CHAPTER 1.INTRODUCTION
1.1 PURPOSE AND PROJECT DESCRIPTION
In 1999, King County expanded the service area of its surface water utility to much of the rural area of theCounty. The County is committed to providing a comprehensive surface water program to these newareas. This rapid rural reconnaissance report provides a general overview of the existing conditions,problems, and identifies high priority capital improvements and opportunities related to surface water,groundwater, and nearshore habitat on Vashon-Maury Island (VMI).
1.2 STUDY AREA
A detail investigation of all of Vashon-Maury Island could not be made at this time because of budgetaryconstraints. Judd Creek and Shinglemill Creek basins were selected for a detail investigation because theyare the largest basins on the island and are experiencing the most growth problems.
The Judd Creek Basin covers 3,292 acres (5.1 square miles) or approximately 14% of VMI and is locatedin the middle of Vashon Island. Judd Creek, which discharges into Puget Sound through QuartermasterHarbor, is 3.0 miles long. The elevation of the Judd Creek Basin varies from sea level in the south to over440 feet in the north. Soil types in the watershed are approximately 69 percent till, 30 percent outwashand about 1 percent wetland. Under existing (2001) land use conditions, 2.2 percent of the basin isestimated to be impervious as shown in Table 2-10.
The Shinglemill Creek Basin covers 1,846 acres (2.9 square miles) or approximately 8% of VMI and islocated in the northern portion of Vashon Island. Shinglemill Creek, which discharges into Puget Soundnear the northwest corner of the island, is 2.7 miles long. The elevation of the Shinglemill Creek Basinvaries from sea level to about 420 feet at its southern end. Soil types in the watershed are approximately98 percent till, 1.5 percent outwash and 0.5 percent wetland. Under existing (2001) land use conditions,2.0 percent of the basin is estimated to be impervious.
Washington Trout identified 75 drainage basins on Vashon and Maury Island including the Judd Creekand Shinglemill Creek basins. Details of the Washington Trout report can be reviewed on their websitehttp://www.washingtontrout.org/vashon/vashon2001/ vashon Title.shtml. The drainage areas of the 73other basins range from 14 to 1,117 acres. Analysis of these basins did not include modeling and reliedheavily on existing information with only limited field investigation to determine existing needs.
The groundwater and nearshore habitat study area is island-wide. The Vashon-Maury Island nearshoreaccounts for 51 miles of shoreline. Figure 1-1 shows a map of the island and basin delineations.
1.3 PROJECT GOALS
The Vashon-Maury Island rapid rural reconnaissance report has two goals:
• Characterization—To produce a rapid, systematic inventory and ecological analysis ofstream conditions and drainage systems for both the Judd Creek and Shinglemill Creekdrainage basins, covering resources and problems under both current and future landuses. Each subbasin within these two basins was ranked, classified as “impacted,”“sensitive,” or “not supporting,” and identified as “restorable” or not, using definitions
