company profile - timas profile graha timas jl ... pv elite compress htri ... platforming combine...

Post on 10-Mar-2018

276 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Company ProfileCompany Profile

GRAHA TIMASJl. Tanah Abang II No. 81, Jakarta ‐ Indonesia 10160P: (+62 21) 352 2828F: (+62 21) 352 1616, 352 1919

Table of ContentTable of Content

Vision and Mission

Organization Chart

Product and Services

Certification & Licenses

Engineering Software

Appreciation from Clients

Timas Fabrication Shop

Project Experiences

VISIONVISIONTo Become a Leading

EPCI Company in Indonesia

To Become a Leading EPCI Company in

Indonesia

VISIONTo Become a Leading

EPCI Company in Indonesia

Mission: #2

Focusing on the quality development of human

resources

Mission: #3

Develop profesional and dynamic corporate

governance

Mission: #4Mission: #4To give added value to

customers, share holders, employees and

public in line with the company’s growth

To give added value to customers, share

holders, employees and public in line with the

company’s growth

Mission: #4To give added value to

customers, share holders, employees and

public in line with the company’s growth

VISION and MISSIONVISION and MISSION

ORGANIZATION CHARTORGANIZATION CHART

OUR PRODUCTS AND SERVICESOUR PRODUCTS AND SERVICES

Oil and gas plant Industrial, petrochemical & fertilizer plant Oil storage terminals & gathering facilities Power plants and boilers Pulp and paper plants Offshore platforms installation Subsea pipeline installations Rig and rigless services

CERTIFICATE

ENGINEERING SOFTWARE

Our team of engineers will provide the bestengineering solution using the latest designsoftware and working closely with ourplanners and surveyors : PV Elite Compress HTRI, Versi 6.0 Stad Pro.v8i Moses rev.7 Tank

APPRECIATION FROM CLIENTS

Timas Fabrication ShopOur fabrication shop is equipped with reliable machines and highlyexperienced personnel in the fabrication of pressure vessels, HeatExchangers, Air Coolers, Food Grade Tanks and other variousequipments.

Timas Fabrication Shop (cont’d)

Timas Fabrication Shop (cont’d)

Timas Fabrication Shop (cont’d)

Timas Fabrication Shop (cont’d)

Project ExperiencesSOUTH EAST SUMATERA GAS PROJECTAMINE STILL (V235/V435) & FLASH TANK (V‐220/V‐420)SIZE :ID 2794 X 38.2

MAT’L :SA 516 Gr 70 + Clad 304L

Project ExperiencesSOUTH EAST SUMATERA GAS PROJECTSLUG RECEIVER (V‐920)SIZE :ID 2743.2 X 9,244Shell Thk : 42mm

WEIGHT :77,130 lbs

MAT’L :SA 516 Gr 70

Project ExperiencesPT PERTAMINA (Persero) RU‐II DUMAIPlatforming Combine Feed Exchanger (CFE 300‐E‐1)SIZE :ID 1346 X 21,519Tube length : 18,293

WEIGHT :75,960 Kg

Design Press/TempShell Side :10.5 Kg/cm2 & FV

Tube Side :13.5 Kg/cm2 & FV

Project ExperiencesPT PERTAMINA (Persero) RU‐II DUMAIPlatforming Combine Feed Exchanger (CFE 300‐E‐1)MATERIALShell Side :SA 516 gr 70 (bottom)SA 387 Gr.11 cl 2 (top)

Channel Side :SA 387 Gr.11 cl 2

Tube :SA 213 T 11

Tube length :  18,293 mm

Project ExperiencesPT PERTAMINA (Persero) RU‐IV CILACAPPlatforming Combine Feed Exchanger (CFE 014‐E‐101A/B)MATERIALShell Side :SA 516 gr 70 (bottom)SA 387 Gr.11 cl 2 (top)

Channel Side :SA 387 Gr.11 cl 2

Tube :SA 213 T 11

Tube length :  18,293 mm

QTY : 2 UnitsTOTAL WEIGHT : 59,000 Kg/units

Project ExperiencesGAS PROJECT ‐ CNOOCEngineering, Procurement and Construction of DEW Point Control System and Production Cooler for SES

Project ExperiencesGAS PROJECT ‐ CNOOCEngineering, Procurement and Construction of DEW Point Control System and Production Cooler for SESType Tube :Low Fin

Mat’l Spec Tube :SA 213 Tp 316L

Material Tube :SA 789 UNS 32750(Super Duplex)

Project ExperiencesGAS PROJECT ‐ CNOOCEngineering, Procurement and Construction of DEW Point Control System and Production Cooler for SES

