD BETWEEN STUDSFOR MENU BOARD BLOCKING
EXISTINGBULKHEAD
6'-8
"
3 5/8" MTL. BRACING AT32" O.C. - SECURE TOSTRUCTURE ABOVE
SUSPEND FROMSTRUCTURE ABOVE
LAY-IN CEILING
EXISTINGSTRUCTURE
LAY-IN CEILINGEXISTINGCEILING
1FRP
2P
1
1
AT
TS
XETE
FO
SA
10 9 8 9
RE
GIS
TE
RED ARCH
ITE
CTD
AV
IDJ .
LE
E
SCALE:
AAFES Project Number:
DATE:
SHEET:
PROJECT NUMBER
DRAWING TITLE:
D es ig n . Sp aces . Peo p le .
7 0 7 W . V ickery B lvd . # 1 0 1
Fort W orth , T exas 7 6 1 0 4
p h . (8 1 7 ) 7 3 8 -8 0 9 5
fx . (8 1 7 ) 7 3 8 - 9 5 2 4
w w w .q arch .com
DRAWN BY:
CHECKED BY:
1 2 3 4 5
1 2 3 4 5
A
B
C
D
PROJECT:
EXCHANGE
EXCHANGE
CONSTRUCTION TYPE:
STORE TYPE:
CONVERT:
A
B
C
D
1" = 1'-0"
1/1
9/2
01
7 3
:09
:13
PM A301
ARBY'S DETAILS
28 NOVEMBER 2016
LWL
AGL
16064
ISSUE FORSOLICITATION
TACO JOHN TO ARBY'S
LACKLAND AFB, TEXAS
THE EXCHANGE (ARMY & AIR FORCEEXCHANGE SERVICE)
TENANT REMODEL
3722-15-000001
1" = 1'-0"1
COUNTER DETAIL
1" = 1'-0"2
COUNTER DETAIL
1" = 1'-0"3
ENLARGED SECTION
DATE
REVISION NO. &
DESCRIPTION BY
01/19/2017 ADDENDUM NO. 2 LWL
NO QTY. ITEM MANUF. AND MODEL NO. REMARKS PROVIDED BY INSTALLED BY
1 2 CASH REGISTER BY OWNER (DEDICATED ELECTRICAL CIRCUIT) ISOLATED, DEDICATED ELEC. CIRCUIT REQUIRED AAFES AAFES
4 1ORDER CONFIRMATION SYSTEM
(NOT SHOWN)TECHKNOW - DFP300 - OCS300ARB AAFES AAFES
5 2 WALL MOUNTED HAND SINK KROWNE HS2 AAFES G.C.
12 1 SHAKE MACHINE - FULL UPRIGHT TAYLOR 60 32 1/2" D x 18 7/8" W x 59 7/8" H AAFES AAFES
12B 1 SHAKE CUP AND LID DISPENSER SAN JAMAR C8504WFD AAFES AAFES
16 4 COOK & HOLD CABINETALTO-SHAAM - 300TH-ARB1-SS
(WITH SITESAGE SPOD)16-13/16"W X 25-3/16"D X 18-15/16"H AAFES AAFES
16A 1 COOK & HOLD STAND SERTEK CF050004-45 45" W x 41 1/2" T MOBILE STAND TO HOLD (3) #16 AND (1) #17 AAFES AAFES
17 2DIGITAL COUNTERTOP ELECTRIC
CONVECTION OVENCADCO, MODEL XAFT-115A 28 1/8"D x 23 5/8"W x 16 7/8"H AAFES AAFES
17B 1 OVEN TIMER A.J. ANTUNES SOLAR TIMER MODEL #TTS-8 OT AAFES AAFES
19 1 3 COMPARTMENT SINK - EXISTING
INCLUDES (1) B231 FAUCET WITH 12" SPOUT, (1)
B133B FAUCET W/ BACKSPLASH MOUNT, (1) B-157
PRE-RINSE FAUCET AND (3) LEVER WASTES
EXISTING SINK NEW FITTINGS G.C. G.C.
20 3 LEVER DRAINS T&S BRASS B-3952-01 AAFES G.C.