KING COUNTY RAPID RURAL RECONNAISSANCE
h
h
f
f
f
f
f
59
8
60
55
51
54
52
50
53
49
27
61
28
14
38 Chen Cr.
37 Tahlequah Cr.
72
68
46 North Dockton Cr.41 Fisher Cr.
18 Garden Cr.
30 Bates Cr.
65 Gorsuch Cr.
45 Mileta Cr.
75 Triple Brook Cr. 64 Beall Cr.
47 Middle Dockton Cr.
63 Ellisport Cr.
67 Glen Acres Cr.
44 Raab's Cr.
42 Judd Cr.
20 Robinwood Cr.
16 Skeeter Cr.
32 Camp Sealth Cr.
74
10 McCormick Cr.
21 Green Valley Cr.
26
40 Shawnee Cr.
66 Dilworth Cr.
15 Ober Beach Cr.
43 Tsugwalla Cr.
2 Sylvan Beach Cr.
62 Ellis Cr.
22 Lisabuela Park Cr.
57 Maury Is. Pk. Cr.
23 Christensen Cr.
12 Shinglemill Cr.
34 Spring Beach Cr.
31 Paradise Cove Cr.
29
6
9
56
13
73 5
69
3
58
71 70
4
25
39 Lost Lake Cr.
33
35
19 Leo's Cr.
48 South Dockton Cr.
24 Cross Landing Cr.
36 Slaughter's Cr.
11 Baldwin Cr.
1 McLeod Cr.
17 Cove Cr.
7 Water Wheel Cr.
Vash
on H
wy
SW
16th
Ave
SW
Vash
on H
wy
SW
Vashon Hwy SW
SW Bank Rd
Westsi de H
wy S
W
Bea
l Rd
SW
SW 232nd St
26th
Ave
SW
Mar
ine
View
Dr S
W
99t h
Ave
SW
SW Point Robinson Rd
Ridge Rd SW
SW 220th St
SW 172nd St
SW 240th St
111t
h A
ve S
W
Mon
umen
t Rd
SW
87th
Ave
SW
SW 204th St
Map
lew
i ld A
ve S
W
91s t
Av e
SW
115t
h A
v e S
W
1 6t h
Av e
SW
SW 106th St
SW Cemetery Rd
119t
h A
ve S
W
107 t
h A
v e S
W
21st
Ave
SW
SW 148th St
SW 156th St
Doc
kton
Rd
SW
Wax
Orc
har d
Rd
SW
SW Cove Rd
SW Cemetery Rd
SW 152nd St
Wes
tsid
e H
wy
SW
SW Quartermaster Dr
SW 116th St
Dock St
SW Ellisport Rd
21st
Ave
SW
SW 220th St
SW 160th St
100
200
300
400
400
200
100
200
100
100
100
100
100
300
300
300
400
200
100
300
100
100
200
200
300
100
100
400
300
200
400
100
200
100
200
300
400
100
100
200
200
200
100
200
300
300
100
100
100
200
300
200
100
300
200
400
200
300
100
200
100
300
200
200
100
100
100
200
300
200
300
200
300
100
300
400
400
400
300
200
100200
300
100
100
200
400
200
400
400
300
400
300
300
200
100
200
200
200
300
300
300
300
200
300
100
200
300
200
200
400
200
100
100
400
200
400
300
100
200
300
200
400
200
300
200
100
200
400
200
200
100
200
300
300
100
200
200
300
300
100
100
300
200
400
200
300
200
300
300
400
300
200
300
200
300
300
100
300
100
300
100
300
300
100
100
200
300
100
300
200
200
200
200400
100
100
200
200
300
200
300
100
300
300
100
200
400
300
300
100
100
300
100100
100
300
Fisher Pond277CBC
138LXO
693EJW
461HKI
019QYL
299DIR
263HVF
982CUR
706BTX
274FAO714KBE
408MXE
384ZJO
508EZA
919HNU
523XDU
957CNJ
630DPZ
441UVQ
719OVC
381EWN
517NBJ
287NVM
056MGD
484EZC
656RJH
551KAQ
800LJS
284GXX
433YPX
541RZO
922VHP
555IVE
309ADY
651KYP
987CHJ
446YDG
029KAX
254VEU
405SAZ
417TID
944NYB
627GQA
769MUA
934BKT
791IHS
655DFD
714MYI577GRD
143NVI
119PDM
790BTK
901UMH
628RYQ
222JSN
194MZE
311RNJ
694MMB
911IRA
125UZH6501
1701
3603
6591
2856
1703
4306
3601
1707
2853
6502
6507
3610B
6508
1711
4301
1712A
2821B
2801
6510
6509
6504
2825A
1754
6520B
4354
2823A
6521B
2820B
2818
6506
2822A
4302
28522814
3604
1702
1751
23824A
Sub-Basin 3
Sub-Basin 1
Sub-Basin 2
Sub-Basin 4
Sub-Basin 3
Sub-Basin 1
Sub-Basin 2
28a
43a
RM 1
RM 2
RM 3
RM 2
RM 1
VASHON ISLAND - CREEK BASINS DELINEATIONS
®1:56,000
0 1 20.5Miles
0 2,000 4,000 6,000 8,000Feet
Date Last Revised: 01\05\04File Name: VASHON_BASE(11X17)
Seattle Sammamish
Bellevue
Kirkland
Kent
Federal WayAuburn
Renton
Puget Sound
P U G E T S O U N D
WA Trout stream types 2 and 3 (WAS 222-16-031)shown as King County Class 2 with salmonids (KCC 21A.06.1240).
