Topics
What’s that?
Why?
How do we use it?
Should we switch (or add)?
(If we do, what do we need to know?)
25-Jan-11 2 (C) 2011 Entinex, Inc.
Expectations
I’m assuming you know at least a little something about CMMI.
I’m using several SEI slides – on purpose.
By the end of the session, you won’t be experts at CMMI-SVC.
What are your questions?
25-Jan-11 3 (C) 2011 Entinex, Inc.
What’s that?
25-Jan-11 4 (C) 2011 Entinex, Inc.
More about CMMI-SVC
25-Jan-11 5 (C) 2011 Entinex, Inc.
Still more about CMMI-SVC
25-Jan-11 6 (C) 2011 Entinex, Inc.
And more…
25-Jan-11 7 (C) 2011 Entinex, Inc.
Yet more…
25-Jan-11 8 (C) 2011 Entinex, Inc.
OK, now we’re done.
25-Jan-11 9 (C) 2011 Entinex, Inc.
I lied…
25-Jan-11 10 (C) 2011 Entinex, Inc.
WHY?
What’s special about Services that it needs a CMMI?
25-Jan-11 11 (C) 2011 Entinex, Inc.
Why CMMI-SVC?
25-Jan-11 12 (C) 2011 Entinex, Inc.
More on “Why?”
25-Jan-11 13 (C) 2011 Entinex, Inc.
The Differences Matter A Lot
25-Jan-11 14 (C) 2011 Entinex, Inc.
Differences that Show Up:
25-Jan-11 15 (C) 2011 Entinex, Inc.
Here’s what I have to say:
Services are “closer” to the customer.
Issues, failures and therefore improvement are more prominent.
A “benchmarkable” framework for improvement didn’t exist.
Other frameworks and models lack built-in infrastructure for institutionalization.
Services are a disproportionate majority of technical work.
CMMI-DEV is inappropriate for organizations providing services.
Technical work can be a “black box” in a service system.
25-Jan-11 16 (C) 2011 Entinex, Inc.
HOW DO WE USE IT?
CMMI for Services Nuts and Bolts
25-Jan-11 17 (C) 2011 Entinex, Inc.
Process Areas
25-Jan-11 18 (C) 2011 Entinex, Inc.
Development looks like
25-Jan-11 19 (C) 2011 Entinex, Inc.
Service perspective on same
25-Jan-11 20 (C) 2011 Entinex, Inc.
“Developing” a Service
25-Jan-11 21 (C) 2011 Entinex, Inc.
To Develop a Service…
25-Jan-11 22 (C) 2011 Entinex, Inc.
Using DEV and SVC Together
25-Jan-11 23 (C) 2011 Entinex, Inc.
Playing nicely with others
25-Jan-11 24 (C) 2011 Entinex, Inc.
Since you *must* ask!
Maturity Level 2
Maturity Level 3
Maturity Level 4
Maturity Level 5
25-Jan-11 25 (C) 2011 Entinex, Inc.
CM MA PPQA REQM SAM WMC WP SD
DAR IWM RSKM CAM IRP SCON
OPF OPD OT SST STSM SSD
OPP QWM
CAR OPM
SHOULD WE SWITCH?
Does CMMI-SVC matter to you?
25-Jan-11 26 (C) 2011 Entinex, Inc.
What do you care about?
25-Jan-11 27 (C) 2011 Entinex, Inc.
Ask yourself…
25-Jan-11 28 (C) 2011 Entinex, Inc.
Things to consider
25-Jan-11 29 (C) 2011 Entinex, Inc.
If you DO Switch (or add)
SCAMPI Lead Appraisers, Team Leads and Appraisal team members need to be qualified:
1-day Services Supplement to Intro to CMMI-DEV
3-day Intro to CMMI for Services
Appraisal evidence will likely be different even for PAs that are the same.
Combination SCAMPIs are allowed but besides evidence, may require different participants and team members.
Service dynamics are very different from development… … …
25-Jan-11 30 (C) 2011 Entinex, Inc.
THANKS FOR YOUR
ATTENTION!
Questions?
25-Jan-11 31 (C) 2011 Entinex, Inc.
25-Jan-11 32 (C) 2011 Entinex, Inc.
top related