CONSTRUCTION UPDATE – February 2015Dr. Prem Reddy Health & Science

Perimeter wall framing in SIM Labs

Metal Framing of west wall of cadaver room / cat storage

Looking at wall framing for cadaver room/cat storage rooms from anatomy lab

Student restroom area, overhead fire sprinkler piping, perimeter wall framing

Overhead ductwork in beds/equipment room

Templates for medical headwalls in Nursing

Fundamentals

Front entry, shot of overhead work

Perimeter wall framing in nursing fundamentals and

corridor 127. Fire sprinkler piping and duct

overhead

Install of columns for shade structures has started in courtyard

South west side exterior.

Metal deck installed at sloped roof

Wall Framing of observation, control, and

SIM labs

Posts for shade structure, outside deans office

Framing at faculty offices area.

Looking in from exterior door on west

side

Looking up at rotunda framing

Rotunda steel being welded.

CMU block being installed for main covered walkway

to existing bldg

Looking down upon covered walkway columns

in progress.

Mechanical unit set on mezzanine level

South side flat metal decking, sloped roof

metal decking

Penetrations in deck for solatubes (skylights)

Air handler unit on mezzanine (AHU 2)

Emergency eyewash installed at chemistry lab

Wall framing at chemical balance room, exit foyer

Overhead duct & walls framed in nursing

fundamental

Installing overhead duct in corridor 127.

Medical supplies and utility rooms framed up. Overhead duct installed

Deans office, and meeting room to the right.

Bottom side of metal deck, with cut outs for solatube. Anatomy lab.

Concrete just poured at north covered walkway

Emergency eyewash installed at anatomy lab

SIM lab, control room, observation room wall

framing. Overhead duct.

In wall plumbing at patient toilet rm 150

Aluminum frames for glass along corridor 127

Window in digital nurse proctor room, looking into

digital nurse test lab

Piping ran to medical headwall template,

nursing fundamentals lab

Overhead ducts in nursing fundamentals

Looking at south covered walkway, from roof.

North side roofing install

South roof

Mezzanine level. Mechanical unit & piping

Looking from south, to north.

Rotunda and mechanical attic to the right

Mock up of medical headwall in nursing

fundamentals

Plumbing for washer & dryer in utility room