Classroom Renovation Projects & Plans

Prepared for the Chancellor’s ADA & Accessibility Advisory Committee

Mike Priem

Campus Planning & Management

Recently Completed

CAPITAL FUNDED RENOVATION PROJECTS @ FOUR LOCATIONS

ACROSS CAMPUS:

• BOLTON Hall B79 / B85 / B87 / B93

• CUNNINGHAM HALL 107

• LAPHAM HALL 162

• MITCHELL HALL 191 / 195

ADA / Universal Design Updates:

• WHITEBOARDS INSTALLED @ 30” ABOVE FLOOR

• NEW LIGHT SWITCHES INSTALLED @ 30” ABOVE FLOOR

• CONTRASTING COLOR USED FOR DOOR FRAMES& STAIR NOSINGS

• HEIGHT ADJUSTABLE TEACHING CONSOLES

• HEIGHT ADJUSTABLE STUDENT TABLES

B O L B 7 9 / B 8 3 / B 8 7 / B 9 3C O N V E R T ( 4 ) 2 5 - S E A T C L A S S R O O M S

Current capacities at 25-28 per room

B O L B 7 9 / B 8 3 / B 8 7 / B 9 3C R E A T E ( 2 ) 6 0 - S E A T C L A S S R O O M S

B O L B 7 9 / B 8 3 / B 8 7 / B 9 3C R E A T E ( 2 ) 6 0 - S E A T C L A S S R O O M S

HA

RT

FO

RD

AV

EN

UE

C U N N I N G H A M 1 0 7 / 1 9 51 0 8 - S E A T A C T I V E L E A R N I N G C L A S S R O O M

C U N N I N G H A M 1 0 7 / 1 9 51 0 8 - S E A T A C T I V E L E A R N I N G C L A S S R O O M

L A P 1 6 2U P G R A D E L E C T U R E H A L L

CONVERT FROM

22” TO 24” WIDE SEATS.

CAPACITY REDUCED FROM

355 TO 309 STUDENTS.

+ IMPROVED LIGHTING CONTROLS

A/V AND FINISHES

L A P 1 6 2U P G R A D E L E C T U R E H A L L

M I T 1 9 1 / 1 9 5R E M O V E T I E R E D F L O O R

M I T 1 9 1 / 1 9 57 2 - S E A T F L E X I B L E F O R M A T C L A S S R O O M S

M I T 1 9 1 / 1 9 57 2 - S E A T F L E X I B L E F O R M A T C L A S S R O O M S

Upcoming Capital Funded Project

TENTATIVE TIMELINE

• SUMMER/FALL 17 – DESIGN DEVELOPMENT

• WINTER 18 – CONSTRUCTION CONTRACTING

• SPRING 18 – CONSTRUCTION

• FALL 18 – ROOMS ACTIVATED

Upcoming Project – EMS West Renovations

REMOVE DEVISING WALLS BETWEEN (6) 15-20 SEAT CLASSROOMS

Existing Floor Plan

EMS W109 – W130 Renovation Project

CREATE FOUR 30-SEAT CLASSROOMS WITH IMPROVED (LEVEL-3) TEACHING TECHNOLOGIES

Proposed Plan

EMS W109 – W130 Renovation Project

Requesting 1 or 2 ADAAAC Representatives

• Attend 3 or 4 Design Development Meetings (6 –12 hour commitment)

• Conduct Plan Review Session (1-2 hour commitment)