Chapter 6Integer and Goal

Programming Models

Jason C. H. Chen, Ph.D.Professor of MIS

School of Business AdministrationGonzaga UniversitySpokane, WA 99223

chen@jepson.gonzaga.edu

Dr. Chen, Decision Support Systems 2

Variations of Basic Linear Programming

• Integer Programming

• Goal Programming

• Nonlinear Programming (skip)

Dr. Chen, Decision Support Systems 3

Integer Programming (IP)Where some or all decision variables are

required to be whole numbers.

• General Integer Variables (0,1,2,3,etc.)

Values that count how many

• Binary Integer Variables (0 or 1)

Usually represent a Yes/No decision

Dr. Chen, Decision Support Systems 4

General Integer Example:Harrison Electric Co.

Produce 2 products (lamps and ceiling fans) using 2 limited resources

Decision: How many of each product to make? (must be integers)

Objective: Maximize profit

Dr. Chen, Decision Support Systems 5

Decision VariablesL = number of lamps to make

F = number of ceiling fans to make

Lamps(per lamp)

Fans(per fan)

Hours Available

Profit Contribution

$600 $700

Wiring Hours 2 hrs 3 hrs 12

Assembly Hours 6 hrs 5 hr 30

Dr. Chen, Decision Support Systems 6

LP Model Summary

Max 600 L + 700 F ($ of profit)

Subject to the constraints:

2L + 3F < 12 (wiring hours)

6L + 5F < 30 (assembly hours)

L, F > 0

Dr. Chen, Decision Support Systems 7

Graphical Solution

Dr. Chen, Decision Support Systems 8

Properties of Integer Solutions

• Rounding off the LP solution might not yield the optimal IP solution

• The IP objective function value is usually worse than the LP value

• IP solutions are usually not at corner points

Dr. Chen, Decision Support Systems 9

Using Solver for IP • IP models are formulated in Excel in the

same way as LP models

• The additional integer restriction is entered like an additional constraint

int - Means general integer variables

bin - Means binary variables

Go to file 6-1.xls

Dr. Chen, Decision Support Systems 10

Harrison Electric (General Integer)

L F

 Lamp

s Fans

Number of units 3.00 2.00

Profit $600 $700 $3,200.00

Constraints:      

Wiring hours 2 3 12.00 <= 12

Assembly hours 6 5 28.00 <= 30

LHS Sign RHS

Go to file 6-1.xls

Dr. Chen, Decision Support Systems 11

Binary Integer Example:Portfolio Selection

Choosing stocks to include in portfolio

Decision: Which of 7 stocks to include?

Objective: Maximize expected annual return (in $1000’s)

Dr. Chen, Decision Support Systems 12

Stock Data

Dr. Chen, Decision Support Systems 13

Decision Variables

Use the first letter of each stock’s name

Example for Trans-Texas Oil:

T = 1 if Trans-Texas Oil is included

T = 0 if not included

Dr. Chen, Decision Support Systems 14

Restrictions• Invest up to $3 million

• Include at least 2 Texas companies

• Include no more than 1 foreign company

• Include exactly 1 California company

• If British Petro is included, then

Trans-Texas Oil must also be included

Dr. Chen, Decision Support Systems 15

Objective Function (in $1000’s return)

Max 50T + 80B + 90D + 120H + 110L + 40S + 75C

Subject to the constraints:

Invest up to $3 Million

480T + 540B + 680D + 1000H

+ 700L + 510S + 900C < 3000

Dr. Chen, Decision Support Systems 16

Include At Least 2 Texas Companies

T + H + L > 2

Include No More Than 1 Foreign Company

B + D < 1

Include Exactly 1 California Company

S + C = 1

Dr. Chen, Decision Support Systems 17

If British Petro is included (B=1), then

Trans-Texas Oil must also be included (T=1)

T=0 T=1

B=0 ok ok

B=1 not ok ok

allows the 3 acceptable combinations and prevents the unacceptable one

Combinationsof B and T

B < T

Dr. Chen, Decision Support Systems 18

IP Model for Portfolio Selection

Max $50T + $80B + $90D + $120H + $110L + $40S + $75C

Subject to the constraints:

480T + 540B + 680D + 1000H + 700L + 510S + 900C < 3000 (investment limit)T + H + L > 2 (Texas companies)B + D < 1 (foreign companies)S + C = 1 (California companies)B < T (Trans-Texas and British petro)