P E T E RP O I N T
P O I N TV A S H O N
D O L P H I NP O I N T
P O I N TB E A L S
P O I N TH E Y E R
R O B I N S O NP O I N T
P I N E RP O I N T
N E I L LP O I N T
D A L C OP O I N T
P A R A D I S E C O V E
FE
R N CO
VE
D A L C O P A S S A G E
E A S T PA S S A G EQ
UA
RT
ER
MA
S TE
R H
AR
B O
R
TR
AM
P H
A
RB O R
CO
LV
OS
PA
SS
AG
E
KING C
OUN
TY
KITSAPCOUNTY
PIERCECOUNTY
L:\E
NV
IR IM
PA
CTS
\200
1 pr
ojec
ts\2
1096
Kin
g C
ount
y R
RR
\gis
\Rep
ortF
igur
es\V
asho
n R
epor
t Fig
ures
\vas
hon_
base
(11x
17).m
xd 8
/25/
2003
Watercourses (King Co.)
County Boundaries
Roads
Parks and Other Public Lands
Waterbodies
Vashon Maury Island Land Trust Properties
Wetlands (KC SAO)9 7 9
f River Mile Post
h Stream Gauges
All Other Classifications
Watercourses KC Class 2-S
Mainstem KC Class 2-S
100' Contours
20' Contours
Main Basin Boundaries
Vashon Sub-Basins (Study Area)
WA Trout Sub-Basins
Parcels
SHINGLE MILL
JUDD
Figure 1-1
Vashon-Maury Island Rapid Rural Reconnaissance Report…
1-2
from Watershed Vulnerability Analysis (Center for Watershed Protection 2002). Acomplete description of the watershed Vulnerability Analysis is included in Appendix G.
• Action Plan—To identify high-priority management needs in the study area and torecommend projects, studies, regulations, and programs for surface-water,groundwater, and habitat management.
1.4 PROJECT APPROACH
1.4.1 Characterization
The intent of the rapid rural reconnaissance is to describe ecological stream basin conditions through athorough analysis of all available data for both the Judd Creek and Shinglemill Creek basins. Usingmethods outlined in Watershed Vulnerability Analysis, the characterization analysis describes thehydrologic, geomorphic, and ecological processes that affect habitat and create surface water problems ineach subbasin. The characterization identifies significant resource areas that contribute to ecosystemhealth, including open space and other highly functioning ecological areas. The characterization identifiessignificant flooding, water quality, erosion and aquatic resource problems. It also attempts to project thelikely future conditions of the basin. For the Judd Creek and Shinglemill Creek basins, thecharacterization used available information and a limited amount of newly collected additional data.Table 1-1 summarizes the main elements of the characterization process.
TABLE 1-1.MAIN ELEMENTS OF THE BASIN CHARACTERIZATION PROCESS
Compile Existing Data Analyze and Interpret Data Develop Report
Remote DataAerial photographyGIS Data setsClassified Land CoverPublic LandsSensitive Areas Mapping
Field DataStream TypingRain Gage DataStream Gage DataComplaint RecordsAmbient Water Quality Data
Published Reports Interviews
County staff, other Agencies,Citizens
§ Conduct hydrologic analysis
§ Calculate impervious surface areas
§ Analyze existing data
§ Review published reports
§ Analyze remote and field data
§ Analyze existing reports and data onmajor private and public developmentprojects
§ Analyze complaint records
§ Conduct air photo analysis of land useand habitat conditions.
§ Conduct targeted field inspections oflikely aquatic habitat and surface waterproblems.