21 LOTSHELVING ABOVE 3
COMPARTMENT SINK
METRO
SMART WALL SYSTEM, ARBSW96
MOUNT WALL BRACKET @ 85" A.F.F. COMPONENTS INCLUDE: (4) WALL
UPRIGHTS, 56" WALL TRACK, 40" WALL TRACK, (4) SINGLE SHELF SUPPORTS, (2)
WALL GRIDS, (10) PRONG HOOKS, (1) DRY RACK, (2) 18"x 42"SE PRO SHELVES, (2)
6-PRONG BOTTLE HOLDER, (1) TRAY DRYING RACK, (5) LARGE BASKET
AAFES AAFES
23 1 KNIFE RACK SAN JAMAR, SAF-T-KNIFE STATION, STK1008 15"X15"X4.25", INCLUDED IN SMALLWARES PACKAGE AAFES AAFES
26 1 BEEF PORTION SCALE SMALLWARE ITEM SEE SMALLWARES LIST AAFES AAFES
30 1PREP TABLE W/ BACKSPLASH &
PREP SINK
KES, CUSTOM FAB ITEM, INCLUDES (1)B231 FAUCET
WITH 12" SPOUT AND (1) LEVER WASTE DRAIN108" X 36" X 36"H, 16" A.F.F. (CW & HW), 8" A.F.F. (W) AAFES AAFES
30A OPTLUNDERCOUNTER REFRIGERATION
W/ DRAWERSBEVERAGE AIR, UCRD48A-2 AAFES AAFES
31 1SERVICE TIMER SYSTEM 30 (NOT
SHOWN)HME - C11178 AAFES AAFES
34 LOTDRY STORAGE SHELVING,
BRIGHT ZINC FINISH
METRO
REFER TO PLAN FOR LOCATION, QUANTITY, & SIZE
OF SHELVING UNITS
SEE PLAN FOR SHELF LOCATION, ALL SHELVING UNITS TO BE (5) TIERED. PROVIDE
86" POSTS.AAFES AAFES
40 1 FRY BASKET TABLE KES, CUSTOM FAB ITEM 30" W x 30" D AAFES AAFES
41 1 FRY DUMPMARSHALL AIR THERMOGLO, MODEL RR5-48.5TL
(RR5-48.5TR FOR REVERSE LAYOUT)
59"H X 48.625"W X 32.75"D, 20 AMP, NEMA 6-20, W/ BUILT-IN FRY STATION
TIMERAAFES AAFES
41A 1 FRY CARTON SHELF(1) 12" x 36" SHELF WITH (4) 6" POSTS
BRIGHT ZINC FINISHSIT ON TOP OF FRY DUMP AAFES AAFES
42A 1 EXHAUST HOOD - FRYERCAPTIVE-AIRE, BD-2 SERIES, SEE MECHANICAL
PLANS
60" x 28" x 47"h, STAINLESS STEEL W/ UL LISTING, FILTERS, 4" BACKSPACER,
PROVIDE COMPLETE FIRE SUPPRESSION SYSTEM, ANSUL SYSTEMG.C. G.C.
42B 1 EXHAUST HOOD - OVENSCAPTIVE-AIRE, ND-2 SERIES. SEE MECHANICAL
PLANS48" X 54" x 24"h, STAINLES STEEL W/ UL LISTING, FILTERS, 4" BACKSPACER G.C. G.C.
