Classroom Renovation Projects & Plans
Prepared for the Chancellor’s ADA & Accessibility Advisory Committee
Mike Priem
Campus Planning & Management
Recently Completed
CAPITAL FUNDED RENOVATION PROJECTS @ FOUR LOCATIONS
ACROSS CAMPUS:
• BOLTON Hall B79 / B85 / B87 / B93
• CUNNINGHAM HALL 107
• LAPHAM HALL 162
• MITCHELL HALL 191 / 195
ADA / Universal Design Updates:
• WHITEBOARDS INSTALLED @ 30” ABOVE FLOOR
• NEW LIGHT SWITCHES INSTALLED @ 30” ABOVE FLOOR
• CONTRASTING COLOR USED FOR DOOR FRAMES& STAIR NOSINGS
• HEIGHT ADJUSTABLE TEACHING CONSOLES
• HEIGHT ADJUSTABLE STUDENT TABLES
B O L B 7 9 / B 8 3 / B 8 7 / B 9 3C O N V E R T ( 4 ) 2 5 - S E A T C L A S S R O O M S
Current capacities at 25-28 per room
B O L B 7 9 / B 8 3 / B 8 7 / B 9 3C R E A T E ( 2 ) 6 0 - S E A T C L A S S R O O M S
B O L B 7 9 / B 8 3 / B 8 7 / B 9 3C R E A T E ( 2 ) 6 0 - S E A T C L A S S R O O M S
HA
RT
FO
RD
AV
EN
UE
C U N N I N G H A M 1 0 7 / 1 9 51 0 8 - S E A T A C T I V E L E A R N I N G C L A S S R O O M
C U N N I N G H A M 1 0 7 / 1 9 51 0 8 - S E A T A C T I V E L E A R N I N G C L A S S R O O M
L A P 1 6 2U P G R A D E L E C T U R E H A L L
CONVERT FROM
22” TO 24” WIDE SEATS.
CAPACITY REDUCED FROM
355 TO 309 STUDENTS.
+ IMPROVED LIGHTING CONTROLS
A/V AND FINISHES
L A P 1 6 2U P G R A D E L E C T U R E H A L L
M I T 1 9 1 / 1 9 5R E M O V E T I E R E D F L O O R
M I T 1 9 1 / 1 9 57 2 - S E A T F L E X I B L E F O R M A T C L A S S R O O M S
M I T 1 9 1 / 1 9 57 2 - S E A T F L E X I B L E F O R M A T C L A S S R O O M S
Upcoming Capital Funded Project
TENTATIVE TIMELINE
• SUMMER/FALL 17 – DESIGN DEVELOPMENT
• WINTER 18 – CONSTRUCTION CONTRACTING
• SPRING 18 – CONSTRUCTION
• FALL 18 – ROOMS ACTIVATED
Upcoming Project – EMS West Renovations
REMOVE DEVISING WALLS BETWEEN (6) 15-20 SEAT CLASSROOMS
Existing Floor Plan
EMS W109 – W130 Renovation Project
CREATE FOUR 30-SEAT CLASSROOMS WITH IMPROVED (LEVEL-3) TEACHING TECHNOLOGIES
Proposed Plan
EMS W109 – W130 Renovation Project
Requesting 1 or 2 ADAAAC Representatives
• Attend 3 or 4 Design Development Meetings (6 –12 hour commitment)
• Conduct Plan Review Session (1-2 hour commitment)