• Description of importanthydrologic, geomorphic andecological processes affectingbasin
• Description of significantresource areas and habitatfunctions warrantingprotection
• Description of significantsurface water problemswarranting remediation
• Description of likely futurebasin conditions
1.4.2 Action Plan
The action plan identifies projects for inclusion in a comprehensive 6-year capital improvement program(CIP) that will reduce risks posed by surface water and groundwater problems to human health and safety,rural infrastructure, personal property, and aquatic resources. The projects resolve surface water,groundwater, and nearshore problems in a way that either maintains or improves aquatic habitats. Table1-2 describes the general types of activities included in the action plan.
…1. INTRODUCTION
1-3
1.5 REPORT CONTENTS
This report represents a reconnaissance level plan for both the Judd and Shinglemill Creek drainagebasins. It characterizes the existing stream and basin conditions of these two streams and describes capitalimprovements needed to reduce existing flooding, protect or improve water quality, protect or improvehabitat, and improve the overall health of these two basins. The report also identifies other island-widesurface water, groundwater, and habitat needs.
Chapter 2 discusses land cover characteristics in the Judd Creek and Shinglemill Creek basins and theireffects on hydrology and habitat. Chapter 3 analyzes basin hydrology for pre-development, existing(2001), and future conditions. Chapters 4, 5, 6, and 9 discusses the island’s groundwater, geomorphology,water quality, and drainage impacts and needs. Chapter 7 contains stream habitat analysis for Judd andShinglemill Creeks and a general discussion of island-wide habitat needs. Chapter 8 summarizesconditions of the island’s nearshore areas. Chapter 10 summarizes the findings in Chapters 4 through 9and contains the results of watershed vulnerability analyses for the Judd Creek and Shinglemill Creekbasins. Chapter 11 discusses the actions that have been identified and provides a recommended actionplan.
1.6 PUBLIC INVOLVEMENT
The County and the consultant performing this study met with the Vashon-Maury Island GroundwaterProtection Committee and leadership from the Vashon-Maury Island Land Trust and other watershedgroups on April 3, 2003.
The purpose of the meeting was to introduce the design team, describe the scope of work, present aninitial screening of projects, discuss a draft prioritization process, and discuss how to solicit input fromthe broader Vashon-Maury Island community. Input from the attendees was used to complete the draftreport and plan a community-wide meeting scheduled for early 2004.
Vashon-Maury Island Rapid Rural Reconnaissance Report…
1-4
TABLE 1-2.TYPICAL ACTIVITIES INCLUDED IN ACTION PLAN
Description Purpose Typical Examples
Restoreecosystemprocesses
Restore natural flows andsediment regimes toalleviate downstreamproblems and improvesystem-wide habitatconditions.
§ Protect or acquire significant open space contributing to ecosystemhealth (e.g. headwater wetlands, groundwater recharge areas,estuarine salt marsh areas, riparian areas).
§ Reduce impervious surfaces and cleared, compacted lands e.g.gravel parking areas.
§ Increase natural forest cover and soil depths.
§ Improve infiltration of surrounding soils to mimic naturalconditions by planting and other vegetation.
§ Construct retention and detention ponds that correctwater quality and flooding problems.
§ Allow natural formation of alluvial fans.
Restoreecologicalconnectivity
Restore fish passage andhabitat throughreconnection ofisolated/fragmentedenvironments.
§ Retrofit undersized or perched culverts, weirs, dams, etc.
§ Restore riparian buffers.
§ Prioritize levee removals.
§ Remove structures from within floodplains, alluvial fans andchannel migration areas.
§ Restore side channels.
Addressproblems wherethey areexpressed on thelandscape
Alleviate significant healthand safety or aquatichabitat problems withsubstantial impact on thecommunity.
§ Stabilize or restore stream banks.
§ Install or upgrade culverts.
§ Construct conveyance improvements.
§ Retrofit facilities for retention and detention.
§ Install storm drain lines.
Evaluation Analyze the effectivenessof identified actions