43 1 3 BANK FRYER W/ NATURAL GAS
HENNY PENNY, EVOLUTION ELITE, 3 WELL OPEN
FRYER, EEG-143.35-ARG GAS WITH
DIRECT-CONNECT
GAS BURNERS, NATURAL OR LIQUID PETROLEUM GAS, 225,000 BTU/HR,
(66.2KW), 1" GAS CONNECTION, 14" A.F.F. G.C TO HOOK UP QUICK DISCONNECT
(SUPPLIED BY KES), INCLUDE DORMONT GAS HOSE KIT #16100-KIT-48. ALSO
INCLUDE DIRECT-CONNECT KIT TO ALLOW HOOK-UP TO DARLING 1500 H UNIT
AAFES AAFES
45 1 MENU BOARDHOWARD, 11 PANEL, PLATINUM MODULAR LED
MENU BOARD SYSTEMAAFES AAFES
46 1140" WORK SMART SLICER
COUNTERKES, CUSTOM FAB ITEM 125 AMP PANEL, POWER TO SUB PANEL BY G.C. AAFES AAFES
46A 1 60" ROLL-IN COLD WELL UNIT BEVERAGE AIR, SPE 24-60M AAFES AAFES
46D - TO-GO BAG HOLDER INTEGRATED INTO #46 SLICER COUNTER AAFES AAFES
46F -WARMER DRAWER (FUTURE
ADDITION)APW WYOTT, MODEL #HDDi-1B, 1-DRAWER
INTEGRATED INTO #46, SLICER COUNTER, INSTALLED ON SITE BY EQUIPMENT
INSTALLERAAFES AAFES
46H 1 BACKLINE TIMER A.J. ANTUNES SOLAR TIMER MODEL #TTS-8 PT MOUNTED ON SLICER COUNTER (ITEM #46) NEAR THE CHEESE PUMP (ITEM #56) AAFES AAFES
46M - TURNOVER DISPLAY KES, CUSTOM FAB ITEM NTEGRATED INTO #46 SLICER COUNTER AAFES AAFES
48 1SANDWICH SLIDE / ORGANIZER
STANDKES, CUSTOM FAB ITEM AAFES AAFES
51 1 PREP-SLICER GLOBE G12A, MEDIUM DUTY SLICER20 1/8"W x 24 5/8 x 20 1/4" H. THE OWNER CAN CHOOSE TO USE A SECOND #52
AS THE PREP SLICER. SEE ITEM #52.AAFES AAFES
52 1 SLICER GLOBE 4219N AAFES AAFES
52A 1 SLICER HEAT LAMP MARSHAL AIR THERMO GLO BW4B-1 24.875 X 28 X 24.75 STAINLESS STEEL CONSTRUCTION AAFES AAFES
53 1 PORTION SCALE (NOT SHOWN) TAYLOR, MODEL #THD32D SEE SMALLWARES LIST AAFES AAFES
53A 1 PORTION SCALE (NOT SHOWN) TAYLOR, MODEL #THD50 SEE SMALLWARES LIST AAFES AAFES
54 1 VERTICAL TOASTER ROUNDUP VCT2000 3350-4462 WATTS, 16-18 AMP, INCLUDES RETROFIT KIT (PART NO. 7000707) AAFES AAFES
56 1 DUAL CHEESE PUMP STAR MFGR. #SPDE-2ARB 10.75"W X 21.38"D X 32.25"H AAFES AAFES
56A 1 WIRE SOUFFLE CUP HOLDER QUADRATEC, DISPWAR 0001 COLOR: BLACK AAFES AAFES
60A 2WORK SMART DRIVE-THRU
STAGING CARTMETRO, #ARB1430SC
14" X 30" X 36"H CART ON CASTERS. USED WITH WORK SMART DT CASHIER
STANDAAFES AAFES
61 3 MICROWAVE OVEN MENUMASTER COMMERCIAL MODEL MOC24 USED WITH WORK SMART AND FRONT LINE SLICER COUNTER AAFES AAFES
62 1 HEATED HOLDING MARSHALL AIR, 3 TIER, 3x2 HOLDING UNIT 19.75"H X 15.375"W X 15.625"D AAFES AAFES
65 1 COUNTER G.C. G.C.