Welding Tube to Tubesheet

Material Tube :Super Duplex

Project ExperiencesDCS PACKAGE ON PLATFORM

Project ExperiencesPT. PUPUK KALTIMFERTILIZER PLANT

NPK FUSION GRANULATION PLANT303 MT/DAY

Project ExperiencesNORTH DURI DEVELOPMENT PROJECT – CPI# AIR COOLED HEAT EXCHANGER158 MMBTU/HR, 6 BAY‐12 BUNDLE

Fabrication Tube Bundle Pre‐Assbling at Timas Shop

Project ExperiencesNORTH DURI DEVELOPMENT PROJECT – CPI# AIR COOLED HEAT EXCHANGER158 MMBTU/HR, 6 BAY‐12 BUNDLE

Construction at NDD Project Site

Project ExperiencesNORTH DURI DEVELOPMENT PROJECT – CPI# AIR COOLED HEAT EXCHANGER158 MMBTU/HR, 6 BAY‐12 BUNDLE

Construction at NDD Project Site

Project ExperiencesNORTH DURI DEVELOPMENT PROJECT – CPI# DEGASSING FEED HEATER TAGNO. 8121.X.0903/0904/0905/0906

Project Experiences

Pre‐Fabrication at Timas Shop

SANTOS GAS PROCESSING PACKAGE PROJECTEngineering, Procurement and Construction of Module DEW Point Control System

Project Experiences

SANTOS GAS PROCESSING PACKAGE PROJECTEngineering, Procurement and Construction of Module DEW Point Control System

Construction at Project Site

Project ExperiencesKAMBUNA ONSHORE RECEIVING FACILITIES (ORF)Engineering, Procurement and Construction of Module 5A MEG Injection/Regeneration Package

Pre‐Fabrication at Timas Shop

Project Experiences

PROJECT EXPERIENCES

CHEVRON PACIFIC INDONESIA (CPI) – BANGKO PROJECT# GAS BOOT VESSEL ‐ VERTICAL

SIZE : ID 3962.4X19,812 T/T (mm)

Project ExperiencesPT. ALSTOM POWER ENERGY SYSTEM INDONESIA CIKARANG LISTRINDO POWER STATION PHASE VC DEVELOPMENT HP STEAM DRUM

SIZE : ID 1829 X 71thk X 11,142 T/T (D.Press.98 Barg)

Project Experiences

GAJAR BARU PROJECT – Premier Oil Natuna Sea B.VGAS‐GAS EXCHANGER

SIZE :ID 1244 X 71thk X 8726 

Tube Length :D.Press.800 Psig

Shell Mat’l :SA 516 Gr 70Tube Mat’l :SA 213 Tp 316L

Weight empty :28,574 Kg/unit

Project ExperiencesGAJAR BARU PROJECT – Premier Oil Natuna Sea B.VGAS‐GAS EXCHANGER

Insert Tube to Bundle

Tube to Tubesheet welding

Project ExperiencesGAJAR BARU PROJECT – Premier Oil Natuna Sea B.VGAS‐GAS EXCHANGER

Unit HE after Painting

Loading at FOT

Project Experiences

GAJAR BARU PROJECT – Premier Oil Natuna Sea B.V8 UNIT PRESSURE VESSEL

LT Separator    : 1 UnitSLUG Catcher  : 1 UnitHP SCRUBBER : 3 UnitsLP SCRUBBER  : 3 Units

USTAMP for :‐ HP SCRUBBER‐ SLUG Catcher

U1 STAMP for :‐ LP SCRUBBER‐ LT Separator

HP SCRUBBER  : 1745 psig LP SCRUBBER   : 1020 psig

Project Experiences

GAJAR BARU PROJECT – Premier Oil Natuna Sea B.VPRESSURE VESSEL

LOW TEMP. SEPARATOR( Dp : 943.7 psig ) SLUG CATCHER SEPARATOR

( Dp : 916 psig )

Project Experiences

PUSRI IVSUPER HEATER TUBE WHB

Project ExperiencesSHELL & TUBE BUNDLE ASSY TAG NO. 13E – 9A & 13E – 9B

Shell                : SA 516 Gr 70Channel Side : SB 265 gr 2 Tube                : SB 388 Gr 2

Project Experiences

AIR COOLER (110 – E – 7 A/B/C/D )

Project ExperiencesSHELL & BUNDLE HEAT EXCHANGER (701/702‐E‐5) 

Shell                : SA 387 12 CL2Exp. Bellow   : INCONEL 601 Tube                : SA 213 T5

Project ExperiencesPERTAMINA RU IV CILACAPPROPANE COOLER‐22‐E‐2 

Shell                : SA 516 Gr 70Channel Side : SB 265 gr 2Tube                : SB 388 Gr 2

Project ExperiencesTUBE BUNDLE CO2 STRIPPER STEAM REBOILER 1111‐C (3A‐1111‐C)

Tube Sheet     : SA 182 F 304L  U‐Tube            : SA 213 Tp 304L

Our Valued Customer

Our Valued Customer (cont’d)

Our Valued Customer (cont’d)