CONSTRUCTION UPDATE – February 2015Dr. Prem Reddy Health & Science
Perimeter wall framing in SIM Labs
Metal Framing of west wall of cadaver room / cat storage
Looking at wall framing for cadaver room/cat storage rooms from anatomy lab
Student restroom area, overhead fire sprinkler piping, perimeter wall framing
Overhead ductwork in beds/equipment room
Templates for medical headwalls in Nursing
Fundamentals
Front entry, shot of overhead work
Perimeter wall framing in nursing fundamentals and
corridor 127. Fire sprinkler piping and duct
overhead
Install of columns for shade structures has started in courtyard
South west side exterior.
Metal deck installed at sloped roof
Wall Framing of observation, control, and
SIM labs
Posts for shade structure, outside deans office
Framing at faculty offices area.
Looking in from exterior door on west
side
Looking up at rotunda framing
Rotunda steel being welded.
CMU block being installed for main covered walkway
to existing bldg
Looking down upon covered walkway columns
in progress.
Mechanical unit set on mezzanine level
South side flat metal decking, sloped roof
metal decking
Penetrations in deck for solatubes (skylights)
Air handler unit on mezzanine (AHU 2)
Emergency eyewash installed at chemistry lab
Wall framing at chemical balance room, exit foyer
Overhead duct & walls framed in nursing
fundamental
Installing overhead duct in corridor 127.
Medical supplies and utility rooms framed up. Overhead duct installed
Deans office, and meeting room to the right.
Bottom side of metal deck, with cut outs for solatube. Anatomy lab.
Concrete just poured at north covered walkway
Emergency eyewash installed at anatomy lab
SIM lab, control room, observation room wall
framing. Overhead duct.
In wall plumbing at patient toilet rm 150
Aluminum frames for glass along corridor 127
Window in digital nurse proctor room, looking into
digital nurse test lab
Piping ran to medical headwall template,
nursing fundamentals lab
Overhead ducts in nursing fundamentals
Looking at south covered walkway, from roof.
North side roofing install
South roof
Mezzanine level. Mechanical unit & piping
Looking from south, to north.
Rotunda and mechanical attic to the right
Mock up of medical headwall in nursing
fundamentals
Plumbing for washer & dryer in utility room