All variables = 0 or 1

Go to file 6-3.xls

Dr. Chen, Decision Support Systems 19

Simkin and Steinberg (Binary)

T B D H L S C

 

Trans-Texas Oil

British

Petro

Dutch

Shell

Houston Oil

Lone Star Petr

o

San Diego Oil

Calif

Petro

Invest? (1 = Yes, 0 = No) 0 0 1 1 1 1 0

Exp annual return ('000) $50 $80 $90 $120 $110 $40 $75 $360

Constraints:      

Investment limit 480 540 680 1000 700 510 900 2890 <= 3000

Foreign companies 1 1 1 <= 1

British & Trans-Texas 1 0 <= 0

Texas companies 1 1 1 2 >= 2

California companies           1 1 1 = 1

LHS Sign RHS

Go to file 6-3.xls

Dr. Chen, Decision Support Systems 20

Goal Programming Models• Permit multiple objectives

• Try to “satisfy” goals rather than optimize

• Objective is to minimize underachievement of goals

Dr. Chen, Decision Support Systems 21

Goal Programming Example:Wilson Doors Co.

Makes 3 types of doors from 3 limited resources

Decision: How many of each of 3 types of doors to make?

Objective: Minimize total underachievement of goals

Dr. Chen, Decision Support Systems 22

Data

Dr. Chen, Decision Support Systems 23

LP Model

Maximize $70E+ $110I + $110C

St.

4E + 3I + 7 C < 9,000 (steel usage)

2E + 4I + 3C < 6,000 (forming time)

2E + 3I + 4C < 5,200 (assembly time)

E, I, C > 0

Go to file 6-6.xls

Dr. Chen, Decision Support Systems 24

Wilson Doors (LP)

  E I C

 Exterior doors

Interior doors

Comm doors

Number of units 1400.00 800.00 0.00

Revenue $70 $110 $110 $186,000.00

Constraints:            

Steel usage 4 3 7 8000.00 <= 9000

Forming time 2 4 3 6000.00 <= 6000

Assembly time 2 3 4 5200.00 <= 5200

LHS Sign RHS

LP Solution (File: 6-6.xls)

E: 1400, I=800, and C=0 with a total sales of $186,000

Dr. Chen, Decision Support Systems 25

Goals

1. Total sales at least $180,000

2. Exterior door sales at least $70,000

3. Interior door sales at lest $60,000

4. Commercial door sales at least $35,000

Dr. Chen, Decision Support Systems 26

Regular Decision Variables

E = number of exterior doors made

I = number of interior doors made

C = number of commercial doors made

Deviation Variables

di+ = amount by which goal i is overachieved

di- = amount by which goal i is underachieved

Dr. Chen, Decision Support Systems 27

Goal ConstraintsGoal 1: Total sales at least $180,000

70E + 110I + 110C + dT- - dT

+ = 180,000

Goal 2: Exterior door sales at least $70,000

70E + dE- - dE

+ = 70,000

Note: Each highlighted deviation variable measures goal underachievement

Dr. Chen, Decision Support Systems 28

Goal 3: Interior door sales at least $60,000

110 I + dI- - dI

+ = 60,000

Goal 4: Commercial door sales at least

$35,000

110C + dC- - dC

+ = 35,000

Dr. Chen, Decision Support Systems 29

Goals1. Total sales at least $180,000

2. Exterior door sales at least $70,000

3. Interior door sales at lest $60,000

4. Commercial door sales at least $35,000

Goal 1: 70E + 110I + 110C + dT- - dT

+ = 180,000

Goal 2: 70E + dE- - dE

+ = 70,000

Goal 3: 110 I + dI- - dI

+ = 60,000

Goal 4: 110C + dC- - dC

+ = 35,000

Dr. Chen, Decision Support Systems 30

Objective Function

Minimize total goal underachievement

Min dT- + dE

- + dI- + dC

-

Subject to the constraints:

• The 4 goal constraints

• The “regular” constraints (3 limited resources)

• nonnegativity

Dr. Chen, Decision Support Systems 31

Objective Function

Minimize dT- + dE

- + dI- + dC

-

Subject to the constraints:

70E + 110I + 110C + dT- - dT

+ = 180,000 (total sales goal)

70E + dE- - dE

+ = 70,000 (exterior door sales goal)

110 I + dI- - dI

+ = 60,000 (interior door sales goal)

