construction punch list

Post on 18-Jan-2016

12 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

This is a construction punch list, with fields for issue, remediation, assigned to, and status

TRANSCRIPT

04/21/202313:46:32

document.xlsx 1 of 3

# Priority Date Target Finish Eq. number Equipment Item Responsible Status Notes

Contractor 1 Complete

Contractor 2 Identified

Contractor 3 Assigned

Contractor 4 In Progress

Contractor 5 On Hold

Contractor 6 Cancelled

Contractor 7 Closed

Contractor 8 Complete

Priority Definition Responsible StatusA Before Startup Contractor 1 Identified 1 1178B Within 2 weeks of s/u Contractor 2 Assigned 1 1501C Before Demobilization Contractor 3 In Progress 1 1502

Contractor 4 On Hold 1 1521Contractor 5 Cancelled 1 1522Contractor 6 Closed 1 1564Contractor 7 Complete 1 43% 1565Contractor 8 1566Contractor 9 7 1572. 1574

157617081710

Equipment 1Equipment 2Equipment 3Equipment 4Equipment 5Equipment 6Equipment 7Equipment 8Equipment 9Equipment 10Equipment 11Equipment 12Equipment 13