76 2 MOBILE BREAD RACK, ON CASTERS METRO, #ARB243060BR 21" X 24" X 60"H, 10 SHELVES AAFES AAFES
77 1 AU JUS SERVERSERVER, MODEL SY 1.0 ARBY'S #85503,
1 GAL AU JUS SERVERAAFES AAFES
78 2 PAPER TOWEL DISPENSER BY OWNER SEE SHEET A6.1 FOR MOUNTING HEIGHTS, 1 FOR EACH HAND SINK, SEE #5 AAFES AAFES
79 2 LIQUID SOAP DISPENSER BY OWNER SEE SHEET A6.1 FOR MOUNTING HEIGHTS, 1 FOR EACH HAND SINK, SEE #5 AAFES AAFES
80 1 SINGLE DOOR UPRIGHT FREEZER TRAULSEN G12000 AAFES AAFES
89 LOTFRONT COUNTER SHELVING,
BRIGHT ZINC FINISH
INTERMETRO
REFER TO PLAN FOR LOCATION, QUANTITY, & SIZE
OF SHELVING UNITS
SEE PLAN FOR SHELF LOCATION AAFES AAFES
90 1UNDER COUNTER, S/S CUP
DISPENSER16"H X 17"W X 4 3/4"D AAFES AAFES
97 LOT WALL MOUNTED SHELVINGMETRO
24x36, (2) TIER SHELVING, BRIGHT ZINC FINISHAAFES AAFES
109 LOTS/S OUTSIDE CORNER GUARD
(NOT SHOWN)KES, CUSTOM FAB ITEM
2" x 2" x 108" 18 GAUGE. S.S. PROVIDE 2X2 FULL HEIGHT STAINLESS STEEL
CORNER GUARDS ON ALL OUTSIDE CORNERS IN KITCHEN. KITCHEN EQUIPMENT
SUPPLIER (KES) TO SUPPLY AND INSTALL ALL S.S. GUARDS.
G.C. G.C.
111 1 CONDIMENT TOPPER KES, CUSTOM FAB ITEM HOLDS ITEMS #91, #94 AND #95 AAFES AAFES
KES, CUSTOM FAB ITEM
FD
FD
FD
FD
FD
C D
2
141
WORK AREA
138
HSKP
130
130
12
89
89
1
90
54
5
79
78
1
89
76
80
60A97 97
76
30 30A 51
79
78
5
17
17B
46 26
56 46F
56A 52
46H 52A61626161
40
16A
42A
43
77
46D
48
82
12B
16 (4)
109
109
109
109
109 109
109
109109
109
109
109
109 109
41
41A
60A
24"x42"
24"x42"
24"x42"
65
89
111
24"x30"
46A21
19
20
23
(2)
42B
FCO
FS
FCO
FS
EXHAUST HOODFOR OVENS(ABOVE)
EXHAUST HOODFOR FRYER(ABOVE)1) ALL FINAL CONNECTIONS TO BE
BY GENERAL CONTRACTOR.
2) GENERAL CONTRACTOR TO INSTALL ALL BLOCKING FOR SHELVING AND EQUIPMENT. SEE 02/A-101.
3) G.C. TO USE BASE ROOF WARRANTY CONTRACTOR FOR ALL ROOF - RELATED WORK.
NOTES: REMARKS KEY:
AAFES = ARMY & AIR FORCE EXCHANGE SERVICES
G.C. = GENERAL CONTRACTOR
AT
TS
XETE
FO
SA
10 9 8 9
RE
GIS
TE
RED ARCH
ITE
CTD
AV
IDJ .
LE
E
SCALE:
AAFES Project Number:
DATE:
SHEET:
PROJECT NUMBER
DRAWING TITLE:
D es ig n . Sp aces . Peo p le .
7 0 7 W . V ickery B lvd . # 1 0 1
Fort W orth , T exas 7 6 1 0 4
p h . (8 1 7 ) 7 3 8 -8 0 9 5
fx . (8 1 7 ) 7 3 8 - 9 5 2 4
w w w .q arch .com
DRAWN BY:
CHECKED BY:
1 2 3 4 5
1 2 3 4 5
A
B
C
D
PROJECT:
EXCHANGE
EXCHANGE
CONSTRUCTION TYPE:
STORE TYPE:
CONVERT:
A
B
C
D
As indicated
1/1
9/2
01
7 3
:09
:14
PM A801
EQUIPMENT SCHEDULE
28 NOVEMBER 2016
LWL
AGL
16064
ISSUE FORSOLICITATION
TACO JOHN TO ARBY'S
LACKLAND AFB, TEXAS
THE EXCHANGE (ARMY & AIR FORCEEXCHANGE SERVICE)
TENANT REMODEL
3722-15-000001
3/8" = 1'-0"1
EQUIPMENT PLAN
DATE
REVISION NO. &
DESCRIPTION BY
01/19/2017 ADDENDUM NO. 2 LWL
1