110C + dC- - dC

+ = 35,000 (comm. door sales goal)

4E + 3I + 7 C < 9,000 (steel usage)2E + 4I + 3C < 6,000 (forming time)2E + 3I + 4C < 5,200 (assembly time)

E, I, C, dT-, dT

+, dE- , dE

+, dI- , dI

+, dC- , dC

+ > 0Go to file 6-6.xls

Dr. Chen, Decision Support Systems 32

Weighted Goals• When goals have different priorities,

weights can be used

• Suppose that Goal 1 is 5 times more important than each of the others

Objective Function

Min 5dT- + dE

- + dI- + dC

-

Go to file 6-6.xls, sheet:6-6A

Dr. Chen, Decision Support Systems 33

Wilson Doors (Weighted GP #1)

  E I C dT- dT

+ dE- dE

+ dI- dI

+ dC- dC

+

 Exterior doors

Interior

doorsComm doors

Under

ach tota

l sale

s

Over

ach tota

l sale

s

Under

ach exter

doors

Over

ach exter

doors

Under

ach inte

r doors

Over ach inter

doors

Under ach

comm doors

Over

ach co

mm doors

Solution value1000.0

0800.0

0200.0

00.00

0.00

0.00

0.00

0.00

28000.00

13000.00

0.00

Goal weights       5   1   1   1   13000.00

Constraints:                             Achieved

Total sales goal 70 110 110 1 -1  180000.0

0 =18000

0180000.0

0

Exterior doors goal 70   1 -1   70000.00 = 70000 70000.00

Interior doors goal   110   1 -1   60000.00 = 60000 88000.00

Comm doors goal     110             1 -1 35000.00 = 35000 22000.00

Steel usage 4 3 7                 7800.00 <= 9000

Forming time 2 4 3   5800.00 <= 6000

Assembly time 2 3 4                 5200.00 <= 5200

LHSSign RHS

Go to file 6-6.xls, sheet:6-6A GP#1

Dr. Chen, Decision Support Systems 34

Properties of Weighted Goals• Solution may differ depending on the weights

used• Appropriate only if goals are measured in the

same units

• What if Goal 1 is only 2.5 times important than each of the others?

Objective Function

Min 2.5dT- + dE

- + dI- + dC

-

Go to file 6-6.xls, sheet:6-6B GP#2, 6-6B IP

Dr. Chen, Decision Support Systems 35

Wilson Doors (Weighted GP #2)

  E I C dT- dT

+ dE- dE

+ dI- dI

+ dC- dC

+

 Exterior doors

Interior doors

Comm doors

Under ach total

sales

Over

ach total sale

s

Under

ach exte

r door

s

Over

ach exte

r door

s

Under

ach inter door

s

Over ach inter doors

Under

ach comm

doors

Over

ach comm

doors

Solution value 1000.00 642.42 318.18 4333.33 0.00 0.00 0.00 0.00 10666.67 0.00 0.0

Goal weights       2.5   1   1   1   10833.33

Constraints:                             Achieved

Total sales goal 70 110 110 1 -1   180000.00 = 180000 175666.67

Exterior doors goal 70   1 -1   70000.00 = 70000 70000.00

Interior doors goal   110   1 -1   60000.00 = 60000 70666.67

Comm doors goal     110             1 -1 35000.00 = 35000 35000.00

Steel usage 4 3 7                 8154.55 <= 9000

Forming time 2 4 3   5524.24 <= 6000

Assembly time 2 3 4                 5200.00 <= 5200

LHS Sign RHS

Go to file 6-6.xls, sheet:6-6B GP#2

Dr. Chen, Decision Support Systems 36

Wilson Doors (Weighted GP #2 - IP)

  E I C dT- dT

+ dE- dE

+ dI- dI

+ dC- dC

+

 Exterior doors

Interior doors

Comm doors

Under ach total

sales

Over

ach total sale

s

Under

ach exte

r door

s

Over

ach exte

r door

s

Under

ach inter door

s

Over ach inter doors

Under ach

comm doors

Over

ach comm

doors

Solution value 1000.00 644.00 317.00 4290.00 0.00 0.00 0.00 0.00 10840.00 130.00 0.0

Goal weights       2.5   1   1   1   10855.00

Constraints:                             Achieved

Total sales goal 70 110 110 1 -1   180000.00 = 180000 175710.00

Exterior doors goal 70   1 -1   70000.00 = 70000 70000.00

Interior doors goal   110   1 -1   60000.00 = 60000 70840.00

Comm doors goal     110             1 -1 35000.00 = 35000 34870.00

Steel usage 4 3 7                 8151.00 <= 9000

Forming time 2 4 3   5527.00 <= 6000

Assembly time 2 3 4                 5200.00 <= 5200

LHS Sign RHS

Go to file 6-6.xls, sheet:6-6B IP

Dr. Chen, Decision Support Systems 37

Ranked Goals• Lower ranked goals are considered only if

all higher ranked goals are achieved

• Suppose they added a 5th goal Goal 5: Steel usage as close to 9000 lb

as possible

4E + 3I + 7C + dS- = 9000 (lbs steel)

(no dS+ is needed because we cannot

exceed 9000 pounds)

Dr. Chen, Decision Support Systems 38

• Rank R1: Goal 1

• Rank R2: Goal 5

• Rank R3: Goals 2, 3, and 4

A series of LP models must be solved

1) Solve for the R1 goal while ignoring the other goals

Objective Function: Min dT-

Dr. Chen, Decision Support Systems 39

Objective Function

Objective Function: Min dT-

Subject to the constraints:

70E + 110I + 110C + dT- - dT

+ = 180,000 (total sales goal)

4E + 3I + 7C + dS- = 9000 (steel usage goal)

70E + dE- - dE

+ = 70,000 (exterior door sales goal)

110 I + dI- - dI

+ = 60,000 (interior door sales goal)

110C + dC- - dC

+ = 35,000 (comm. door sales goal)

4E + 3I + 7 C < 9,000 (steel usage)2E + 4I + 3C < 6,000 (forming time)2E + 3I + 4C < 5,200 (assembly time)

E, I, C, dT-, dT

+, dE- , dE

+, dI- , dI

+, dC- , dC

+ > 0

Go to file 6-7.xls

Dr. Chen, Decision Support Systems 40

Wilson Doors (Rank R1 Goals Only)

  E I C dT- dT

+ dS- dE

- dE+ dI

- dI+ dC

- dC+

 Exterior doors

Interior

doorsComm doors

Under

ach tota

l sale

s

Over

ach tota

l sale

s

Under ach steel

usage

Under

ach exter

doors

Over

ach exter

doors

Under

ach inte

r doors

Over ach inter doors

Under ach

comm doors

Over

ach co

mm doors

Solution value 1000.00800.0

0200.0

00.00

0.00 1200.00

0.00

0.00

0.00 28000.00 13000.00

0.00

Objective coeff       1                 0.00

Constraints:                               Achieved

Total sales goal 70 110 110 1 -1               180000.00 = 180000 180000.00

Steel usage goal 4 3 7     1             9000.00 = 9000 7800.00

Exterior doors goal 70   1 -1   70000.00 = 70000 70000.00

Interior doors goal   110   1 -1   60000.00 = 60000 88000.00

Comm doors goal     110               1 -1 35000.00 = 35000 22000.00

Forming time 2 4 3   5800.00 <= 6000

Assembly time 2 3 4                   5200.00 <= 5200

LHSSign RHS

Go to file 6-7A R1.xls

Dr. Chen, Decision Support Systems 41

2) If the R1 goal can be achieved (dT- = 0),

then this is added as a constraint and we attempt to satisfy the R2 goal (Goal 5)

Objective Function: Min dS-

3) If the R2 goal can be achieved (dS- = 0),

then this is added as a constraint and we solve for the R3 goals (Goals 2, 3, and 4)

Objective Function: Min dE- + dI- + dC

- Go to file 6-7.xls

Dr. Chen, Decision Support Systems 42

Wilson Doors (Rank R2 Goals Only)

  E I C dT- dT

+ dS- dE

- dE+ dI

- dI+ dC

- dC+

 Exterior doors

Interior doors

Comm

doors

Under

ach total sale

s

Over ach total sales

Under

ach stee

l usage

Under

ach exte

r door

s

Over ach exter doors

Under ach inter

doors

Over

ach inter door

s

Under ach comm doors

Over

ach comm

doors

Solution value 1900.00 466.67 0.00 0.00 4333.33 0.00 0.00 63000.00 8666.67 0.00 35000.00 0.00

Objective coeff           1             0.00

Constraints:                               Achieved

Total sales goal 70 110 110 1 -1               180000.00 = 180000 184333.33

Steel usage goal 4 3 7     1             9000.00 = 9000 9000.00

Exterior doors goal 70   1 -1   70000.00 = 70000 133000.00

Interior doors goal   110   1 -1   60000.00 = 60000 51333.33

Comm doors goal     110               1 -1 35000.00 = 35000 0.00

Forming time 2 4 3   5666.67 <= 6000

Assembly time 2 3 4                   5200.00 <= 5200

LHS Sign RHS

Go to file 6-7B R2.xls

Dr. Chen, Decision Support Systems 43

Wilson Doors (Rank R2 Goals Only - IP)

  E I C dT- dT

+ dS- dE

- dE+ dI

- dI+ dC

- dC+

 Exterior doors

Interior doors

Comm doors

Under

ach total sale

s

Over ach total sales

Under

ach steel usag

e

Under

ach exte

r door

sOver ach

exter doorsUnder ach inter doors

Over ach inter door

s

Under ach comm doors

Over ach comm

doors

Solution value 1699.00 422.00 134.00 0.00 90.00 0.00 0.00 48930.00 13580.00 0.00 20260.00 0.00

Objective coeff           1             0.00

Constraints:                               Achieved

Total sales goal 70 110 110 1 -1               180000.00 = 180000 180090.00

Steel usage goal 4 3 7     1             9000.00 = 9000 9000.00

Exterior doors goal 70   1 -1   70000.00 = 70000 118930.00

Interior doors goal   110   1 -1   60000.00 = 60000 46420.00

Comm doors goal     110               1 -1 35000.00 = 35000 14740.00

Forming time 2 4 3   5488.00 <= 6000

Assembly time 2 3 4                   5200.00 <= 5200

LHS Sign RHS

Go to file 6-7B R2 IP.xls

Dr. Chen, Decision Support Systems 44

Wilson Doors (Rank R3 Goals Only)

  E I C dT- dT

+ dS- dE

- dE+ dI

- dI+ dC

- dC+

 Exterior doors

Interior doors

Comm doors

Under

ach total sale

s

Over ach total sale

s

Under

ach steel usag

e

Under

ach exter door

sOver ach

exter doorsUnder ach inter doors

Over ach inter door

s

Under ach comm doors

Over ach comm

doors

Solution value 1694.74 421.05 136.84 0.00 0.00 0.00 0.00 48631.58 13684.21 0.00 19947.37 0.00

Objective coeff             1   1   1   33631.58

Constraints:                               Achieved

Total sales goal 70 110 110 1 -1               180000.00 = 180000 180000.00

Steel usage goal 4 3 7     1             9000.00 = 9000 9000.00

Exterior doors goal 70   1 -1   70000.00 = 70000 118631.58

Interior doors goal   110   1 -1   60000.00 = 60000 46315.79

Comm doors goal     110               1 -1 35000.00 = 35000 15052.63

Forming time 2 4 3   5484.21 <= 6000

Assembly time 2 3 4                   5200.00 <= 5200

LHS Sign RHS

Go to file 6-7C R3.xls

Dr. Chen, Decision Support Systems 45

Go to file 6-7C R3 IP.xls

Wilson Doors (Rank R3 Goals Only - IP)

  E I C dT- dT

+ dS- dE

- dE+ dI

- dI+ dC

- dC+

 Exterior doors

Interior doors

Comm doors

Under

ach total sale

s

Over ach total sales

Under

ach steel usage

Under

ach exte

r door

s

Over ach exter doors

Under ach inter doors

Over

ach inter door

s

Under ach comm doors

Over

ach comm

doors

Solution value 1699.00 422.00 134.00 0.00 90.00 0.00 0.00 48930.00 13580.00 0.00 20260.00 0.00

Objective coeff             1   1   1   33840.00

Constraints:                               Achieved

Total sales goal 70 110 110 1 -1               180000.00 = 180000 180090.00

Steel usage goal 4 3 7     1             9000.00 = 9000 9000.00

Exterior doors goal 70   1 -1   70000.00 = 70000 118930.00

Interior doors goal   110   1 -1   60000.00 = 60000 46420.00

Comm doors goal     110               1 -1 35000.00 = 35000 14740.00

Forming time 2 4 3   5488.00 <= 6000

Assembly time 2 3 4                   5200.00 <= 5200

LHS Sign RHS

top related